docs(redesign): complete Phase 1 audit checkpoint

This commit is contained in:
cesnimda
2026-09-10 07:22:09 +02:00
parent fc749b1a30
commit 2d0f131a99
5 changed files with 131 additions and 4 deletions
+1
View File
@@ -1,6 +1,7 @@
# Redesign — 2026-09-09
- [x] Read the Astra handoff and required product documents; complete Phase 1 source audit with 31 concrete route patterns, functionality preservation ledger, 266 API call sites, component/test inventory, identity/storage map, responsive/localisation assessment and migration gates. See `docs/redesign/audit/README.md`. No redesign implementation or B07 started.
- [x] Finalize Phase 1 separately, 2026-09-10: classify all 57 preservation groups, UX improvements, genuinely new/conditional requirements and baseline defects; retain already-implemented CV drag/fit, custom status values, calendar and other protected workflows. Final summary/contract/test limits/Phase 2 starting point: `docs/redesign/audit/PHASE1_SUMMARY.md`. Documentation only; B06/F04 closure remains open.
- [ ] Complete the authorized `main` release through required CI/deploy gates. Main `27657f3` is pushed; run 743 passed 916 backend/298 frontend tests, lint, dependency audits and production builds, then the browser gate failed (worker SIGSEGV, retry timeout and closed-browser errors; 6 passed/12 failed). Deploy skipped; live remains version 299. Stop further release retries pending runner-host diagnostics; exact read-only handoff and evidence are in `docs/audits/2026-09-07/validation/b06-completion.md`. No gate was bypassed.
- [ ] Next redesign work: Phase 2 functional baseline, subject to the audit's integrity/recovery and release gates. No automatic implementation in Phase 1.