feat(documents): add owner-scoped document workspace
This commit is contained in:
@@ -1,6 +1,6 @@
|
||||
# P7-07 — Documents owner-scoped index
|
||||
|
||||
**Backend implemented scope: CONDITIONAL GO; final hygiene and normal push pending. Documents UI has not started.** Follow the exact [Phase 6 handoff](../../phase-6/p6-05/PHASE7_HANDOFF.md#migration-order-and-commit-boundaries) and [Documents architecture](../../phase-3/DOCUMENTS_UX.md). Implement and push the metadata projection before the interface.
|
||||
**Implemented local scope: CONDITIONAL GO; final hygiene PASS.** The backend contract was normally pushed as `8e4db12`; the separate [Documents interface](UI.md) now passes its affected component, native, build and finite visual checks. The configured Git host is currently unreachable, so publication is pending and this checkpoint is not closed or reported synchronized. Follow the exact [Phase 6 handoff](../../phase-6/p6-05/PHASE7_HANDOFF.md#migration-order-and-commit-boundaries) and [Documents architecture](../../phase-3/DOCUMENTS_UX.md). The contract was pushed before interface implementation.
|
||||
|
||||
The preceding compose commit `223dcf57d26bab624261994b61a46f2d3e2dd5b2` was normally pushed and directly verified at **2026-10-14 11:03:15.576853 UTC**: clean HEAD = origin = live development; local/origin/live main remains `27657f31131cd95d42f0e1290853ec9c9b3959a4`. [Entry evidence](evidence/entry.json) records the receipt and fresh existing-contract baseline: **37 passing cases**, unchanged Release DLL, with all20 captured sources unchanged before/after. This is an existing-contract subset, not a Documents endpoint or full-suite execution.
|
||||
|
||||
@@ -22,10 +22,27 @@ Keep ordinary P2-D01 and exact frozen HTML/letter/archive-byte proof. The old Ph
|
||||
|
||||
All57 preservation groups remain56 PARTIAL / C11 DEFERRED, with32 original routes preserved. Derived inventory is739/94 frontend,301 browser,1041 backend; it is not a fresh integrated pass count. Human reader, physical touch/software keyboard, zoom, provider/output and release conditions remain open. P5-13 is withheld; P7-06F is deferred; main unchanged, production NO-GO. No Phase8 implementation.
|
||||
|
||||
Next: finish the backend contract and its bounded evidence, commit/push/verify it, then migrate the Documents interface using the existing shared design system.
|
||||
The observations below retain the contract's chronology. The latest interface result is recorded at the end and in its separate report; earlier pending statements are historical.
|
||||
|
||||
## Final backend observation
|
||||
|
||||
[Contract report](CONTRACT.md) and [portable results](evidence/contract-results.json) record final12/12 new contracts,80/80 related/auth/draft cases and actualProgram/nativeSQLite cookie3/3 plus ordinaryP2-D01PASS. Full .NET whitespace semantics, ordinal Unicode marker handling, actual bound pagination parameters, frozen metadata/bytes and strict tenant cases retain ordinary assertions. All failed attempts and source/timing qualifications remain. Final26/33/23 sources and binaries match; Release compilation and browser types pass. There is no DocumentsUI/axe/physical/human acceptance yet, and actualMariaDB execution remains unverified. Derivedbackend1053/browser304/frontend739/94 are not integrated passing counts. Hygiene and normal development push follow; the UI starts only after verified contract push.
|
||||
|
||||
Final metadata-contract hygiene PASS observed 2026-10-14T16:00:00.842457+00:00: secret and working/staged/phase whitespace gates pass;18 docs/504 local links resolve,57 groups and32 original routes retained. Backend contract implemented CONDITIONAL GO; normal development push pending. Actual MariaDB execution and Documents UI remain unverified; main unchanged, production NO-GO.
|
||||
|
||||
|
||||
## Contract push and UI continuation — 2026-10-16
|
||||
|
||||
Metadata contract normal push directly verified as **8e4db121ae0ec3f1637c83ddeaa3f31abd0a61be** at 2026-10-14T16:02:14.215615 UTC: clean HEAD = origin = live development; main27657f3 unchanged. Backend implemented scope remains CONDITIONAL GO, with actual MariaDB execution unverified. A fresh fetch on 2026-10-16 found no intervening commits. The separate Documents interface now proceeds; its entry and bounded requirements are recorded in the P7-07 UI report. Earlier pending-push statements are historical observations. No production deployment or Phase8 implementation.
|
||||
|
||||
## Documents interface — final local evidence
|
||||
|
||||
[Portable UI results](evidence/ui-results.json) record **86 cases in eight frontend suites**, **eight new Documents browser journeys**, **four existing CV frame journeys** and **ordinary P2-D01**, all passing on the final captured source. App/browser TypeScript, lint and production build pass. The build is `H6tIi63meKxiKJUAiZrOm`; all 29 source existence/hash records and three API/test/build identities match before and after the final native batch. This interface changes no backend source or renderer.
|
||||
|
||||
All **18 final images** were actually reviewed: 17 Documents states/layouts and the existing frozen-package consumer image. The 15 default-enabled plus target-size axe scans have zero violation nodes and **101 incomplete nodes**, all retained and contextually triaged. Human screen-reader, real zoom, physical touch/software keyboard and production output acceptance remain open. A cramped attachment-error action was moved below its message and verified in the rebuilt page. Minor long-action wrapping at 1024px and the existing raw CV `Not Found` error copy remain explicit P7-11 residuals.
|
||||
|
||||
The original 32 routes remain; `/documents` adds a supported 33rd route. All 57 preservation groups remain 56 PARTIAL / C11 DEFERRED. Added coverage derives frontend **755/95**, browser **312**, backend **1,053**; these are inventories, not a fresh integrated regression result. P7-12 still owns that run. P5-13 remains withheld, followMode deferred and production NO-GO. `main` is unchanged; Phase 8 has not started.
|
||||
|
||||
The configured Git host refused port-443 connections during the later recorded fetch attempts. Commit/push outcome will be recorded after the actual attempt. P7-08 through P7-12 remain; their approved order and dependencies are unchanged.
|
||||
|
||||
Final [static checks](evidence/ui-static-checks.json) passed at **2026-10-16 16:21 UTC**: secret scan and working/staged/phase whitespace checks, 19 documents / 518 local links, all 57 preservation groups and 33 current routes. Static checks verify local main/origin-main refs only; they do not establish current remote or production state.
|
||||
|
||||