test(a11y): demonstrate clipped initial mobile CV preview

This commit is contained in:
cesnimda
2026-10-10 21:02:38 +02:00
parent 6fb440aa23
commit 84e3bb5b44
9 changed files with 144 additions and 7 deletions
+1 -1
View File
@@ -4,7 +4,7 @@
[02 audit](p5-15-02/README.md), [native coverage](p5-15-02/TEST_COVERAGE.md), [findings](p5-15-02/DEFECTS.md), [reflow measurements](p5-15-02/RESPONSIVE_RESULTS.md) and [manual packet](p5-15-02/MANUAL_ACCEPTANCE.md) now supersede the prior “02 not started” statements. Application/API/renderer behavior is unchanged. Actual Chromium100/200/400 zoom is measured separately from touch emulation, screen-reader speech and physical-device/software-keyboard acceptance. Owner reports a reader operator available; actual results remain NOT VERIFIED until supplied.
**P5-15-02: NO-GO for P5-15-03** on confirmed P1 keyboard upload/import failure. Reduced-motion drawer return, source-editor404 and small report targets also need bounded disposition. [57-group matrix](PRESERVATION_ACCEPTANCE.md) now reconciles **0PASS/51PARTIAL/5FAIL/1DEFERRED/0BLOCKED/0NOT VERIFIED** while retaining every historical status column. Separate UI-rule warnings/manual gaps are not automatically failures. Complete regression/fidelity and final audit reconciliation are still being collected at this intermediate record; known failures are neither skipped nor expected-failing.
**P5-15-02: NO-GO for P5-15-03** on confirmed P1 keyboard upload/import failure and the [native initial mobile CV/PDF mismatch](p5-15-02/evidence/mobile-preview-proof.json). Reduced-motion drawer return, source-editor404 and small report targets also need bounded disposition. [57-group matrix](PRESERVATION_ACCEPTANCE.md) now reconciles **0PASS/50PARTIAL/6FAIL/1DEFERRED/0BLOCKED/0NOT VERIFIED** while retaining every historical status column. Separate UI-rule warnings/manual gaps are not automatically failures. Complete regression/fidelity and final audit reconciliation are still being collected at this intermediate record; known failures are neither skipped nor expected-failing.
P5-13 remains deferred/unqualified/Production-withheld0/366,0human semantic reviews, UI unimplemented. Production main remains unchanged/NO-GO; F04, current complete backup/tested restore, configuration/schema/secrets, rollback and deployed acceptance remain open. No automatic P5-15-03/04, P5-13, B07 or deployment follows from this audit.