docs(roadmap): queue concrete Phase 10 milestone decision

This commit is contained in:
cesnimda
2026-11-11 07:54:41 +01:00
parent 59fd674f4b
commit cbcac1bfaa
4 changed files with 11 additions and 4 deletions
+1
View File
@@ -2,6 +2,7 @@
## 11 November integrated checkpoint ## 11 November integrated checkpoint
- Phase 10 final review package published and remotely read back at `59fd674f4bb1d60939125430fa1d773af7288fcb`. Independent review passed the proposal and all 57 group dispositions against the unchanged canonical register. Candidate qualification is complete; final bounded CONDITIONAL GO remains owner decision D02. Product Review handoff is prepared, with target-baseline reconciliation and the later A3 final gate retained. No unchanged large suite was rerun.
- Release branch advanced and was remotely read back at `3cca441874abfab6ad581c5a07913a6d66622423`. RR-14 scopes the July first-production runbook to its original baseline and links current migration/write/recovery qualification. Current `AddJobRevision` and `AddUserOperationEvents` Up methods change schema, so the historical no-op rationale is not current compatibility evidence. Documentation-only follow-up to `55431b5a`. - Release branch advanced and was remotely read back at `3cca441874abfab6ad581c5a07913a6d66622423`. RR-14 scopes the July first-production runbook to its original baseline and links current migration/write/recovery qualification. Current `AddJobRevision` and `AddUserOperationEvents` Up methods change schema, so the historical no-op rationale is not current compatibility evidence. Documentation-only follow-up to `55431b5a`.
- The isolated drawer worktree has an extra local docs-only commit `52c47702` from a resumed agent after root had preserved/published `5e431421`. It duplicates a report/logs and is deliberately unintegrated/unpublished. The accepted drawer source and integrated evidence are already recorded above. Preserve that local worktree; resume from the A3 integration checkpoint. - The isolated drawer worktree has an extra local docs-only commit `52c47702` from a resumed agent after root had preserved/published `5e431421`. It duplicates a report/logs and is deliberately unintegrated/unpublished. The accepted drawer source and integrated evidence are already recorded above. Preserve that local worktree; resume from the A3 integration checkpoint.
- Latest A3 published/ref-readback checkpoint is `ec57a24d77854bb416c9ea02b8b371be3e5554c0`. Verifier `07df0c68` restores the older search/tracking/saved-search modes for the drawer. Sixteen saved-search configurations passed 48 scans/captures and 80 intercepted fixture mutations. Search and tracking pilots passed separately at 320/1440 px. This covers synthetic saved workflows, with the larger server-backed phase7/saved-search-repair suites still open. The updated evidence seal passed 1,878 checks. No application source changed after the 67-test/build qualification below. - Latest A3 published/ref-readback checkpoint is `ec57a24d77854bb416c9ea02b8b371be3e5554c0`. Verifier `07df0c68` restores the older search/tracking/saved-search modes for the drawer. Sixteen saved-search configurations passed 48 scans/captures and 80 intercepted fixture mutations. Search and tracking pilots passed separately at 320/1440 px. This covers synthetic saved workflows, with the larger server-backed phase7/saved-search-repair suites still open. The updated evidence seal passed 1,878 checks. No application source changed after the 67-test/build qualification below.
+6
View File
@@ -10,6 +10,12 @@
The owner selected A3, approved the implementation and approved progression through IM10. Final IM10 visual acceptance is pending a reviewable whole-application package. Read-only 2FA status and audit redaction are published. Factor recovery, private support access and live diagnostics each retain their separate decision. The owner selected A3, approved the implementation and approved progression through IM10. Final IM10 visual acceptance is pending a reviewable whole-application package. Read-only 2FA status and audit redaction are published. Factor recovery, private support access and live diagnostics each retain their separate decision.
## D02 — Phase 10 final bounded milestone
**READY FOR OWNER REVIEW.** Proposal published at `59fd674f4bb1d60939125430fa1d773af7288fcb` on `feature/phase10-cleanup`, with exact remote readback. Review [the acceptance proposal](../redesign/phase-10/ACCEPTANCE_PROPOSAL.md), [57-group disposition](../redesign/phase-10/PRESERVATION_DISPOSITION.json) and [Product Review handoff](../redesign/phase-10/PRODUCT_REVIEW_HANDOFF.md). Independent source review found the candidate requirements satisfied with applicable historical reuse. No additional executable check is established solely for the unserved stylesheet removal.
Recommended decision is CONDITIONAL GO for Phase 10 and the frozen pre-A3 development baseline, conditional Product Review readiness after milestone acceptance and target-baseline reconciliation, and production NO-GO. Retain 56 PARTIAL/C11 DEFERRED, all 34 routes and every inherited human/environment/security/release qualification. Final A3 Gate F is separate. CLEAN-20 implementation approval does not supply this final milestone decision. Continue eligible independent work while this decision is queued.
## Later decisions — not requested prematurely ## Later decisions — not requested prematurely
The owner's full-roadmap addendum authorises ordinary development wherever prerequisites are satisfied, including bounded EN/NB maintenance and approved A3 work. Product-ranked scope, Global Jobs entry and provider licences, additional-locale publication and human language release, homepage design selection, security target/environment and material-risk disposition, and final release approval retain their concrete review gates. Group remaining owner decisions when independent work is exhausted. The owner's full-roadmap addendum authorises ordinary development wherever prerequisites are satisfied, including bounded EN/NB maintenance and approved A3 work. Product-ranked scope, Global Jobs entry and provider licences, additional-locale publication and human language release, homepage design selection, security target/environment and material-risk disposition, and final release approval retain their concrete review gates. Group remaining owner decisions when independent work is exhausted.
+2 -2
View File
@@ -8,8 +8,8 @@ Updated 11 November 2026. This register records direct-chat work. See [the conti
| P10-01 / CLEAN-20 | VALIDATED AND PUBLISHED | Owner approved only the unused `App.css` removal. Source and receipt at `78f7396a`. See [P10-01](../redesign/phase-10/P10-01.md) | | P10-01 / CLEAN-20 | VALIDATED AND PUBLISHED | Owner approved only the unused `App.css` removal. Source and receipt at `78f7396a`. See [P10-01](../redesign/phase-10/P10-01.md) |
| P10-02 CV/documents | REVIEWED, RETAIN | Historical document and import compatibility kept. See [P10-02](../redesign/phase-10/P10-02.md) | | P10-02 CV/documents | REVIEWED, RETAIN | Historical document and import compatibility kept. See [P10-02](../redesign/phase-10/P10-02.md) |
| P10-03 backend/dependencies/config | REVIEWED, RETAIN | No additional proven-safe removal. See [P10-03](../redesign/phase-10/P10-03.md) | | P10-03 backend/dependencies/config | REVIEWED, RETAIN | No additional proven-safe removal. See [P10-03](../redesign/phase-10/P10-03.md) |
| P10-04 functional/data verification | PARTIAL | 103 distinct historical backend cases and 92 frontend tests reconciled. Environment and recovery limits in [P10-04](../redesign/phase-10/P10-04.md) | | P10-04 candidate functional/data verification | QUALIFIED WITH INHERITED LIMITS | Candidate checks and full local 1,448 backend/1,031 frontend receipts reconciled. Applicable historical source/environment evidence retained. Existing operational and human gates carry forward |
| P10-05 full acceptance | OPEN | Full local backend passed 1,448 tests. Full frontend passed 1,031 tests across 112 suites. Independent audit and preservation closure remain open. See [P10-05](../redesign/phase-10/P10-05.md) | | P10-05 full acceptance | READY FOR OWNER REVIEW | Reviewed Conditional GO proposal, all57 preservation dispositions and Product Review handoff published at `59fd674f`. D02 final milestone decision pending. See [proposal](../redesign/phase-10/ACCEPTANCE_PROPOSAL.md) |
| PRODUCT-REVIEW-01 | FINAL REVIEW BLOCKED | Final audit requires accepted Phase 10. Approved A3 work advances separately under the owner's direct authorisation | | PRODUCT-REVIEW-01 | FINAL REVIEW BLOCKED | Final audit requires accepted Phase 10. Approved A3 work advances separately under the owner's direct authorisation |
| A3 UI/UX modernisation | IM10 IN PROGRESS | Published through `1d733675`. Latest 67 selected frontend tests, four application server journeys, one discovery server journey and 36 drawer configurations/108 scans passed. Broader mobile saved-search qualification, outstanding route states and final Gate F remain open | | A3 UI/UX modernisation | IM10 IN PROGRESS | Published through `1d733675`. Latest 67 selected frontend tests, four application server journeys, one discovery server journey and 36 drawer configurations/108 scans passed. Broader mobile saved-search qualification, outstanding route states and final Gate F remain open |
| INT-GLOBAL-JOBS-01 / GJ-00 | CONDITIONAL | Existing planning at `0ec9f98e6ed4a646fc5e017d8eb6fade07653f37`; exact remote reverified 2 November. No implementation authorised | | INT-GLOBAL-JOBS-01 / GJ-00 | CONDITIONAL | Existing planning at `0ec9f98e6ed4a646fc5e017d8eb6fade07653f37`; exact remote reverified 2 November. No implementation authorised |
+2 -2
View File
@@ -7,8 +7,8 @@ Updated 11 November 2026. This is the cross-phase work list. The source prompts,
- [x] **P10-00** Audit legacy UI, routes, CV/document paths, services, configuration and dependencies. Nominate only proven obsolete code. - [x] **P10-00** Audit legacy UI, routes, CV/document paths, services, configuration and dependencies. Nominate only proven obsolete code.
- [x] **P10-01** Remove the approved unimported `App.css` under CLEAN-20 and publish its targeted verification. Any additional removal needs its own evidence and approval. - [x] **P10-01** Remove the approved unimported `App.css` under CLEAN-20 and publish its targeted verification. Any additional removal needs its own evidence and approval.
- [x] **P10-02/03** Review compatibility and backend/configuration retention. Keep legacy/frozen documents, import/export, renderers, old links, migrations and SQLite where still required. - [x] **P10-02/03** Review compatibility and backend/configuration retention. Keep legacy/frozen documents, import/export, renderers, old links, migrations and SQLite where still required.
- [ ] **P10-04** Finish applicable data and document integrity, historical CV/letter revision compatibility, MariaDB and migration/recovery evidence. **Partial**. Keep SQLite retirement separate. - [x] **P10-04 candidate verification**. Scoped data/document compatibility, source equivalence and applicable historical provider/sidecar/PDF evidence reconciled. Full local 1,448 backend and 1,031 frontend cases retained. Existing human/environment/recovery/security qualifications carry forward; SQLite retirement remains separate.
- [ ] **P10-05** Independent source/evidence review matched 34 routes, 57 preservation groups, and native receipts for 1,448 backend and 1,031 frontend cases. Provider/sidecar/approved PDF historical applicability review is complete for unchanged CLEAN-20 inputs. Finish browser/preservation closure, human/device, current recovery, hosted and integrated security qualification. - [ ] **P10-05 final milestone decision**. The independently reviewed Conditional GO proposal, 57-group disposition and Product Review handoff are published at `59fd674f`. Candidate obligations are satisfied; owner decision D02 remains pending. Preserve 56 PARTIAL/C11 DEFERRED and all 34 routes. Inherited production/human/environment qualifications retain their own gates.
- [ ] Record Phase 10, redesign development and Product Review readiness decisions with the post-redesign handoff. Track production separately. See [P10-05](../redesign/phase-10/P10-05.md). - [ ] Record Phase 10, redesign development and Product Review readiness decisions with the post-redesign handoff. Track production separately. See [P10-05](../redesign/phase-10/P10-05.md).
## PRODUCT-REVIEW-01 · Independent product review ## PRODUCT-REVIEW-01 · Independent product review