# P10-ENTRY-FINAL execution plan Authorised baseline26d531cc9079be3be7601f42cb101035de022a4d on test/pre-phase10-ux-acceptance. Scope: diagnose every revised S01 failure, correct verified defects at the shared owner, regenerate actual synthetic visual evidence, verify Windows/Linux and preservation, and prepare a precise protected owner-entry proposal. No Phase10 implementation, autonomous queue, other-worktree mutation, main merge or deployment. - [ ] Freeze baseline and collect signed-direction/raw metric evidence; inspect actual images/PDFs, font resources, DOM geometry and native text matrices. Classify each failing document with a verified cause, not a cosmetic assumption. - [ ] Reproduce confirmed defects with a focused regression; make minimum compatible correction if required. Preserve old goldens and historical rendering. Any incompatible reference/acceptance change stays proposed pending explicit owner approval. - [ ] Run affected Windows/Linux PDF and relevant backend/frontend/browser/preservation checks. Record command exits, source/image/native report identities and separate old/current/overlapping counts. - [ ] Publish a synthetic per-template owner review package, with original/revised, short/long/dense/multipage/diacritics/photo/sidebar and before/after evidence for any fix. Prepare concise actual human actions. - [ ] Reconcile current entry/conditional/production/future blockers; update proposed structured handoff with commit-bound evidence. Keep rejected CV-model qualification blocked and do not activate it. - [ ] Perform final evidence review, schema/negative checks and clean normal feature-branch publication/readback; identify exact candidate and protected decisions. Stop before Phase10. Use the existing PDF/native fixtures and canonical document owners. Avoid a second renderer or relaxed test threshold. A pass in a separate diagnostic never changes the original fidelity gate by itself.