docs(match): record term-quality evidence
CI and Deploy / test (pull_request) Failing after 1m33s
CI and Deploy / deploy (pull_request) Has been skipped

This commit is contained in:
cesnimda
2026-08-09 18:49:41 +02:00
parent da1aa8bb2a
commit 3143568df0
8 changed files with 100 additions and 24 deletions
+10 -10
View File
@@ -2,17 +2,17 @@
Updated: 2026-08-09
- **Exact current task:** QA-001 — re-read the specified Norwegian/English quality fixtures and trace import cleanup, language/token/phrase/skill/scoring/cache/version/UI-label behavior before editing.
- **Last completed step:** UX-002 implementation `11734ee` was committed. Deterministic user/anonymous/System precedence, pre-paint bootstrap, in-place provider switching, auth-user/cross-tab events and mobile Settings tabs pass automated/build/browser verification. Evidence/tracking are ready for their own commit and push.
- **Files currently modified:** UX-002 verification/evidence/tracking documents and three synthetic screenshots under `docs/audits/evidence/ux-002/`. UX-002 application code is committed.
- **Commands already run:** UX-002 complete theme/auth/provider/router/bootstrap trace; focused 6/6 and full 172/172 frontend tests; production build; diff checks; local browser Light/Dark/System/navigation/refresh/two-tab/375/768/1440 checks; implementation commit. See V-111V-113.
- **Test results:** backend baseline 594/594; frontend 48/48 suites and 172/172 tests; UX-002 focused 6/6; production frontend build and diff check pass. Browser theme checks and final console inspection pass; authenticated multi-user/production remain.
- **Exact current task:** CAREER-001 — re-read Career Workspace requirements and trace first-run, completeness, CV import review, queued processing/failure and recent-document actions before editing.
- **Last completed step:** QA-001 implementation `da1aa8b` was committed. Bilingual/chrome filtering, bounded phrases, expanded canonical technology tags and honest important-term labels pass all automated/build gates. Evidence/tracking are ready for their own commit and push.
- **Files currently modified:** QA-001 verification/evidence/tracking documents only. QA-001 application code is committed; no screenshots were captured.
- **Commands already run:** QA-001 complete import/language/tagger/matcher/API/UI/learning/cache trace; seven required fixtures; affected and full backend/frontend tests; production build; diff checks; implementation commit. See V-114V-116.
- **Test results:** backend 601/601; QA matcher 15/15; affected backend 54/54; frontend 48/48 suites and 172/172 tests; affected UI 13/13; production build and diff check pass. Browser/production QA presentation remains.
- **Services currently running:** none started by this session. The Next development server was stopped and in-app browser tabs finalized. Pre-existing Docker services were not changed.
- **Temporary files or processes:** none. No dependency declaration, database or private artifact changed.
- **Production changes currently active:** none. No deployment, provider/model call, private CV access, model pull, paid service, production migration or external payload occurred.
- **Rollback status:** UX-002 has no schema/dependency migration; revert `11734ee` while retaining existing preference keys. UX-001/AI-004 rollback records remain current. Production is unchanged.
- **Uncommitted changes:** UX-002 evidence/master tracking documents and screenshots only; commit/push these before QA-001 application code.
- **Known failures:** authenticated two-user/production theme smoke remains; configured/real-provider UX-001 browser checks remain; MariaDB/SMTP/production unavailable; SEC-006 upgrades require explicit internet/package-index permission; parser isolation remains SEC-007; historical clean EF-only SQLite chain needs startup reconciliation; Jest reports its existing force-exit/open-handle notice.
- **Exact next action:** commit and push UX-002 evidence, then read `work.md:174-263`, `ollama.md:177-223`, PROD-002 fixtures and every job-analysis producer/cache/UI consumer; reproduce the seven specified quality cases before editing.
- **Work that can continue independently:** QA-001 and subsequent repository UX packages. SEC-006/007 await package-index permission; PROD-001/003/004 await production access.
- **Rollback status:** QA-001 has no schema/cache/dependency migration; revert `da1aa8b` to restore the prior term set/labels. Earlier rollback records remain current. Production is unchanged.
- **Uncommitted changes:** QA-001 evidence/master tracking documents only; commit/push these before CAREER-001 application code.
- **Known failures:** QA-001 browser/production presentation; authenticated two-user/production theme smoke; configured/real-provider UX-001; MariaDB/SMTP/production unavailable; SEC-006 needs explicit internet/package-index permission; parser isolation remains SEC-007; historical clean EF-only SQLite chain needs startup reconciliation; Jest retains its open-handle notice.
- **Exact next action:** commit and push QA-001 evidence, then read `work.md:265-307`, Career Workspace components/tests, CORE-001 data shapes and AI-004 operation states; reproduce first/returning/incomplete/queued/review/failure paths before editing.
- **Work that can continue independently:** CAREER-001/002 and later repository UX packages. SEC-006/007 await package-index permission; PROD-001/003/004 await production access.
- **Decisions still required from the user:** none for synthetic repository work. Internet/package upgrades, private CV access, external/paid providers and production actions retain their explicit approval/safety gates; SEC-009 retention/legal policy remains unresolved.