feat(documents): add owner-scoped document workspace

This commit is contained in:
cesnimda
2026-10-16 18:22:19 +02:00
parent 8e4db121ae
commit 5a67ec3d3d
19 changed files with 4932 additions and 9 deletions
+6 -1
View File
@@ -1,6 +1,6 @@
# P7-07 — Documents metadata contract
**Status: backend contract implemented, implemented-scope CONDITIONAL GO; final affected/native checks pass. Hygiene, commit and normal push remain pending. P7-07 remains ongoing; Documents UI waits for the contract push.** This is the first P7-07 boundary in the [approved handoff](../../phase-6/p6-05/PHASE7_HANDOFF.md#migration-order-and-commit-boundaries), implementing the owner projection required by [Documents architecture](../../phase-3/DOCUMENTS_UX.md).
**Status: backend contract implemented, implemented-scope CONDITIONAL GO; affected/native checks and hygiene pass. Normal push verified as8e4db12. P7-07 remains ongoing; the separate [Documents UI](UI.md) is in progress.** This is the first P7-07 boundary in the [approved handoff](../../phase-6/p6-05/PHASE7_HANDOFF.md#migration-order-and-commit-boundaries), implementing the owner projection required by [Documents architecture](../../phase-3/DOCUMENTS_UX.md).
## Bounded implementation
@@ -83,3 +83,8 @@ All **57 PRES groups remain 56 PARTIAL / C11 DEFERRED**; C05–C12/W05–W08/M04
**Contract implemented-scope acceptance: CONDITIONAL GO; hygiene and normal push pending. P7-07: ongoing; Documents UI not started. Actual MariaDB execution and manual acceptance remain unverified. Production: NO-GO; main unchanged. Phase 8: no implementation.**
Final metadata-contract hygiene PASS observed 2026-10-14T16:00:00.842457+00:00: secret and working/staged/phase whitespace gates pass;18 docs/504 local links resolve,57 groups and32 original routes retained. Backend contract implemented CONDITIONAL GO; normal development push pending. Actual MariaDB execution and Documents UI remain unverified; main unchanged, production NO-GO.
## Contract push and UI continuation — 2026-10-16
Metadata contract normal push directly verified as **8e4db121ae0ec3f1637c83ddeaa3f31abd0a61be** at 2026-10-14T16:02:14.215615 UTC: clean HEAD = origin = live development; main27657f3 unchanged. Backend implemented scope remains CONDITIONAL GO, with actual MariaDB execution unverified. A fresh fetch on 2026-10-16 found no intervening commits. The separate Documents interface now proceeds; its entry and bounded requirements are recorded in the P7-07 UI report. Earlier pending-push statements are historical observations. No production deployment or Phase8 implementation.