docs(redesign): plan P5-15 acceptance checkpoints

This commit is contained in:
cesnimda
2026-10-09 08:29:16 +02:00
parent 46a0c0c6d2
commit 932b962b90
11 changed files with 937 additions and 2 deletions
+2
View File
@@ -4,6 +4,8 @@ Status reconciled: 2026-10-09.
## Current repository work
- **P5-15-00 — acceptance planning only:** [final acceptance programme](../redesign/phase-5/p5-15/README.md) reconciles every Phase 5 slice, all 57 original PRES groups and retained routes, incomplete axe/manual/device qualifications, CV/native/revision boundaries and A/B/C/D debt/release gates. No new application/test change or fresh suite result; inherited 1,023 backend / 459 frontend / 117 browser remains. P5-13 deferred, full Phase 5 incomplete and production NO-GO. Push this documentation checkpoint and stop for review; each subsequently completed logical P5-15 checkpoint must be separately committed/pushed. No production `main` push, B07 or automatic 01 execution.
- **P5-14 — scoped responsive CV checkpoint, CONDITIONAL GO:** [implementation/acceptance record](../redesign/phase-5/p5-14/README.md) covers implemented P5-09–12, measured shell clearance, bounded preview chrome/canvas, pane-owned Ctrl+Home/End, nested drag/drop protection, save/conflict recovery and 320–1440px/landscape evidence. Final baseline: **1,023 backend / 459 frontend / 117 actual browser passes**, sidecar 49, real HTTP 2, security/configuration 9/6/1/3; revision 5/5, original fidelity 16/16 with 36 aligned pages and settings exports 8/8 with 24 aligned pages. Production remains NO-GO and no `main` deployment occurred. P5-13 stays deferred/unqualified; incomplete/human/device/zoom/font/production gates remain open. Stop before P5-15/B07; acceptance planning is the next recommendation only.
- **P5-13 — DEFERRED / BLOCKED / NOT QUALIFIED:** [outstanding-work register](../redesign/phase-5/OPEN_BLOCKERS.md#p5-13-deferred-debt-and-return-conditions--2026-10-08) retains 32 frozen cases, 366 required/0 completed model calls, 0 human reviews, unmeasured factuality, unavailable environment/unverified deployed identity and unimplemented AI review UI. Deterministic protections and Production withholding remain; no unrelated Docker recovery retries. The separate [fresh production assessment](../redesign/phase-5/production-release-decision/README.md) identifies automatic deployment from `main` and records **PRODUCTION NO-GO** pending actual ingress/current backup-restore/configuration/rollback evidence. Connor authorizes scoped P5-14 independently of release success; missing AI-review acceptance remains explicit. P5-15 must carry the debt and commit/push every individual change/checkpoint when authorized.