feat(settings): complete privacy usage and data recovery presentation
This commit is contained in:
@@ -2,9 +2,9 @@
|
||||
|
||||
## Current continuation — 20 October 2026
|
||||
|
||||
P7-00–08 and P7-09 Preferences/Connections remain implemented CONDITIONAL GO. The [P7-09 import prerequisite](p7-09/IMPORT_COMPATIBILITY.md) now passes full frontend 837/97, full backend 1057, affected native 25 and type/lint/build gates. Its backend prerequisite `5addcde` is pushed and remotely verified; import UI publication follows final hygiene. Browser inventory is 335, with full integrated acceptance still due at P7-12. Privacy/usage/Quick Capture/backup, P7-10 Administration, P7-11 residual UI and P7-12 acceptance remain. The historical sections below retain their as-observed baselines.
|
||||
P7-00–08 and P7-09 presentation are implemented CONDITIONAL GO. The [P7-09 import prerequisite](p7-09/IMPORT_COMPATIBILITY.md) passes full frontend 837/97, full backend 1057, affected native 25 and type/lint/build gates, published as `3028d81`. [Remaining data presentation](p7-09/DATA_PRIVACY_BACKUP.md) has affected47/6 plus22backendcontracts and final native/type/lint/build evidence, with final consumer/hygiene/publication pending. Derived inventory is855/99frontend,339browser,1057backend; this is not a fresh full integrated suite. P7-10 Administration, P7-11 residual UI and P7-12 acceptance remain. The historical sections below retain their as-observed baselines.
|
||||
|
||||
The owner subsequently authorized main promotion despite existing release NO-GOs. Main currently contains `f9bf31c`, while the diagnostic Linux run exposed additional test portability, login-fixture and dialog accessibility failures. Release success is not claimed. P5-13 remains withheld, all 57 preservation qualifications remain binding, and Phase 8 implementation has not started.
|
||||
The owner subsequently authorized main promotion despite existing release NO-GOs. Main currently contains `cc79771`, including bounded repairs for all five causes found in diagnostic run828. Corrected run831 is queued behind older runs; release success is not claimed. Release repairs are merged and pushed on development as `36fc5d5`, with all unfinished source preserved. P5-13 remains withheld, all 57 preservation qualifications remain binding, and Phase 8 implementation has not started.
|
||||
|
||||
**Authorised development execution; production remains NO-GO.** The owner resolved the main/deployment conflict by directing Phase 7 to continue on development while keeping main unchanged. Follow the [original Phase 7 scope](../IMPLEMENTATION_PLAN.md#phase-7--full-migration) and the exact [Phase 6 handoff](../phase-6/p6-05/PHASE7_HANDOFF.md); this record does not replace the approved architecture or introduce another phase plan.
|
||||
|
||||
@@ -24,7 +24,7 @@ The entry commit is `b5319981ad3d1bd635daff861453d23c0de5320b` on `codex/ui-rede
|
||||
| P7-06F | Deferred `followMode` reviewed composer | Optional separately reviewed mail slice; **DEFERRED** until mode→draft/review action and fallback are explicitly decided |
|
||||
| [P7-07](p7-07/README.md) | Documents owner-scoped index | Implemented CONDITIONAL GO; contract/UI published and directly verified through9dfea12 at21:01:11UTC. Final affected86/8, native8+CV4+ordinaryP2-D01/types/lint/build PASS;18 reviewed PNGs,15axe0/101 qualified. Original32+Documents=33routes; actual MariaDB/human/device/production qualifications remain |
|
||||
| [P7-08](p7-08/README.md) | Existing notifications and operations | Implemented CONDITIONAL GO and published: UTC9dfea/recent40cfe04/Operationsc5176e3, clean direct refs verified02:03:53UTC. Ops77/7+native12/types/lint/build/14Ops+1P2image reviews PASS;12Opsaxe0/3+14notifaxe0/102 qualified.57groups33routes/F20 preserved |
|
||||
| [P7-09](p7-09/README.md) | Remaining Settings, Connections and data lifecycle | Sender repair dac2927 published. Preferences/Connections91/6+backend52+native17+gates PASS; all18 new PNGs reviewed; final hygiene PASS, e7dba9a normal push directly verified clean08:50:42UTC. Data/privacy/plan/backup follows with separate import compatibility prerequisite. Rules/save owners and all qualifications retained |
|
||||
| [P7-09](p7-09/README.md) | Remaining Settings, Connections and data lifecycle | Sender/Preferences published dac2927/e7dba9a; company/import prerequisites published5addcde/3028d81; release repairs merged/pushed36fc5d5 with all WIP preserved. Remaining data presentation implemented CONDITIONAL GO:47/6 affected frontend,22backendcontracts, nativeSettings9/import4/CSV1/P2-D01 +types/lint/build PASS;37axe0violations/141incomplete nodes qualified,six final PNGs inspected. Final consumer/hygiene/publication receipt follows. Inventory855/99frontend,339browser,1057backend; full integrated acceptance remainsP7-12 |
|
||||
| P7-10 | Admin operational presentation | Existing distinct Users/Audit/System routes and server authorization; planned |
|
||||
| P7-11 | Remaining Analytics/error/empty/dialog integration | Inventory-confirmed residual presentation only; existing reports remain; planned |
|
||||
| P7-12 | Integrated full-migration acceptance | Every executed slice pushed with finite evidence; fresh applicable full regression and all debt dispositions; planned |
|
||||
|
||||
Reference in New Issue
Block a user