@@ -639,3 +639,13 @@
- **Consequences:** pointer and keyboard users receive the same server-confirmed behavior and announcements; custom `Other` remains visibly invalid. The existing exact-stage menu stays available and now has an accessible name.
- **User approval required:** No; this is approved local UX/accessibility work with mocked browser APIs.
- **Reversible:** Revert `fb6f17e` and `4e5ce0c`; no schema/data change is involved.
## DEC-065 — Reuse the workspace as a route-backed list overlay
- **Date:** 2026-08-10
- **Decision:** Keep `/applications/:id` as the full-page fallback, but make a table row's primary Open action render that same workspace in a MUI dialog at `/jobs?workspace={id}&section={section}`. Use a pushed history entry for opening, replace only section changes, Back for UI-originated close and query removal for direct-link close.
- **Reason/evidence:** V-158 confirmed that the previous quick-dialog/full-page chain discarded list context and could not deep-link the embedded presentation. The workspace already composes the authoritative domain components; reusing it avoids a second workspace. MUI supplies the requested focus trap/restoration and full-screen mobile presentation.
- **Alternatives considered:** build a second drawer workspace; keep the quick dialog primary; clone workspace sections into `JobTable`; make the full-page route the only URL. These duplicate ownership or leave the Phase 11 navigation defect.
- **Consequences:** list state remains mounted while the overlay is open, direct workspace/section URLs and Back/Forward work, and a full-page link remains. Complete URL-backed filters and unsaved-edit guards are separate required increments before JOBS-002 can leave progress.
- **User approval required:** No; this is approved repository implementation with mocked local data and no production/provider action.
- **Reversible:** Revert the JOBS-002 overlay commit; no schema, dependency or stored-data change is involved.
+2 -2
View File
@@ -3,7 +3,7 @@
Updated: 2026-08-10
- **Overall programme status:** Active. Seven packages are locally verified; twenty-two packages through UX-003 are implemented with automated/runtime evidence but blocked from applicable live/provider/production gates; JOBS-002 is now in progress. Gitea run 609 passes the prior complete pull-request CI; DEP-001 awaits approved merge-to-main and production verification.
- **Current work package:** `JOBS-002` — applications table and embedded workspace (`IN PROGRESS`); Phase 11 route/list/workspace inventory and current-behavior reproduction are next.
- **Current work package:** `JOBS-002` — applications table and embedded workspace (`IN PROGRESS`); route-backed overlay increment passes focused tests/build. URL-backed filters/page and dirty-edit protection are next.
- **Completed work packages:** None are `DONE`; all repository security/AI packages still have applicable browser, provider and/or production gates.
- **Locally verified work:** SEC-001, SEC-002, SEC-003, SEC-005A, CORE-001, PROD-002 and DEP-001 (`VERIFIED LOCALLY`).
- **Implemented, verification incomplete:** SEC-004, SEC-005B, SEC-008, CORE-002, BG-001, OPS-001A/B/C, POL-001/002, AI-001/002/003/004, UX-001/002/003, QA-001, CAREER-001/002, MAIL-001 and JOBS-001 (`IMPLEMENTED — NOT VERIFIED`). UX-003 safe local/browser scope is implemented; production/native-device gates remain.
@@ -12,7 +12,7 @@ Updated: 2026-08-10
- **Deferred work:** None. Conditional multi-replica coordination, model deletion, realtime operation delivery and unrelated production changes remain outside current packages.
- **Next five work packages:** JOBS-002 applications/workspace; PRODUCT-001 homepage/Pro claims; VER-001 action matrix; production-blocked SEC-006/007 when package-index permission is available; REL-001 after prerequisites.
- **Status counts:** 7 `VERIFIED LOCALLY`; 22 `IMPLEMENTED — NOT VERIFIED`; 1 `IN PROGRESS`; 5 `NOT STARTED`; 5 `BLOCKED`; 0 `DONE`; 0 `DEFERRED`.
- **Test status:** backend 631/631; frontend 50/50 suites and 204/204 tests; Playwright 6/6; npm audit 0 vulnerabilities; production build passes. UX-003 component 7/7 and mocked browser 1/1 pass at 1440/768/375 with dark/light, pointer/keyboard and mobile containment. JOBS-001, DEP-001 and MAIL-001 suites remain as recorded. Historical JT-019 and Jest force-exit/open-handle behavior remain recorded.
- **Test status:** backend 631/631; frontend 51/51 suites and 206/206 tests; JOBS-002 overlay focused 2/2; Playwright 6/6; npm audit 0 vulnerabilities; production build passes. Historical JT-019 and Jest force-exit/open-handle behavior remain recorded.
- **Deployment status:** Gitea pull-request run 609 passed the complete CI job in 4m20s. Deploy was intentionally skipped because the workflow deploys only a `push` to `main`; live remains unchanged. No merge/deployment was performed directly, no production migrations were run and the AI operation worker remains disabled by default.
- **Production status:** Unchanged and unverified. No provider/model call, model pull, external request or paid API occurred.
- **Known regressions:** None found by automated/local browser checks. Jest still needs `--forceExit` and reports its existing open-handle notice. Email-provider/send tests are fake/local only; real delivery is not claimed. Current MAIL browser evidence is 1280×720 only because the browser surface could not resize or perform native Tab traversal. Interrupted attempts are aged after 15 minutes and notified without retry; the five-minute scan is unmeasured on a large ledger. Direct clean EF-only SQLite migration still hits the pre-existing historical blank-chain defect before later migrations; normal startup owns reconciliation. Cross-feature monthly AI usage accounting remains a rollout gap.
+2 -2
View File
@@ -687,9 +687,9 @@ Ordering differences from the suggested list:
- **Required production verification:** existing application/workspace smoke.
- **Status:** `IN PROGRESS`.
- **Blocker:** none after dependencies.
- **Evidence:** source requirement and existing workspace architecture; initial Phase 11 inventory begins at V-158.
- **Evidence:** V-158 execution-path inventory; V-159 first route-backed overlay tests/build; `docs/verification/jobs-002-application-workspace.md`.
- **Commit:** none.
- **Remaining work:** do not place every field in table or duplicate workspace data.
- **Remaining work:** first overlay increment implemented: row Open is route-backed, direct/section URLs and Back/Forward work, MUI owns focus trapping/restoration, mobile is full-screen, and full-page fallback remains. Still required: persist complete list/filter/page state in the URL; guard dirty section edits; improve scan-priority columns/states; browser widths/themes/keyboard/history/error/long-data checks; authorization regression and production smoke. Do not place every field in table or duplicate workspace data.
### UX-003 — Kanban theme-state correction
+7 -7
View File
@@ -2,17 +2,17 @@
Updated: 2026-08-10
- **Exact current task:** JOBS-002 — read Phase 11 and inventory the applications table, route-backed workspace, filters/history/focus/unsaved state and tests before editing.
- **Last completed step:** pushed `4e5ce0c`; UX-003 now has required 1440/768/375 dark/light, browser pointer hover/drag and keyboard evidence after the root implementation `fb6f17e`.
- **Files currently modified:** UX-003 tracking/decision/verification evidence only; application/tests/screenshots are committed.
- **Commands already run:** Phase 10 trace; failing pre-fix computed-color browser reproduction; iterative focused component/build/browser checks; screenshot inspection; full frontend/build and complete Playwright. See V-157.
- **Test results:** backend 631/631 (unchanged); frontend 50 suites and 204/204; Kanban component 7/7; Playwright 6/6 including Kanban 1440/768/375, dark/light, pointer/keyboard; production build passes. Jest retains its known force-exit/open-handle warning.
- **Exact current task:** JOBS-002 — finish and commit the first route-backed embedded-workspace increment, then make filters/page URL-owned without breaking direct workspace URLs.
- **Last completed step:** V-158 traced the confirmed list-context loss; V-159 focused 2/2 and production build pass for the route-backed overlay, direct/section URLs, close/Forward behavior, accessible dialog and full-page fallback.
- **Files currently modified:** `JobTable.tsx`, `ApplicationWorkspacePage.tsx`, new `application-workspace-overlay.test.tsx`, JOBS-002 verification/tracking/decision documents.
- **Commands already run:** bounded Phase 11 route/workspace/test trace; focused overlay Jest; production frontend build; diff check. See V-158/V-159.
- **Test results:** backend 631/631 unchanged; frontend 51 suites and 206/206; JOBS-002 overlay focused 2/2; production build passes. Jest retains its known force-exit/open-handle notice.
- **Services currently running:** none on task-owned ports 3000/5202. Playwright stopped its disposable API/Next servers. Pre-existing Docker services were not changed.
- **Temporary files or processes:** no task-owned process is running and the failed disposable migration database was removed. Existing synthetic browser evidence/account and startup-created local backup remain documented. No provider account, real email, private content, paid service or production service was accessed.
- **Production changes currently active:** none. No deployment, migration, provider connection/sync/send or production payload occurred.
- **Rollback status:** downgrade `20260810080858_AddEmailDraftClientRequestId`, then `20260810075206_AddEmailDrafts`, before reverting draft commits; then follow the existing MAIL rollback order (`ee5ef7e`, `449faeb`, `123fc55`/`e9937ac`, ledger downgrade before `653f011`). No production migration/deploy/provider grant occurred.
- **Uncommitted changes:** UX-003 closure/JOBS-002 transition tracking, decision, V-157 and verification document only; commit and push before JOBS-002 implementation.
- **Uncommitted changes:** first JOBS-002 route-backed overlay implementation, focused tests and tracking; no dependency/schema/config change.
- **Known failures:** live deployment is not verified because PR deploy is intentionally skipped and the active branch is not approved for merge. Draft export/API/UI, full thread/category actions and non-Gmail review remain; existing accounts need re-consent and IMAP stays read-only. A clean full-chain SQLite apply fails in the pre-existing JT-019 migration before the new draft migration. Browser/provider/MariaDB/production unavailable or unverified; recovery scan performance is unmeasured at large ledger scale; Jest open handles; SEC-006 parser dependency work is still separately gated; parser isolation remains SEC-007.
- **Exact next action:** read `docs/todo/work.md` Phase 11 and inspect `JobTable`, `/jobs` routing, `ApplicationWorkspacePage`, filter persistence/deep links and existing tests; reproduce list-context loss and direct-route behavior before choosing the first increment.
- **Exact next action:** review/stage/commit/push the overlay increment, then implement URL-backed search/status/company/location/follow-up/readiness/sort/page state with Back/Forward tests.
- **Work that can continue independently:** JOBS-002, PRODUCT-001 and VER-001. UX/JOBS production, MAIL provider mutations, SEC-006/007 and PROD packages retain their recorded external gates.
- **Decisions still required from the user:** none for synthetic/code-inspected repository work. Any provider connection or send test, internet/package upgrades, private data, external/paid providers and production actions retain explicit approval/safety gates; SEC-009 retention/legal policy remains unresolved.