docs(roadmap): preserve failed A3 receipt publication result
This commit is contained in:
@@ -2,6 +2,8 @@
|
||||
|
||||
3 November 2026 — newest design checkpoint: `237c79b8cb3e280d7e4d1ef95cdbb2c77bb81c69` on local-only `codex/product-modernisation`, worktree `C:\Users\Connor\.codex\worktrees\product-modernisation\Job tracker`. Consolidated A3 http://127.0.0.1:4317/a3.html; handoff `docs/product-modernisation/08-a3-handoff/README.md` in that worktree. Owner explicitly confirmed A3: original A1 dashboard, D1 foundation, B1 tracking, editor left/preview right, application context right, desktop grouped sidebar/hybrid mobile, overview-first Career Profile, agenda-first calendar/month preference and automation under Settings. Do not restart five-concept exploration. Final production design/implementation approval remains OPEN (Gates C/D/E); no production UI replacement was authorised or implemented.
|
||||
|
||||
Publication result: local roadmap receipt `3eca2df0ad396544e4d2d1a60b4aed7164f127dc` committed successfully. Normal push to origin/feature/phase10-cleanup FAILED: `Failed to connect to git.cesnimda.uk:443 after 21119 ms: Could not connect to server`. Independent `git ls-remote --heads` also FAILED to connect after 21106 ms. No remote publication or verification is claimed for this receipt or the subsequent failure-record commit. Retry normal phase-branch publication/read-back when the existing remote becomes reachable; do not repair Gitea, change infrastructure or publish the restricted design branch.
|
||||
|
||||
Fresh isolated prototype evidence: 480 unique screen/layout/state conditions (320 populated + 160 generic states), 496 helper render/overflow calls including overlaps, 11 scoped behaviour checks, 44 screenshots and 50 scoped axe sweeps with zero returned violations. 57 inherited groups mapped (56 PARTIAL/1 DEFERRED retained), 34 inherited route strings confirmed in integration source. New direct profile edit/progress, local widget/calendar preferences, letter history/dirty navigation/optional fixed suggestion, account/session and processing-monitor interactions. Source/evidence manifest verified against committed Git bytes using LF-normalised text/raw PNG hashes. AST-only graph refresh completed locally (18,902 nodes/46,671 edges); generated graph remains untracked. Not real application E2E, full WCAG/native/device acceptance, provider/AI operation, Phase 10 or security/release acceptance. Advanced existing controls are explicitly retained components rather than fully simulated lab functionality.
|
||||
|
||||
Design commit is **not pushed or remotely verified**, under the design workshop's existing publication restriction. This primary continuation receipt may be published through the normal authorised Phase 10 development-branch workflow; it does not publish the design branch. Integration remains `d3d338376444b8abdcaf7200f682faa3daf1ad10` and earlier continuation `aa36075bef21385610c7522bf9fa8d7fc929fe89`; do not merge the older design branch application tree wholesale into integration. After explicit final approval, create implementation increments from the reconciled integration baseline and retain Gate F milestone reviews.
|
||||
|
||||
Reference in New Issue
Block a user