From 8cdff28f0781e4c99efd06079149d9933e01cd4e Mon Sep 17 00:00:00 2001 From: cesnimda Date: Mon, 2 Nov 2026 01:02:03 +0100 Subject: [PATCH] docs(phase10): record blocked checkpoint publication --- docs/redesign/phase-10/HANDOFF.md | 8 ++++++-- docs/redesign/phase-10/P10-00.md | 5 +++-- docs/roadmap/todo.md | 1 + 3 files changed, 10 insertions(+), 4 deletions(-) diff --git a/docs/redesign/phase-10/HANDOFF.md b/docs/redesign/phase-10/HANDOFF.md index ad8929c..2ccb463 100644 --- a/docs/redesign/phase-10/HANDOFF.md +++ b/docs/redesign/phase-10/HANDOFF.md @@ -7,8 +7,12 @@ - Completed [P10-00](P10-00.md); preserved the existing staged worker draft with a dated review note. Only Markdown changed. - Fresh checks: 263 indexed evidence hashes, 1,280 current frozen source files and 7 verifier-source entries all match; 57 groups retain 56 PARTIAL/C11 DEFERRED; 34 distinct routes match the preserved register. Product suites were NOT RUN. Historical results remain historical. - Sole proposed candidate: **P10-01/CLEAN-20**, delete the unimported original CRA `job-tracker-ui/src/App.css`, blob `74b5e053450a48a6bdb4d71aad648e7af821975c`. Exact callers/data/routes, required checks, rollback and stop conditions are in P10-00. All other assessed compatibility code remains retained. -- **Await explicit candidate-specific owner approval in this chat. No implementation is authorised yet.** Do not treat approval of this stylesheet as permission for P10-02 or another initiative. -- Assessment checkpoint/publication: pending the normal commit/push/readback at the time this file was first written; append exact observed results below. Resolve current HEAD with Git, since this document cannot contain its own commit hash. +- **Await explicit candidate-specific owner approval in this chat and successful required publication. No implementation is authorised yet.** Do not treat approval of this stylesheet as permission for P10-02 or another initiative. +- Assessment checkpoint: **`7ba1367fd2e84375b3065eeedf9176a34996f77b`**, `docs(phase10): complete direct P10-00 assessment`. Four Markdown files, 258 inserted lines including the preserved staged draft. Documentation links, original-draft preservation, candidate hash and no-product-change assertions passed; staged `git diff --check` passed. Working tree was clean after that commit. +- **Publication FAILED / advancement BLOCKED.** Normal `rtk proxy git push -u origin feature/phase10-cleanup` exited 1: remote `fatal error: fault`, `SIGSEGV`, `github.com/go-enry/go-enry/v2/data.map.init.6()`; final result `pre-receive hook declined`. Independent subsequent `git ls-remote origin refs/heads/feature/phase10-cleanup refs/heads/test/pre-phase10-ux-acceptance` returned only `5cb903b989742b7a96cb22ddf4c0e24993b18980` for the handoff branch. No Phase 10 branch was published. No infrastructure repair, hook bypass or force push was attempted. +- The documentation-only commit containing this publication receipt is also local; resolve its exact SHA with `git rev-parse HEAD`. It changes no product source. Do not describe either local checkpoint as remotely verified. + +After the Git-server operator resolves the hook fault independently, normal publication and exact remote readback remain required. Do not retry indefinitely or repair the server in this task. Owner approval of CLEAN-20 can be recorded while publication is blocked, but implementation must wait until both gates are satisfied. Assessment content completion is not published checkpoint acceptance. ## Resume without repeating the assessment diff --git a/docs/redesign/phase-10/P10-00.md b/docs/redesign/phase-10/P10-00.md index d15309e..88d1869 100644 --- a/docs/redesign/phase-10/P10-00.md +++ b/docs/redesign/phase-10/P10-00.md @@ -1,6 +1,6 @@ # P10-00 — Direct assessment and deletion eligibility -2 November 2026, Europe/Paris. **Assessment complete; P10-01 awaits candidate-specific owner approval.** No application/test/dependency/schema change or deletion was performed. One narrowly bounded frontend stylesheet is nominated below; the other assessed areas remain retained. Phase 10 completion and post-redesign product-review acceptance are not established. Production remains NO-GO. +2 November 2026, Europe/Paris. **Assessment content complete locally; checkpoint publication BLOCKED; P10-01 awaits candidate-specific owner approval and publication.** No application/test/dependency/schema change or deletion was performed. One narrowly bounded frontend stylesheet is nominated below; the other assessed areas remain retained. Phase 10 completion and post-redesign product-review acceptance are not established. Production remains NO-GO. ## Authority, baseline and draft review @@ -109,8 +109,9 @@ Retained independent debt: physical device/AT/contrast/proficient EN-NB/printing | Decision | Current result | | --- | --- | | P10-00 direct assessment | **COMPLETE** within the authorised documentation/inspection scope | +| P10-00 checkpoint publication | **BLOCKED**: local `7ba1367fd2e84375b3065eeedf9176a34996f77b` push rejected by Gitea's crashing pre-receive hook; no Phase 10 remote ref on independent readback | | CLEAN-20 static deletion eligibility | **NOMINATED**, with exact implementation verification and owner gate above | -| P10-01 implementation | **BLOCKED pending explicit candidate-specific approval in this chat** | +| P10-01 implementation | **BLOCKED pending explicit candidate-specific approval in this chat and required checkpoint publication** | | Phase 10 complete acceptance | **NO-GO / NOT YET ESTABLISHED**; P10-01–05 not complete | | Redesign development completion | Existing **CONDITIONAL GO** remains scoped; final cleanup acceptance not established | | Post-Phase-10 PRODUCT-REVIEW-01 readiness | **NO-GO** until Phase 10 is accepted and applicable entry conditions are satisfied | diff --git a/docs/roadmap/todo.md b/docs/roadmap/todo.md index 7e8fd3d..80d3592 100644 --- a/docs/roadmap/todo.md +++ b/docs/roadmap/todo.md @@ -1,6 +1,7 @@ ## Direct Phase 10 — 2 November 2026 - [x] P10-00: preserve/review the staged draft, verify baseline/evidence applicability and complete the [direct assessment](../redesign/phase-10/P10-00.md). +- [ ] Publication gate: local assessment `7ba1367` push was rejected by a Gitea pre-receive SIGSEGV. Await operator resolution, then normal push and exact readback; no hook bypass or server repair in this task. - [ ] Owner gate: explicit approval of P10-01/CLEAN-20 only (`job-tracker-ui/src/App.css`), with the assessment's exact verification/rollback boundaries. - [ ] After approval only: implement and qualify that candidate; commit, publish and independently verify the checkpoint. Stop at subsequent candidate/entry gates. - [ ] P10-02–05 and later roadmap: preserve contracts and follow authoritative order from [continuity](../redesign/phase-10/HANDOFF.md). No later implementation is currently authorised.