feat(cv): redesign editor frame and section navigation

This commit is contained in:
cesnimda
2026-10-07 12:42:16 +02:00
parent efc9e7bdd4
commit 44b944e5ed
45 changed files with 19230 additions and 55 deletions
+4 -2
View File
@@ -1,6 +1,8 @@
# Phase 5 — Representative screens / major UI redesign plan
**Current successor: [CV pagination-fidelity repair](p5-09-pagination-readiness/README.md) — GO for P5-09.** The original 16 fixtures now pass the unchanged PDF oracle, including all six former page-count/placement failures. Preview uses native fragmentation, renderer-owned geometry/print rules and deterministic settled measurement; PDF output is unchanged. [Revision readiness](p5-09-readiness/README.md) remains accepted. Baseline: **941 backend / 422 frontend / 98 actual browser passes**, security 9/6/1, configuration 3. Broader font/photo/wrapped-line qualification remains explicit; no CV redesign or B07 has begun. P2-D01 remains an ordinary passing test; F04 and human screen-reader acceptance remain open.
**Current successor: [P5-09 CV editor frame/navigation](p5-09/README.md) — accepted locally, stop before P5-10.** Content-first studio, compact CV identity/scope/save/actions, ordered section navigation and keyboard pane entry retain the existing forms, revision owner and native renderer. Baseline: **941 backend / 426 frontend / 102 actual browser passes**, security 9/6/1, configuration 3; revision 5/5 and original fidelity 16/16, 36 aligned pages. Actual EN/Bokmål, light/dark, desktop/intermediate/phone evidence and incomplete accessibility findings are recorded. Production font/photo qualification, F04 and human screen-reader acceptance remain open. No P5-10+, Phase 8 or B07 implementation occurred.
**Previous readiness: [CV pagination-fidelity repair](p5-09-pagination-readiness/README.md) — GO for P5-09.** The original 16 fixtures passed the unchanged PDF oracle, including all six former page-count/placement failures. Preview uses native fragmentation, renderer-owned geometry/print rules and deterministic settled measurement; PDF output is unchanged. [Revision readiness](p5-09-readiness/README.md) remains accepted. That checkpoint's baseline was **941 backend / 422 frontend / 98 actual browser passes**, security 9/6/1, configuration 3. No CV redesign or B07 had begun at that readiness checkpoint. P2-D01 remains ordinary passing; broader font/photo/wrapped-line qualification and production/manual acceptance remain explicit.
**Previous implementation: [P5-08b Job sections](p5-08b/README.md).** Seven URL-backed sections and Application/Timeline subsections recompose the existing owners on the Phase 4 foundations. [Native readiness proof](p5-08b-readiness/README.md) and the ordinary passing P2-D01 regression remain authoritative for frozen packages/ZIPs. P5-08a header/Overview and all compatibility routes remain. `followMode` metadata is preserved; mode-specific UI stays deferred to the mail phase by Connor's decision. [P5-07 Analytics](p5-07/README.md), [P5-06 Dashboard](p5-06/README.md) and [P5-04b Jobs integration](p5-04b/README.md) remain authoritative for their areas. P5-02 manual screen-reader acceptance remains mandatory for P5-15. F04, incomplete accessibility checks, native touch, Board scaling and recorded timing/preference-save observations remain open. No CV redesign slice, Phase 8 or B07 has begun.
@@ -66,7 +68,7 @@ Fresh local planning checks (2026-09-13):
The two `.artifacts` validators are ignored local review tools, not new CI/application files. They validate documentation structure/targets, not future implementation behavior. Full application suites were not rerun for prose; their last actual evidence is the unchanged baseline above. Git push is limited to the requested feature branch; remote SHA and clean-tree status are verified and reported with the final commit. No production deployment or external provider check is claimed.
## Recommended next instruction
## Historical planning next instruction
“Implement **P5-00 — Shell readiness gates only** from the documentation checkpoint, following `READINESS_GATES.md` and `PHASE5_PLAN.md`. Reproduce/protect each prerequisite against the current UI, preserve application behavior, run the full baseline, record real visual/accessibility evidence, commit/push the bounded readiness checkpoint, and stop before P5-01.”