docs(roadmap): seal correspondence visual and recovery progress

This commit is contained in:
cesnimda
2026-11-11 14:20:42 +01:00
parent 53e41bcf3c
commit 2b5bd62265
5 changed files with 15 additions and 4 deletions
+8 -1
View File
@@ -1,6 +1,13 @@
# Direct execution continuation
Current published A3 ref:72be614496a5f8d0c47467007652288861906081; source5f61d8f7. Manual note and pasted-email recovery qualified with intercepted fixtures. Next: correspondence visual surfaces and remaining IM10 route/workflow states; protected owner/provider/security/release gates unchanged.
Current published A3 ref:214eb25fa557841d280b84b41e7f1e028511be7a; application source c6375876. Correspondence recovery, pasted-email recording and open surfaces are qualified within their recorded fixture scopes. Next: remaining Settings/import recovery and connected workflows. No immediate new owner decision is required for that independent work; protected gates remain pending.
## 11 November correspondence visual checkpoint
- Current published/ref-readback A3 `214eb25fa557841d280b84b41e7f1e028511be7a`; application/verifier source `c6375876`, visual evidence `e3ea2ef4`. V42–V44 are recorded in the discrepancy register. The history enclosure/empty error strip and enclosing continuity frame are removed; message cards, metadata, thread controls and scrolling remain.
- PASSED:33 affected cases/two suites, build/TypeScript and scoped lint. Final12 note-recovery configurations at390/768/1440 ×EN/NB ×light/dark passed60 scans and24 intercepted write attempts; separate390/NB/dark pasted canary passed five scans/two attempts. The canary overlaps a configuration and is not a complete pasted matrix on this source. Desktop/tablet/mobile screenshots inspected.170 committed source/evidence/export checks passed. The earlier27/33 suites and eight-configuration matrices remain source-bound and overlapping.
- Report: A3 `docs/ui-modernisation/visual-correction/CORRESPONDENCE_FLAT_REVIEW.md`. Route inventory remains34 routes/57 groups; `/jobs/:id` now includes scoped Correspondence ownership/evidence without accepting the whole route. Local AST graph update completed; generated graphs/TestResults remain untracked and preserved. Optional SQL extractor remains unavailable; no dependency installed.
- Next independently eligible work: remaining Settings and import error/recovery states; connected Career/document and application/follow-up journeys; review remaining Gmail candidate/link/refresh completion paths using offline fixtures. Cross-job unsaved correspondence draft navigation and server idempotency remain unqualified, with no promise that UI unmount cancels a committed POST. Keep final owner/human, Phase10 D02, homepage/provider, integrated security/recovery and release gates open. No orchestrator, main merge, production, model or real mailbox activity.
## 11 November pasted-email recovery