test(phase10): preserve 92 frontend document workflow results
This commit is contained in:
@@ -1,5 +1,9 @@
|
||||
# Direct execution continuation
|
||||
|
||||
Latest continuation: P10-04 selected regression has 89 backend cases and 92 frontend tests passing, zero failures/skips/pending. Native evidence is archived under docs/redesign/phase-10/p10-04-evidence; P10-04.md records exact filters, source boundaries and remaining qualification. Backend checkpoint `525b5fe4d74ab75f711651fe3a36b988b07abc4d` was independently remotely verified. I18N finite-map review was published/read back at `f577565f7146c6e0cba6edd00b4e804b032ad670`: 112 dynamic calls resolved / 76 pending. It verified 15 letter/completeness keys in both catalogues; checklist default review verified all 14 current defaults but retained the legacy unknown-key gap. No additional cleanup or production change.
|
||||
|
||||
Next: continue independent audit, remaining i18n owner maps/literals, and P10-05 evidence reconciliation. Keep final design/implementation approval, market/language decisions, provider/licensing access, live recovery, hosted CI and human/device gates open; ordinary local work need not wait for these unrelated gates. No user input is required for the next static review package.
|
||||
|
||||
Latest cross-workstream receipt (2 November 2026): I18N attachment preview fix published and independently read back at `4939585fb1272de69f4b1776f6a8f08af639762a`; supplemental checklist category review at `1559697eda967b8c767ac6595ba934877df89fcd` on `codex/i18n-accessible-labels`. Thirteen focused attachment/file-picker tests passed, typecheck passed, scoped lint passed. Graph update completed locally (18,548 nodes / 45,998 edges); generated graph remains untracked. See the I18N worktree's docs/i18n/ATTACHMENT_PREVIEW_LABEL.md and CHECKLIST_DYNAMIC_REVIEW.md. Dynamic review now 109 resolved / 79 pending, supplementing the historical inventory. Phase 10 latest published retain-review checkpoint is `927f909b0d65a24d617f0bac20d4c1fd7693f072`. These receipts supersede older pending statements below.
|
||||
|
||||
Next independently executable work: inspect checklist backend/default and legacy system-key coverage, continue the remaining dynamic/literal reviews, and progress P10-04/05 qualification. Four checklist template calls remain open pending compatibility analysis. Product design still awaits final comprehensive design approval before full production overhaul. No live provider/model/production qualification or complete security audit is claimed.
|
||||
|
||||
Reference in New Issue
Block a user