feat(jobs): embed route-backed workspace
CI and Deploy / test (pull_request) Successful in 4m34s
CI and Deploy / deploy (pull_request) Has been skipped

This commit is contained in:
cesnimda
2026-08-10 11:28:01 +02:00
parent a54b70960c
commit b67a531af4
9 changed files with 303 additions and 19 deletions
+2 -2
View File
@@ -687,9 +687,9 @@ Ordering differences from the suggested list:
- **Required production verification:** existing application/workspace smoke.
- **Status:** `IN PROGRESS`.
- **Blocker:** none after dependencies.
- **Evidence:** source requirement and existing workspace architecture; initial Phase 11 inventory begins at V-158.
- **Evidence:** V-158 execution-path inventory; V-159 first route-backed overlay tests/build; `docs/verification/jobs-002-application-workspace.md`.
- **Commit:** none.
- **Remaining work:** do not place every field in table or duplicate workspace data.
- **Remaining work:** first overlay increment implemented: row Open is route-backed, direct/section URLs and Back/Forward work, MUI owns focus trapping/restoration, mobile is full-screen, and full-page fallback remains. Still required: persist complete list/filter/page state in the URL; guard dirty section edits; improve scan-priority columns/states; browser widths/themes/keyboard/history/error/long-data checks; authorization regression and production smoke. Do not place every field in table or duplicate workspace data.
### UX-003 — Kanban theme-state correction