fix(cv): protect revisions and measure rendering readiness

This commit is contained in:
cesnimda
2026-10-07 07:56:35 +02:00
parent ac6d78289d
commit 046dc304aa
175 changed files with 16252 additions and 41 deletions
+3 -1
View File
@@ -1,6 +1,8 @@
# Phase 5 — Representative screens / major UI redesign plan
**Current successor: [P5-08b Job sections](p5-08b/README.md).** Seven URL-backed sections and Application/Timeline subsections recompose the existing owners on the Phase 4 foundations. [Native readiness proof](p5-08b-readiness/README.md) and the ordinary passing P2-D01 regression remain authoritative for frozen packages/ZIPs. P5-08a header/Overview and all compatibility routes remain. `followMode` metadata is preserved; mode-specific UI stays deferred to the mail phase by Connor's decision. [P5-07 Analytics](p5-07/README.md), [P5-06 Dashboard](p5-06/README.md) and [P5-04b Jobs integration](p5-04b/README.md) remain authoritative for their areas. P5-02 manual screen-reader acceptance remains mandatory for P5-15. F04, incomplete accessibility checks, native touch, Board scaling and recorded timing/preference-save observations remain open. P5-09 remains blocked by separate revision/rendering gates; no CV slice, Phase 8 or B07 has begun.
**Current successor: [P5-09 readiness](p5-09-readiness/README.md) — NO-GO for CV redesign.** Expected-version/atomic revision protection and recoverable drafts satisfy G-CV-REV locally. Measured preview/native PDF output passes 10 of 16 implemented fixture checks; six long-document cases remain materially misleading. G-CV-RENDER is open and requires a separate bounded pagination-fidelity repair before P5-09–14. No CV redesign or B07 has begun. P2-D01 remains an ordinary passing test; F04 and manual screen-reader acceptance remain open.
**Previous implementation: [P5-08b Job sections](p5-08b/README.md).** Seven URL-backed sections and Application/Timeline subsections recompose the existing owners on the Phase 4 foundations. [Native readiness proof](p5-08b-readiness/README.md) and the ordinary passing P2-D01 regression remain authoritative for frozen packages/ZIPs. P5-08a header/Overview and all compatibility routes remain. `followMode` metadata is preserved; mode-specific UI stays deferred to the mail phase by Connor's decision. [P5-07 Analytics](p5-07/README.md), [P5-06 Dashboard](p5-06/README.md) and [P5-04b Jobs integration](p5-04b/README.md) remain authoritative for their areas. P5-02 manual screen-reader acceptance remains mandatory for P5-15. F04, incomplete accessibility checks, native touch, Board scaling and recorded timing/preference-save observations remain open. No CV redesign slice, Phase 8 or B07 has begun.
Historical planning checkpoint: source `2a2f9e48052c562ef599825458d0d3a6f9f9fc61`, inspected on 2026-09-13 on `codex/ui-redesign-phase4`. That checkpoint was documentation-only; the successor record above owns implementation/validation status.