docs(redesign): accept Phase 6 review and prepare Phase 7 handoff
This commit is contained in:
@@ -13,9 +13,9 @@ Fetched development HEAD/remote: `9d6d29dba4733778e478909d4ff74a25409b3115`, `co
|
||||
- [x] **P6-00:** Review Phase 3/4/5 records, all 57 original PRES contracts and actual source; record surface/state coverage, prioritized findings, preserved dirty intake and baseline. Audit pushed at `7da083c`, remote=HEAD.
|
||||
- [x] **P6-01:** Shared semantic/contrast/tab associations verified; final521 unit cases and4 native panel cases pass. Pushed `a94ea0a`, remote=HEAD; full native cross-route acceptance follows in P6-05.
|
||||
- [x] **P6-02:** Navigation/query/history/source/override and AI boundaries reviewed; company dialog and account-language failures retain drafts/local choice and translated retry. Native4/4 passes including real persistence/reload. Pushed `c135d03`, remote=HEAD.
|
||||
- [x] **P6-03:** Recorded attributed EN/Bokmål, theme, responsive, keyboard, zoom and axe baseline with all incomplete categories retained; inspected fourteen baseline and four label before/after images. Bounded mobile label repair has native RED→GREEN2/2 and final Settings/label6/6. Fresh521 units/types/lint/build pass; integrated acceptance follows in P6-05. Human M01–M13 and physical-device acceptance remain unverified. Push receipt follows in the ledger.
|
||||
- [x] **P6-04:** Fresh post-CSS native diagnostic1/1 records bundle/source provenance, route/client/query/search/long-CV observations and complete200/1,000 Board membership. Actual-provider regression in521-unit corpus disproves toast-induced company refetch; no speculative memoization. Reuse/source/fetch audit and finite scaling limits recorded. Push receipt follows in the ledger; integrated evidence follows in P6-05.
|
||||
- [ ] **P6-05:** Run fresh full frontend/backend/browser/sidecar/security/HTTP/rendering lanes, explain count changes, reconcile 57 groups, record secret/link/whitespace/build evidence and every commit/push. Report independent Phase 6, production and Phase 7 decisions; prepare migration order and mandatory dependencies. Commit/push final acceptance.
|
||||
- [x] **P6-03:** Recorded attributed EN/Bokmål, theme, responsive, keyboard, zoom and axe baseline with all incomplete categories retained; inspected fourteen baseline and four label before/after images. Bounded mobile label repair has native RED→GREEN2/2 and final Settings/label6/6. Fresh521 units/types/lint/build pass; final159/159 ordinary regression passes. Human M01–M13 and physical-device acceptance remain unverified. Pushed `bd47214`, live remote=HEAD; conditional integrated acceptance follows in P6-05.
|
||||
- [x] **P6-04:** Fresh post-CSS native diagnostic1/1 records bundle/source provenance, route/client/query/search/long-CV observations and complete200/1,000 Board membership; the extended case also passes within final159/159 ordinary regression. Actual-provider regression in521-unit corpus disproves toast-induced company refetch; no speculative memoization. Reuse/source/fetch audit and finite scaling limits recorded. Pushed `badfb19`, live remote=HEAD; conditional integrated acceptance follows in P6-05.
|
||||
- [x] **P6-05:** Fresh full frontend521/backend1,033/browser159/sidecar49 plus separate security/HTTP/diagnostics and original16/36+8/24 rendering comparisons pass. Counts,57 groups,32 routes and all319 mixed-scope axe snapshots are reconciled; secret/link/whitespace checks pass with their stated limits. Final decisions: Phase6 CONDITIONAL GO, production NO-GO, Phase7 CONDITIONAL GO with mandatory dependencies. Phase7 plan only; final commit/push receipt follows in the ledger.
|
||||
|
||||
## Review focus
|
||||
|
||||
|
||||
Reference in New Issue
Block a user