fix(operations): preserve task state and accessible recovery
This commit is contained in:
@@ -220,3 +220,12 @@ P7-07 implemented scope is **CONDITIONAL GO and published**. UTC transport repai
|
||||
### P7-08 recent notifications — final bounded observation
|
||||
|
||||
[Recent report](p7-08/RECENT.md) and [portable results](p7-08/evidence/recent-results.json):49/6 affected frontend, four type/lint/build gates, native6+Documents8+CV4+ordinaryP2-D01=19/19 PASS on lIzSurm9WwMhPbE11MvC9. All21 finite inputs held; unchanged API/test DLLs. All16 final notification PNGs actually reviewed;14 all-enabled scans0 violations/102 contextually triaged incompletes. Meaningful REDs/failed external-font guard attempt retained; known font CSS remains aborted. +18frontend/0suites derives773/95; +6browser derives318; separate UTC Fact derives1054backend. Last whole573/89,1033,sidecar49 remain inherited. Implemented first presentation CONDITIONAL GO pending final staged hygiene/normal push; Operations second boundary remains. All57groups56PARTIAL/C11DEFERRED,33routes, P513withheld/followModedeferred/mainunchanged/productionNO-GO/Phase8notstarted.
|
||||
|
||||
|
||||
Recent-notification presentation committed and normally pushed **40cfe04df51654c5ab9a073c13c8d67e0d90dcae**; direct refs verified **2026-10-16T21:15:02.899052UTC**, clean HEAD=origin=live development and local/origin/live main27657f3 unchanged. First presentation boundary remains implemented **CONDITIONAL GO**; Operations is the next independent boundary. Earlier pending-push statements are chronological observations superseded by this receipt. No production or Phase8 action.
|
||||
|
||||
### P7-08 Operations — final bounded gate
|
||||
|
||||
[Operations report](p7-08/OPERATIONS.md) and [portable results](p7-08/evidence/operations-results.json) record fresh **77/7 frontend cases**, app/browser TypeScript, lint and build PASS on **YBJ6UzKUv_ZeDjZzgO3Gh**. Actual Operations5 + Notifications6 + ordinaryP2-D01 = **12/12 native PASS**; no skip/flaky/retry. All25 finite inputs held through2026-10-17T01:59:10.798235UTC; API/testDLLunchanged. All14 Operations PNGs plus one frozen-package PNG actually reviewed (15/31 final retained images); notification16 remain retained with their earlier review distinguished. Operations12 all-enabled axe scans0violations/3incompletes and notification14scans0/102 are contextually triaged, without human/device/zoom/font acceptance. Peer fixes remove the task UUID from its accessible name and restore focus only when an accepted poll removes the focused control. All ordinary REDs, candidate evidence and the test-only typing failure remain retained.
|
||||
|
||||
Eighteen new Operations cases derive **791/95 frontend**; five browser cases derive **323**. Backend stays **1054**, with last whole frontend573/89, backend1033 and sidecar49 inherited untilP7-12. BothP7-08 presentation boundaries are implemented **CONDITIONAL GO**, with Operations final staged hygiene/normal push pending. Recent40cfe04 is already pushed and directly verified. All57groups56PARTIAL/C11DEFERRED and33routes remain; F20/RD11/RD12/RD13/RD21/manual/provider/output/release debt stays. P513withheld/followModedeferred/mainunchanged/productionNO-GO/Phase8notstarted. P7-09 preferences/Connections then data/privacy/plan/backup follows the approved order.
|
||||
|
||||
Reference in New Issue
Block a user