docs(redesign): record Documents publication blocker

This commit is contained in:
cesnimda
2026-10-16 18:31:39 +02:00
parent 5a67ec3d3d
commit 84350b71a6
8 changed files with 186 additions and 3 deletions
+4
View File
@@ -97,3 +97,7 @@ The additions derive frontend inventory **755/95** from **739/94**: 15 new Docum
All **57 PRES groups remain 56 PARTIAL / C11 DEFERRED**. Preserve the original 32 routes alongside the approved new route, owner/tenant authorization, canonical Career Profile data, CV overrides/revisions, one-job CV associations and immutable package content/files. Fresh P2-D01 passes as an ordinary case on latest H6; neither the earlier contract nor prior bDQ run is substituted for it.
Final [static checks](evidence/ui-static-checks.json) pass at **2026-10-16 16:21 UTC**: secret scan, working/staged/phase whitespace, 19 documents / 518 local links, all57 groups and33 routes. Commit and verify the normal development push once remote access recovers. Retain every triaged contrast/manual qualification and the P7-11 missing-source copy finding. No actual MariaDB runtime, external provider delivery or fresh PDF corpus qualification is supplied by these UI tests. P5-13 remains withheld with **zero model qualification calls**; followMode stays deferred. Phase 8 is not implemented. **UI implemented-scope acceptance: CONDITIONAL GO locally; hygiene PASS, commit/push follow. P7-07 publication: pending. Production: NO-GO; main unchanged.**
## Actual local commit and failed publication — 2026-10-16
Documents interface commit **`5a67ec3d3d5dc27298814b0a3f46540cb54ea3a3`** is safely recorded locally. Its [actual publication receipt](evidence/ui-publication.json) records the normal development push **16:22:30.090899–16:22:51.339211 UTC**, exit **128**, because `git.cesnimda.uk:443` could not be reached. No synchronization or remote acceptance is claimed. The previously verified remote development commit remains `8e4db12`; that is historical evidence. Main was not pushed. Implemented local scope remains CONDITIONAL GO; P7-07 publication is blocked. Independent P7-08 contract review and baseline checks can proceed, while P7-12 still requires every executed slice to be pushed before integrated acceptance.