docs(roadmap): retain current saved workflow checkpoint and next tests

This commit is contained in:
cesnimda
2026-11-11 07:28:32 +01:00
parent 9263bc21f2
commit f7ca1f6948
4 changed files with 4 additions and 3 deletions
+1
View File
@@ -2,6 +2,7 @@
## 11 November integrated checkpoint ## 11 November integrated checkpoint
- Latest A3 published/ref-readback checkpoint is `ec57a24d77854bb416c9ea02b8b371be3e5554c0`. Verifier `07df0c68` restores the older search/tracking/saved-search modes for the drawer. Sixteen saved-search configurations passed 48 scans/captures and 80 intercepted fixture mutations. Search and tracking pilots passed separately at 320/1440 px. This covers synthetic saved workflows, with the larger server-backed phase7/saved-search-repair suites still open. The updated evidence seal passed 1,878 checks. No application source changed after the 67-test/build qualification below.
- Release rollback health package published and independently read back at `55431b5ad080d37a43fea87a7684572af690d716` on `codex/release-rollback-health`, source `a39ac847`, based on `24a62997`. Bounded frontend/health/readiness probes follow previous-image recreation. Six offline handler methods, twelve backup tests, shell syntax and AST graph update passed. Tests inject failed endpoints and failed diagnostics and preserve the original failed exit. Actual image recovery, endpoint routing and post-migration/data recovery remain unqualified. No full deploy/network/container/model execution. - Release rollback health package published and independently read back at `55431b5ad080d37a43fea87a7684572af690d716` on `codex/release-rollback-health`, source `a39ac847`, based on `24a62997`. Bounded frontend/health/readiness probes follow previous-image recreation. Six offline handler methods, twelve backup tests, shell syntax and AST graph update passed. Tests inject failed endpoints and failed diagnostics and preserve the original failed exit. Actual image recovery, endpoint routing and post-migration/data recovery remain unqualified. No full deploy/network/container/model execution.
- A3 published and independently read back at `1d73367576e3dc384c63ae572951147ce7b90a7d` on `codex/a3-ui-10`. Rules freshness integrated at `e286be48`, with 35 affected backend tests passing again. Discovery collation integrated at `ce7e4866`. Mobile filters integrated at `a6ec2255`, with keyboard/verifier source `4f3541e5`. Final 67 selected frontend tests, build, full lint, additional verifier lint/type-check and AST graph update passed. These runs overlap earlier source packages. - A3 published and independently read back at `1d73367576e3dc384c63ae572951147ce7b90a7d` on `codex/a3-ui-10`. Rules freshness integrated at `e286be48`, with 35 affected backend tests passing again. Discovery collation integrated at `ce7e4866`. Mobile filters integrated at `a6ec2255`, with keyboard/verifier source `4f3541e5`. Final 67 selected frontend tests, build, full lint, additional verifier lint/type-check and AST graph update passed. These runs overlap earlier source packages.
- Application density/action follow-up `64603f56` passed all four server-backed EN/NB/theme cases with real disposable SQLite status, workspace, Trash/Restore and retry operations. It fixed the long custom-status phone title and selected dark-link contrast. Forty screenshots and raw failed/final receipts are retained. The later discovery keyboard/import journey passed one isolated server-backed case, with vacancy/preview fixtures. Cancelled dashboard preferences produced a logged HTTP 500 in that separate run. - Application density/action follow-up `64603f56` passed all four server-backed EN/NB/theme cases with real disposable SQLite status, workspace, Trash/Restore and retry operations. It fixed the long custom-status phone title and selected dark-link contrast. Forty screenshots and raw failed/final receipts are retained. The later discovery keyboard/import journey passed one isolated server-backed case, with vacancy/preview fixtures. Cancelled dashboard preferences produced a logged HTTP 500 in that separate run.
+1 -1
View File
@@ -3,7 +3,7 @@
11 November 2026. 11 November 2026.
1. Continue P10-05 qualification on the frozen cleanup branch. CLEAN-20 is published. Reconcile full local regression, source-bound evidence and the 57 preservation groups. Further removal requires its own proven candidate and approval. 1. Continue P10-05 qualification on the frozen cleanup branch. CLEAN-20 is published. Reconcile full local regression, source-bound evidence and the 57 preservation groups. Further removal requires its own proven candidate and approval.
2. Continue approved A3-IM10 from published `1d733675` on `codex/a3-ui-10`. The mobile discovery drawer, rules freshness and discovery locale ordering are integrated. Reconcile older phase7 discovery/saved-search mobile sequences and verifier modes with the drawer, then qualify affected server-backed workflows. Remaining correspondence/Settings/import states and final Gate F stay open. 2. Continue approved A3-IM10 from published `ec57a24d` on `codex/a3-ui-10`. The mobile discovery drawer, rules freshness and discovery locale ordering are integrated. Controlled verifier modes now pass with the drawer. Next reconcile mobile sequences in `e2e/phase7-discovery.spec.ts` and `e2e/saved-search-repair.spec.ts`, retaining real local owner writes and fixture-only provider runs, and execute affected server-backed cases with disposable SQLite. Remaining correspondence/Settings/import states and final Gate F stay open.
3. Continue independently eligible localisation on its isolated branch. The 188 historical dynamic calls are accounted for. Prioritise contextual display coverage and automated locale checks. Native and additional locale publication gates remain open. 3. Continue independently eligible localisation on its isolated branch. The 188 historical dynamic calls are accounted for. Prioritise contextual display coverage and automated locale checks. Native and additional locale publication gates remain open.
4. Four desktop/mobile launch concept pairs are published at `ccb11494`. Retain owner selection before refinement and final approval before implementation. RR-11 and scoped RR-12/13 offline checks/fixes are published through `24a62997`. Actual recovery, integrated security and production remain separately gated. 4. Four desktop/mobile launch concept pairs are published at `ccb11494`. Retain owner selection before refinement and final approval before implementation. RR-11 and scoped RR-12/13 offline checks/fixes are published through `24a62997`. Actual recovery, integrated security and production remain separately gated.
5. Keep Product Review findings provisional until Phase 10 acceptance. Reuse the published GJ-00 pack. GJ-01 awaits the accepted predecessors, implementation scope and provider rights. 5. Keep Product Review findings provisional until Phase 10 acceptance. Reuse the published GJ-00 pack. GJ-01 awaits the accepted predecessors, implementation scope and provider rights.
+1 -1
View File
@@ -12,7 +12,7 @@ The owner selected A3, approved the implementation and approved progression thro
## Later decisions — not requested prematurely ## Later decisions — not requested prematurely
Product-ranked scope, Global Jobs implementation and provider licences, I18N implementation and human language release, homepage design selection, security target/environment and material-risk disposition, and final release approval retain their own concrete review gates. Research does not grant these decisions. Do not ask for generic blanket approval or treat this list as completed sign-off. The owner's full-roadmap addendum authorises ordinary development wherever prerequisites are satisfied, including bounded EN/NB maintenance and approved A3 work. Product-ranked scope, Global Jobs entry and provider licences, additional-locale publication and human language release, homepage design selection, security target/environment and material-risk disposition, and final release approval retain their concrete review gates. Group remaining owner decisions when independent work is exhausted.
| Decision | Options and recommendation | Work held | | Decision | Options and recommendation | Work held |
| --- | --- | --- | | --- | --- | --- |
+1 -1
View File
@@ -27,7 +27,7 @@ Updated 11 November 2026. This is the cross-phase work list. The source prompts,
- [x] Complete five application concepts, A3 selection and design handoff. A1 dashboard, B1 tracking, D1 styling, hybrid mobile navigation, editor-left/preview-right and application context right. - [x] Complete five application concepts, A3 selection and design handoff. A1 dashboard, B1 tracking, D1 styling, hybrid mobile navigation, editor-left/preview-right and application context right.
- [x] **IM01–09 milestone gates**. Foundation/navigation, dashboard/onboarding, applications, discovery presentation, Career Profile/CV/letter, calendar/mail/documents, AI/settings and account/admin have scoped checkpoint evidence and progression approvals. - [x] **IM01–09 milestone gates**. Foundation/navigation, dashboard/onboarding, applications, discovery presentation, Career Profile/CV/letter, calendar/mail/documents, AI/settings and account/admin have scoped checkpoint evidence and progression approvals.
- [ ] **IM10**. Review all 34 routes and 57 preservation groups, secondary routes and connected workflows against A3. Finish open discrepancies, flatter visual hierarchy, density, reusable interactions and loading/empty/error/success states on desktop/tablet/phone, EN/NB and light/dark. Run affected regression and collect real screenshots, keyboard, device, assistive technology and native language review. Obtain final owner visual acceptance. - [ ] **IM10**. Review all 34 routes and 57 preservation groups, secondary routes and connected workflows against A3. Finish open discrepancies, flatter visual hierarchy, density, reusable interactions and loading/empty/error/success states on desktop/tablet/phone, EN/NB and light/dark. Run affected regression and collect real screenshots, keyboard, device, assistive technology and native language review. Obtain final owner visual acceptance.
- [ ] **Discover**. Existing NAV search-first layout and mobile filter drawer shipped through `1d733675`, with 36 controlled configurations/108 scans and one server-backed keyboard/import case. Reconcile broader mobile saved-search tests, then continue results/detail usability. New search skills, radius, tree/map and provider capabilities belong to GJ/EUROPE with qualified data and rights. - [ ] **Discover**. Existing NAV search-first layout and mobile filter drawer shipped through `ec57a24d`, with 36 controlled drawer configurations/108 scans, 16 saved-search configurations/48 scans and one server-backed keyboard/import case. Reconcile broader mobile persistent saved-search tests, then continue results/detail usability. New search skills, radius, tree/map and provider capabilities belong to GJ/EUROPE with qualified data and rights.
- [ ] **Applications**. Title-first rows, explicit selection, preparation wording and compact keyboard row actions shipped through `1d733675`. Four server-backed EN/NB/theme density/action journeys passed after long-status wrapping and selected dark-link contrast fixes. Finish broader table/board/detail workflow and native/visual acceptance, including follow-up. - [ ] **Applications**. Title-first rows, explicit selection, preparation wording and compact keyboard row actions shipped through `1d733675`. Four server-backed EN/NB/theme density/action journeys passed after long-status wrapping and selected dark-link contrast fixes. Finish broader table/board/detail workflow and native/visual acceptance, including follow-up.
- [ ] **Calendar**. Recorded closing dates and follow-ups are covered. Resolve genuine interview scheduling, original precision/timezone and provider/ICS qualification as applicable. Preserve agenda/month toggle and preference. - [ ] **Calendar**. Recorded closing dates and follow-ups are covered. Resolve genuine interview scheduling, original precision/timezone and provider/ICS qualification as applicable. Preserve agenda/month toggle and preference.
- [ ] **Career, CV, letter and documents**. Finish connected overview-to-document reuse and create/import-to-edit/preview/export evidence. Preserve revisions, null-as-inherit, canonical profile ownership, frozen packages, import review and RD21. - [ ] **Career, CV, letter and documents**. Finish connected overview-to-document reuse and create/import-to-edit/preview/export evidence. Preserve revisions, null-as-inherit, canonical profile ownership, frozen packages, import review and RD21.