From 19dad316ab32b1013b13040abab756f6b0203249 Mon Sep 17 00:00:00 2001 From: cesnimda Date: Tue, 3 Nov 2026 14:30:29 +0100 Subject: [PATCH] docs(ui): record career qualification and publication --- docs/ui-modernisation/CAREER_PUBLICATION.md | 11 +++++++++++ 1 file changed, 11 insertions(+) create mode 100644 docs/ui-modernisation/CAREER_PUBLICATION.md diff --git a/docs/ui-modernisation/CAREER_PUBLICATION.md b/docs/ui-modernisation/CAREER_PUBLICATION.md new file mode 100644 index 00000000..3ec1fa39 --- /dev/null +++ b/docs/ui-modernisation/CAREER_PUBLICATION.md @@ -0,0 +1,11 @@ +# Career/document publication and next owner gate + +3 November 2026. Implementation `6f801251b0d44e0dfb18365ba3102a3d4d482313` on `codex/a3-ui-06` was pushed successfully. Independent `git ls-remote --heads origin refs/heads/codex/a3-ui-06` returned that exact commit. Committed source/evidence manifest verification matched all26 sources and151 evidence files with zero mismatches;80 static-export assets are separately hashed. + +Local qualification:212 unique selected frontend cases/ten suites and103 isolated backend cases passed; types/full lint/build and final verifier lint/diff check passed. Full16-config browser matrix has96 axe scans; six EN/light boundary/focus configs have36 scans, four configs overlap,108 unique validated screenshots (plus one failed diagnostic PNG). All14 edit targets passed visible/unobscured focus at320/390/768/1000/1001/1440. Deliberate saves are intercepted fixtures only. Independent source review57 passing cases overlaps212; independent verifier review reconciled counts and fixture limits. + +The original A3-IM06 implementation authorisation is satisfied within [CAREER_VALIDATION.md](CAREER_VALIDATION.md)'s scope. **Owner Gate F review remains pending** before A3-IM07 Calendar/reminders/correspondence/documents. No generic continued-development instruction waives that milestone gate. Earlier UI01–05 approvals remain accepted and must not be repeated. + +Do not treat this as full Phase10, Product Review, European localisation, Global Jobs provider, import-engine, native-device, physical PDF, final integrated security or release acceptance. No main merge/deployment. Independent `ca519cac` date localisation and `de3d5031` security policy remain isolated; no older workstream source was wholesale merged. The generated graph remains local and untracked. + +Next independent eligible candidate while the owner reviews: reproduce and localise fixed-decimal attachment size presentation in the existing attachment owners on the separate localisation branch. Follow the existing number-formatting contract, preserve units/thresholds and unknown/zero semantics, test EN/NB, then reconcile that small patch before any A3 integration. Final integration of completed isolated patches requires combined checks.