# Next eligible actions 11 November 2026. 1. Phase 10 candidate qualification and independent final-proposal review are complete. Owner decision D02 covers the concrete Conditional GO package published at `59fd674f`, retaining inherited qualifications. Keep it queued while independent work continues. Further removal requires its own proven candidate and approval. 2. Continue approved A3-IM10 from published1f3bdbcd on codex/a3-ui-10. Correspondence read/manual-note recovery is qualified; next assess manual pasted-email recording, then remaining Settings/import/route and connected-workflow states. Reuse current source-bound evidence, retain the 34 routes/57 groups and final Gate F. Do not repeat accepted native discovery cases solely to resume. 3. Continue independently eligible localisation on its isolated branch. The 188 historical dynamic calls are accounted for. Prioritise contextual display coverage and automated locale checks. Native and additional locale publication gates remain open. 4. Four desktop/mobile launch concept pairs are published at `ccb11494`. Retain owner selection before refinement and final approval before implementation. Release `3cca4418` includes RR-11/13 fixes and RR-12 post-rollback probes, with six offline rollback/twelve backup tests and corrected legacy-runbook scope. Actual recovery, integrated security and production remain separately gated. 5. Keep Product Review findings provisional until Phase 10 acceptance. Reuse the published GJ-00 pack. GJ-01 awaits the accepted predecessors, implementation scope and provider rights. 6. Continue PERF from the source census and comparable baseline. The reproduced PERF-01-RULES fix is integrated and passed 35 affected backend tests. Failed-save qualification now passes nine real-SQLite cases (eight overlap prior35); steady-state MariaDB/load and operational recovery remain open. Carry the page correspondence delta into isolated MariaDB once the local engine is available. Keep the isolated JobTable split out of A3 until a revised strategy protects the throttled Jobs marker. Keep replica, CDN, production, migrations and protected removal gated. Use [the complete roadmap TODO](ROADMAP_TODO.md), [the latest checkpoint](LATEST_CHECKPOINT.md) and branch-specific handoffs to resume. The orchestrator remains paused. Keep pre-p10-ux and unrelated work intact. Publication belongs on the relevant development branch. Edit Job V39 is qualified/published at c172427f; do not repeat its nine paired journeys. Shared MUI defaults are now qualified at 5a92ae3b; null Applied-date preservation at e6240ad3. Continue remaining route/state walkthroughs and eligible localisation checks. Retain Phase 10 D02 and final A3 gates.