fix(operations): preserve UTC markers in response timestamps
This commit is contained in:
@@ -91,7 +91,7 @@ Follow the approved [Phase 7 handoff](../redesign/phase-6/p6-05/PHASE7_HANDOFF.m
|
||||
- [x] P7-06 [remaining Application forms and global correspondence](../redesign/phase-7/p7-06/README.md): all three mandatoryboundaries implemented CONDITIONAL GO; forms4c325/inboxa791 pushed, compose final hygiene/normal push pending. Compose affected52/5 and fresh backend25 PASS; native10+inbox8+ordinaryP2-D01=19 PASS on LFCrTZzDtX5hNBSRBj5Xx; app/browser TypeScript, lint and build PASS. Actual image review 47/47; all-enabled44scans0violations/330incompletes triaged, human/device/provider qualifications remain. +10front/+0suites,+10browser,+7backend derive739/94,301,1041 only; no integrated full-suite claim. Preserve57/32,RD11/RD21/manual/provider/output/release debt,06Fdeferred/P513withheld/mainunchanged. NextP7-07backend contract first.
|
||||
- [ ] P7-06F optional reviewed followMode composer: retain deferral unless its required action/fallback decision is established.
|
||||
- [ ] P7-07 [owner-scoped Documents index](../redesign/phase-7/p7-07/README.md): implemented local scope CONDITIONAL GO; contract pushed8e4db12. UI final86/8 affected, native8+CV4+ordinaryP2-D01, app/browser types/lint/build PASS;18 actual final image reviews,15 axe scans0violations/101 retained incompletes. Original32 routes retained plus `/documents`; all57 statuses unchanged. Hygiene PASS; normal push blocked by the unreachable configured Git host. MariaDB/human/device/production qualifications remain open. Next P7-08 after checkpoint publication.
|
||||
- [ ] P7-08 existing notifications and operations.
|
||||
- [ ] P7-08 [existing notifications and operations](../redesign/phase-7/p7-08/README.md): UTC transport repair4/4 plus73 consumers PASS; recent-notification candidate49/6 and types/lint/build PASS. Native/visual acceptance and Operations presentation remain; no new producer/route/worker activation. Publication blocked by configured Git host connection failure.
|
||||
- [ ] P7-09 remaining Settings, Connections and data lifecycle presentation.
|
||||
- [ ] P7-10 Users, Audit and System administration presentation.
|
||||
- [ ] P7-11 residual Analytics/error/empty/dialog integration.
|
||||
|
||||
Reference in New Issue
Block a user