docs(roadmap): add performance baseline and parallel checkpoints
This commit is contained in:
@@ -17,10 +17,11 @@ Updated 10 November 2026. This register records direct-chat work. See [the conti
|
||||
| I18N-01 / I18N-00 audit | PARTIAL | All 188 historical dynamic call reviews accounted for in published `4172c23d`. Full visible-text, native, market and European coverage remain open |
|
||||
| I18N-01–08 implementation/acceptance | PARTIAL | Bounded EN/NB improvements tested and published. Later stage prerequisites, native review and additional locale publication remain separate |
|
||||
| LAUNCH-SITE-01 / LAUNCH-00 audit | PARTIAL | Design-neutral contracts at `af8c48ce` and rendered baseline reconciliation at `98483b80`. Design research, asset rights and public claims remain open |
|
||||
| LAUNCH-01 four desktop/mobile concepts | PENDING | No viewable concepts produced; eligible independent task after completing audit inputs |
|
||||
| LAUNCH-SITE final design/implementation | AWAITING_APPROVAL | Four concrete concepts must be delivered before owner selection; no final design auto-selection |
|
||||
| LAUNCH-01 four desktop/mobile concepts | PUBLISHED FOR REVIEW | Gallery and eight rendered screenshots at `ccb11494`. 20 controlled browser checks passed |
|
||||
| LAUNCH-SITE final design/implementation | AWAITING_APPROVAL | Owner selection or combination is next. Refine and obtain final design approval before application implementation |
|
||||
| SECURITY-AUDIT-01 | OFFLINE PREFLIGHT PARTIAL | Approved root policy published at `de3d5031`. Formal integrated scan requires a completed application baseline and applicable environment/cost approval |
|
||||
| RELEASE-READINESS-01 / discovery and RR-11 | PARTIAL | Parser fix `f19e7ebf` published with 31 offline tests. RR-12/13 still require isolated rollback, restore and off-host encryption evidence |
|
||||
| RELEASE-READINESS-01 / discovery and RR-11–13 | PARTIAL | Parser fix and offline rollback, off-host copy failure and monthly completion guards published through `24a62997`. Isolated rollback, restore and off-host encryption evidence remain open |
|
||||
| Release stages 2–7 baseline, qualification, remediation, requalification, rehearsal, final acceptance | BLOCKED | Final release candidate/prerequisites not accepted; each stage needs actual applicable environment and source-bound evidence |
|
||||
| PERF-01 / 18 performance areas | IN PROGRESS | Added to the existing roadmap TODO. Measure comparable local baselines first. Replica, CDN, protected dependency and production decisions retain their gates |
|
||||
|
||||
Implemented, tested, accepted, published and production-ready are separate. Production is NO-GO. Historical counts are not fresh executions. See [blockers](BLOCKERS.md), [owner decisions](OWNER_DECISIONS.md), [completed work](WORK_COMPLETED.md) and [next actions](NEXT_ACTIONS.md).
|
||||
|
||||