docs(redesign): record Analytics authentication repair acceptance
This commit is contained in:
@@ -4,6 +4,8 @@ Status reconciled: 2026-10-09.
|
||||
|
||||
## Current repository work
|
||||
|
||||
- **P5-15-01R-03 — GO for bounded Analytics authentication return repair:** [record](../redesign/phase-5/p5-15/p5-15-01/analytics-auth-repair/README.md). Original AUTH-01 is RED→GREEN; safe complete pathname/query/hash/context, local retry/history/expiry/logout and native foreign404/tampered-target journeys pass. Fresh backend1,033/frontend490(+18)/browser134(+5cases, formerfailure nowpassing)/diagnostics2; saved-search3, Rules4, P2-D01, revision5 and fidelity16/36+settings8/24 remain green. All57 groups reconcile to56PARTIAL/1DEFERRED. Reproducer and code checkpoints are pushed; final evidence receives its own immediate push. Production NO-GO/main unchanged. Stop before P5-15-02/P5-13/Docker/B07/deployment; human/provider/device, production readiness, existing debt and the CV intermittent observation remain open.
|
||||
|
||||
- **P5-15-01R-02 — GO for bounded Rules draft repair:** [record](../redesign/phase-5/p5-15/p5-15-01/rules-draft-repair/README.md). Native RED→GREEN retains5 on tab return/persisted14/zero writes; Save/reload, validation/error/retry, Discard and account isolation pass. Fresh backend1,033/frontend472/browser128pass+1Analytics failure/diagnostics2pass; standard/settings fidelity16/8 and revision5 unchanged. All57 groups reconcile to55PARTIAL/1FAIL/1DEFERRED. Code checkpoints pushed; final evidence follows its immediate commit/push boundary. Analytics remains unrepaired; P5-15-02/P5-13/Docker/B07/production are not started or cleared.
|
||||
|
||||
- **P5-15-00 — acceptance planning only:** [final acceptance programme](../redesign/phase-5/p5-15/README.md) reconciles every Phase 5 slice, all 57 original PRES groups and retained routes, incomplete axe/manual/device qualifications, CV/native/revision boundaries and A/B/C/D debt/release gates. No new application/test change or fresh suite result; inherited 1,023 backend / 459 frontend / 117 browser remains. P5-13 deferred, full Phase 5 incomplete and production NO-GO. Push this documentation checkpoint and stop for review; each subsequently completed logical P5-15 checkpoint must be separately committed/pushed. No production `main` push, B07 or automatic 01 execution.
|
||||
|
||||
Reference in New Issue
Block a user