feat(ui): establish semantic colors and focus foundation
This commit is contained in:
+2
-1
@@ -6,7 +6,8 @@
|
||||
- [x] Finalize Phase 1 separately, 2026-09-10: classify all 57 preservation groups, UX improvements, genuinely new/conditional requirements and baseline defects; retain already-implemented CV drag/fit, custom status values, calendar and other protected workflows. Final summary/contract/test limits/Phase 2 starting point: `docs/redesign/audit/PHASE1_SUMMARY.md`. Documentation only; B06/F04 closure remains open.
|
||||
- [ ] Complete the authorized `main` release through required CI/deploy gates. Main `27657f3` is pushed; run 743 passed 916 backend/298 frontend tests, lint, dependency audits and production builds, then the browser gate failed (worker SIGSEGV, retry timeout and closed-browser errors; 6 passed/12 failed). Deploy skipped; live remains version 299. Stop further release retries pending runner-host diagnostics; exact read-only handoff and evidence are in `docs/audits/2026-09-07/validation/b06-completion.md`. No gate was bypassed.
|
||||
- [x] Phase 3 from `d6d3dd9` on `codex/ui-redesign-phase3`: [UX architecture package](../redesign/phase-3/README.md), 31 existing route patterns, 57 PRES impact rows, data-qualified personal/admin dashboards, canonical/CV/job/frozen-document distinctions, contextual AI review, responsive/accessibility/component plans and explicit decisions. Documentation only; no Phase 4/visual implementation or B07. F04 remains open.
|
||||
- [ ] Next redesign work, not started: [P4-01 semantic state/focus foundation](../redesign/phase-3/PHASE4_IMPLEMENTATION_PLAN.md) using existing MUI/theme and loaded regression fixtures. Keep current brand/routes/providers; coordinate validated A01. Do not begin broad shell/pages before foundation proof.
|
||||
- [x] P4-01 from `f696f23` on `codex/ui-redesign-phase4`: [semantic colors, focus and loaded-state checkpoint](../redesign/phase-4/p4-01/README.md). Existing MUI foundation, provisional brand, routes/providers and status meanings retained. Final 916 backend / 333 frontend pass; browser 35 actual passes + unchanged P2-D01 expected failure. Both-theme keyboard/loaded scans and visual evidence recorded; no broad layout or route redesign. F04 remains open.
|
||||
- [ ] Recommended next, not started: [P4-02 shared naming/interaction foundation](../redesign/phase-3/PHASE4_IMPLEMENTATION_PLAN.md). Carry forward unnamed Customize controls and command input, modal/async announcement review and manual accessibility gaps from P4-01. Do not begin before checkpoint review; no B07.
|
||||
- [ ] P3-O01/P3-O02 separately scoped presentation debt: accurate analytics population/period labels and navigation/query/error retention when those surfaces migrate. [Source observations and boundaries](../redesign/phase-3/OPEN_DECISIONS.md); no analytics, route or command behavior fixed during Phase 3.
|
||||
|
||||
# Expanded production audit — 2026-09-07
|
||||
|
||||
Reference in New Issue
Block a user