@@ -1,5 +1,9 @@
# Direct execution continuation
**Latest implemented/published increment:** `98e9502af5039429fb6da45353e719a27e8aa22d`, codex/a3-ui-04, independently remotely verified; committed source/evidence manifest has zero mismatches. B1 quiet table/board surfaces and persistent right application context implemented; narrow/compact layouts put context after task with jump/return focus. Existing table/board/action/revision owners retained. Fixed reproduced null-nextStep false readiness claim in EN/NB. Final126 selected frontend tests/10 disjoint suites and88 targeted InMemory/SQLite backend tests passed; typecheck/full lint/build passed.16 controlled React search/board/precise-status/detail/context/return journeys,48 whole-page axe scans/captures, zero violations/unexpected writes/page exceptions.16 status PATCHes were intercepted fixture responses, not backend writes. Independent reviewer52 cases overlap126. No native/MariaDB/live provider/model/security/release qualification.
Application-tracking Gate F → A3-IM05 is pending in this chat. Do not start dependent discovery presentation until answered; new international provider implementations retain separate GJ prerequisites/rights. Existing dashboard/nav approvals remain accepted. Review `docs/ui-modernisation/APPLICATIONS_VALIDATION.md` and APPLICATIONS_PUBLICATION.md in integration worktree. UI04 source remains distinct from independent ca519cac document-date patch. Phase10 final acceptance and wider roadmap stay open; these targeted UI counts do not qualify them.
**Newest decision:** owner answered **"Approve dashboard/onboarding and A3-IM04"** on3 November2026. Dashboard Gate F is ACCEPTED; no repeat approval question. Integration worktree now isolates `codex/a3-ui-04` from UI03 receipt `dc93b589c995f4edcc48f658ddde571356d6dd86` (published and independently verified). UI03 remains on its own ref. Next work is B1 applications table/Kanban/full detail with context right; see UI-04.md task ledger. Original integration ref remains d3d33837. No main merge/deployment.
Independent localisation `ca519cacbec6ee8e385927ad31356dacc18b2f2d` on codex/i18n-document-dates is published/remotely verified; committed manifest matches. Reproduced/fixed invalid uploaded wall-clock date rollovers, overflow and trailing junk;40 frontend tests/3 suites, typecheck, scoped lint/build pass. Four historical direct catalogue accesses contextually reviewed; full current literal/backend inventory still open. Not combined with A3 yet; preserve branch separation and integrate only its small accepted patch with combined regression when needed.
+6 -2
View File
@@ -1,5 +1,9 @@
# P10-05 — Acceptance reconciliation (OPEN)
3 November2026 reconciliation: parsed all four retained backend TRX artifacts and the frontend native JSON. **103 distinct historical backend cases**, zero case overlap/failure/skip; **92 historical frontend tests/5 suites** passed. [Machine reconciliation](p10-04-evidence/EVIDENCE_RECONCILIATION.json) retains uncompressed artifact hashes and counters. This is fresh evidence inspection, not fresh test execution. Application source under job-tracker-ui/src, JobTrackerApi and tools has no diff from the published cleanup checkpoint78f7396a to this branch's current documentation checkpoints.
Final A3 design/implementation approval is now received; dashboard and navigation milestone reviews are also accepted. A3 application-tracking implementation98e9502a is published separately and awaits its own Gate F. None of those UI branches, independent localisation fixes, or their selected test counts is integrated into this frozen cleanup branch or substituted for complete Phase10 qualification. Independent audit/preservation closure and the required environment/human qualifications remain open.
2 November 2026. This is an acceptance work register, not final acceptance. P10-01 CLEAN-20 is the only implemented deletion. P10-02/03 retain reviews found no additional proven-safe candidate. No further cleanup is authorised or needed merely to populate a checkpoint.
## Evidence applicability
@@ -11,7 +15,7 @@ Fresh integrity check at continuation from 2a4acc17: all 263 indexed TEST_EVIDEN
| Cleanup eligibility | CLEAN-20 blob/callers and narrow approval recorded in P10-00/01 | No additional deletion proven |
| Frontend types/lint/build | PASSED fresh for CSS deletion; P10-01 | Full-suite execution is not represented by these checks |
| Focused browser EN/NB/theme/responsive | PASSED five selected cases; P10-01 | Canary is not full browser regression or device acceptance |
| Backend document/data contracts | PASSED 89 selected cases; P10-04 | Not complete backend regression |
| Backend document/data contracts | PASSED 103 distinct selected historical cases, including14 attachment cases; P10-04 and3 November reconciliation | Not complete backend regression; no fresh execution in this reconciliation |
| Frontend document workflows | PASSED 92 selected tests; P10-04 | Not complete frontend regression |
| Routes/capabilities | Existing 34-route and 57-group reconciliation retained | 56 PARTIAL / one DEFERRED is not 57 accepted groups; independent closure review pending |
| Historical CV/document/PDF | Accepted source/fixture-bound evidence retained; affected document contracts freshly checked | No fresh physical/PDF visual metric acceptance; unchanged metrics must not be reopened without affected change |
@@ -23,7 +27,7 @@ Fresh integrity check at continuation from 2a4acc17: all 263 indexed TEST_EVIDEN
- CLEAN-20 implementation: locally validated and published; no further code cleanup proposed.
- Phase 10 completion: OPEN; full acceptance is not established by targeted counts or this report.
- Redesign completion and post-redesign Product Review acceptance: OPEN; new full-application design also requires final owner approval.
- Redesign completion and post-redesign Product Review acceptance: OPEN; final A3 design is approved and staged implementation is underway, with separate milestone and integrated qualification gates.
- Independent product/research/i18n/security offline work: may continue under the owner's direct parallel-work authorisation. Do not claim upstream acceptance or integrated release qualification for isolated branches.
- Production release: NO-GO. No merge or deployment authorised.
@@ -0,0 +1,112 @@
{
"reviewDate": "2026-11-03",
"kind": "historical evidence reconciliation, not fresh tests",
"backendReports": [
{
"file": "attachment-ownership-and-storage.trx.gz",
"uncompressedSha256": "b589ad1139cb200d9de64b863d65e3304cea0230eda55d89476e5f79347fe84a",
"cases": 14,
"counters": {
"total": "14",
"executed": "14",
"passed": "14",
"failed": "0",
"error": "0",
"timeout": "0",
"aborted": "0",
"inconclusive": "0",
"passedButRunAborted": "0",
"notRunnable": "0",
"notExecuted": "0",
"disconnected": "0",
"warning": "0",
"completed": "0",
"inProgress": "0",
"pending": "0"
}
},
{
"file": "document-contracts.trx.gz",
"uncompressedSha256": "692a0fe8016140c3198e76e6b3c1d56f438d80390666bc7f1b2dc06b4ac4ead5",
"cases": 27,
"counters": {
"total": "27",
"executed": "27",
"passed": "27",
"failed": "0",
"error": "0",
"timeout": "0",
"aborted": "0",
"inconclusive": "0",
"passedButRunAborted": "0",
"notRunnable": "0",
"notExecuted": "0",
"disconnected": "0",
"warning": "0",
"completed": "0",
"inProgress": "0",
"pending": "0"
}
},
{
"file": "p10-04-import-compatibility.trx.gz",
"uncompressedSha256": "844cd54ff382bff0d48429336f8588ab010f0c72ea255ca02fe300b1561dc513",
"cases": 36,
"counters": {
"total": "36",
"executed": "36",
"passed": "36",
"failed": "0",
"error": "0",
"timeout": "0",
"aborted": "0",
"inconclusive": "0",
"passedButRunAborted": "0",
"notRunnable": "0",
"notExecuted": "0",
"disconnected": "0",
"warning": "0",
"completed": "0",
"inProgress": "0",
"pending": "0"
}
},
{
"file": "p10-04-local-data-compatibility.trx.gz",
"uncompressedSha256": "1ac55913fdc3b705afbed27829fb280bef08d33c62fa26faa2c04e23c0c95908",
"cases": 26,
"counters": {
"total": "26",
"executed": "26",
"passed": "26",
"failed": "0",
"error": "0",
"timeout": "0",
"aborted": "0",
"inconclusive": "0",
"passedButRunAborted": "0",
"notRunnable": "0",
"notExecuted": "0",
"disconnected": "0",
"warning": "0",
"completed": "0",
"inProgress": "0",
"pending": "0"
}
}
],
"backendDistinctCases": 103,
"overlaps": [],
"frontend": {
"numTotalTests": 92,
"numPassedTests": 92,
"numFailedTests": 0,
"numPendingTests": 0,
"numTotalTestSuites": 5
},
"notIntegrated": [
"A3-IM03",
"A3-IM04",
"ca519cac document-date fix"
]
}