# Phase 5 — Representative screens / major UI redesign plan **Current successor: [P5-00 readiness implementation](p5-00/README.md).** The five bounded shell conditions are implemented and P5-00-D01 is closed with a deterministic test clock and **916/916** backend rerun. P5-01 has an explicit **GO**. No P5-01 visible redesign, B07 or production work has started. F04 remains open. Historical planning checkpoint: source `2a2f9e48052c562ef599825458d0d3a6f9f9fc61`, inspected on 2026-09-13 on `codex/ui-redesign-phase4`. That checkpoint was documentation-only; the successor record above owns implementation/validation status. P4-06 gave a **CONDITIONAL GO for planning**. The original plan required the separate P5-00 gate before P5-01 AppShell/grouped navigation, the first major visible redesign. Use the successor's explicit acceptance conditions; implementation success is not a production release approval. ## Package - [Implementation plan](PHASE5_PLAN.md): 17 bounded checkpoints, dependencies, rollback and stop rules; P5-05 preview deliberately reserved/deferred. - [Readiness gates](READINESS_GATES.md): exact shell, package, revision, rendering, query and release prerequisites. - [Navigation migration](NAVIGATION_MIGRATION.md): every current menu/utility, all 31 existing patterns, staged future destinations and precise shell direction. - [Preservation impact](PRESERVATION_IMPACT.md): all 57 original contracts, current evidence, planned changes/gaps and visual trace IDs. - [Visual acceptance](VISUAL_ACCEPTANCE.md): stable states/viewports/data and manual/automated evidence requirements. - [Open blockers](OPEN_BLOCKERS.md): inherited defects, slice deadlines, separate backend/product/production gates. ## Source reconciliation and findings Read alongside the [original redesign sequence](../IMPLEMENTATION_PLAN.md), [Phase 1 complete inventory](../audit/FUNCTIONALITY_INVENTORY.md), [Phase 2 matrix](../phase-2/PRESERVATION_MATRIX.md) and [trace format](../phase-2/TRACEABILITY.md), [Phase 3 architecture/impact](../phase-3/PRESERVATION_IMPACT_MATRIX.md), [P4-01](../phase-4/p4-01/README.md), [P4-02](../phase-4/p4-02/README.md), [P4-03](../phase-4/p4-03/README.md), [P4-04](../phase-4/p4-04/README.md), [P4-05](../phase-4/p4-05/README.md) and especially [P4-06 acceptance](../phase-4/p4-06/README.md) / [57-row reconciliation](../phase-4/p4-06/PRESERVATION_ACCEPTANCE.md). Historical future-tense status in older packages is not current implementation state. Current source inspection confirms: - App has 31 page/alias patterns, a session-invalidated provider-tree unmount, existing shell groups/collapse and distinct account/Career Profile routes. Preserve React Router and providers; table preferences still participate in router memoization, so characterize rather than assume state lifetime. - Current `JobTable` and `KanbanBoard` do **not** share filter/read scope. Board API accepts deletion inclusion only and returns the full matching board; a page-sized replacement or early alias would lose behavior. Split board presentation from gated integration. - QuickCommandDialog has six commands plus job/company results, not global CV/document search. Notifications already have their own store/actions. Reuse these and repair explicit error/keyboard states, without new producers. - Analytics reports exist inside Dashboard with two load groups and five owner-local visibility flags. `/analytics` is a new **destination** for existing data, not permission to invent metrics. Documents/global aggregate Admin data are not ready; do not add empty navigation targets. - The CV editor already has Template/Content/Customize/AI/History, live preview, overrides, undo/history, mobile panes and extensive controls. Keep them. Server revision enforcement remains absent on Save, and preview injects pagination/cropping into rendered HTML. Those facts justify independent integrity/rendering gates before broad CV changes. - A production quick-preview host is absent. The optional overlay props/test are not proof of an existing launched feature. NEW-10 stays outside the default implementation queue. No contradiction requires a new component library or platform. P4 shared MUI semantics, focus, PageHeader/PageSection and opt-in density remain the foundation. Career Profile/library/complete Documents, Settings/Admin/mail and full Notifications remain Phase 7; advanced dashboard layout remains Phase 8. The current user request/Phase 3 sequencing advances only the bounded existing-report Analytics presentation into Phase 5. ## Validation baseline The following is **inherited executed evidence from P4-06 at the source checkpoint**, not newly executed application tests during this documentation-only task: | Gate | Unchanged baseline | |---|---| | Backend Release tests | 916 passed | | Frontend Jest | 354 passed, 75 suites | | Chromium browser | 51 actual passes + unchanged P2-D01 expected failure (reporter 52 includes the expected failure) | | Rate-limit / ingress / PDF admission | 9 / 6 / 1 passed | | Configuration/Compose | 3 passed | | TypeScript / lint / frontend production build / API Release build | Passing; API zero warnings/errors; P4-06 also checked edited e2e TypeScript | | Secret/whitespace/docs checks | Passing at baseline; fresh documentation checks below | Application/test/CI counts change by **zero** here. No test or CI configuration is edited. Future implementation checkpoints run the exact complete commands recorded in [P4-06 final validation](../phase-4/p4-06/README.md#final-validation), plus new scoped tests and relevant e2e TypeScript. Specialized browser suites own the same disposable API port and run sequentially. Preserve B01–B06 checks; no production evidence follows from them. After a separately accepted P2-D01 repair, report the transition from expected failure to actual successful native archive proof explicitly, without renaming or masking it. P4-06's 118 retained axe scans include eight known rule occurrences and many incomplete checks. Mapping 57 contracts is **not** exhaustive behavior, visual, provider or accessibility coverage. This plan neither changes those results nor treats the incomplete nodes as passes. ## Planning checkpoint verification Fresh local planning checks (2026-09-13): | Executed command / review | Result | |---|---| | `python .artifacts/p5-check-plan.py` | Seven required documents; 57 unique PRES IDs exactly match Phase 2/P4-06; 31 unique current routes exactly match App; 17 planned implementation checkpoints; 184 local link/anchor checks and 127 reference-style test-file targets resolve; table columns/fences pass | | `python .artifacts/p4-04-check-doc-links.py` | 131 current/root Markdown documents, zero missing local targets; historical archive excluded | | Source review of App/AppShell, command/notification/table/board/dashboard/workspace/CV owners and service reads | Reconciled actual route/provider lifetime, absent preview host, distinct board population, existing analytics and CV revision/preview boundaries; no runtime/provider result inferred from source | | `git diff --exit-code 2a2f9e48052c562ef599825458d0d3a6f9f9fc61 -- job-tracker-ui JobTrackerApi JobTrackerApi.Tests scripts .gitea browser-extension` | No application/backend/tests/build/CI/infrastructure changes | | `git diff --cached --name-only` / `git diff --cached --stat` | Eleven Markdown files only: seven package files, three index/trace links and TODO | | `python scripts/supply-chain.py scan-secrets` | Staged documentation secret check passed | | `git diff --check` / `git diff --cached --check` | Passed; ordinary repository LF/CRLF conversion notices are not whitespace failures | The two `.artifacts` validators are ignored local review tools, not new CI/application files. They validate documentation structure/targets, not future implementation behavior. Full application suites were not rerun for prose; their last actual evidence is the unchanged baseline above. Git push is limited to the requested feature branch; remote SHA and clean-tree status are verified and reported with the final commit. No production deployment or external provider check is claimed. ## Recommended next instruction “Implement **P5-00 — Shell readiness gates only** from the documentation checkpoint, following `READINESS_GATES.md` and `PHASE5_PLAN.md`. Reproduce/protect each prerequisite against the current UI, preserve application behavior, run the full baseline, record real visual/accessibility evidence, commit/push the bounded readiness checkpoint, and stop before P5-01.” P5-01 begins the first major visible redesign only after P5-00 acceptance. Native package proof blocks dependent section/relationship migration; revision/rendering proof blocks broad CV; query parity blocks Board unification. Independent screens need not wait for those gates. **F04 remains open** for production verification and does not block local UI planning. A feature-branch commit/push is not permission to deploy.