# Direct-roadmap continuity 2 November 2026. Worktree: `C:\Users\Connor\.codex\worktrees\p10-assessment\Job tracker`. Branch: `feature/phase10-cleanup`. Initial HEAD: `fc5b9d377199ce51f480a920a3772108094929e3`; reported handoff `5cb903b989742b7a96cb22ddf4c0e24993b18980` is an ancestor and matched its original branch's live remote readback. Frozen application source remains `ba04d817fed26d659bfa2a56b089d6cac851dc34`. ## Completed and current gate - Completed [P10-00](P10-00.md); preserved the existing staged worker draft with a dated review note. Only Markdown changed. - Fresh checks: 263 indexed evidence hashes, 1,280 current frozen source files and 7 verifier-source entries all match; 57 groups retain 56 PARTIAL/C11 DEFERRED; 34 distinct routes match the preserved register. Product suites were NOT RUN. Historical results remain historical. - Sole proposed candidate: **P10-01/CLEAN-20**, delete the unimported original CRA `job-tracker-ui/src/App.css`, blob `74b5e053450a48a6bdb4d71aad648e7af821975c`. Exact callers/data/routes, required checks, rollback and stop conditions are in P10-00. All other assessed compatibility code remains retained. - **Await explicit candidate-specific owner approval in this chat and successful required publication. No implementation is authorised yet.** Do not treat approval of this stylesheet as permission for P10-02 or another initiative. - Assessment checkpoint: **`7ba1367fd2e84375b3065eeedf9176a34996f77b`**, `docs(phase10): complete direct P10-00 assessment`. Four Markdown files, 258 inserted lines including the preserved staged draft. Documentation links, original-draft preservation, candidate hash and no-product-change assertions passed; staged `git diff --check` passed. Working tree was clean after that commit. - **Publication FAILED / advancement BLOCKED.** Normal `rtk proxy git push -u origin feature/phase10-cleanup` exited 1: remote `fatal error: fault`, `SIGSEGV`, `github.com/go-enry/go-enry/v2/data.map.init.6()`; final result `pre-receive hook declined`. Independent subsequent `git ls-remote origin refs/heads/feature/phase10-cleanup refs/heads/test/pre-phase10-ux-acceptance` returned only `5cb903b989742b7a96cb22ddf4c0e24993b18980` for the handoff branch. No Phase 10 branch was published. No infrastructure repair, hook bypass or force push was attempted. - The documentation-only commit containing this publication receipt is also local; resolve its exact SHA with `git rev-parse HEAD`. It changes no product source. Do not describe either local checkpoint as remotely verified. After the Git-server operator resolves the hook fault independently, normal publication and exact remote readback remain required. Do not retry indefinitely or repair the server in this task. Owner approval of CLEAN-20 can be recorded while publication is blocked, but implementation must wait until both gates are satisfied. Assessment content completion is not published checkpoint acceptance. ## Resume without repeating the assessment Read any newer owner reply and this handoff. Inspect current Git state and the candidate/source identity. Reuse the source-bound accepted evidence if unchanged. If CLEAN-20 is approved, perform only its documented patch/verification/publication, updating evidence and this handoff. Do not reinstall/retest unchanged product scope merely to restart this chat. Significant or affected changes require fresh applicable checks. Missing dependencies/graph/build/runtime prerequisites must be reported accurately, without modifying another worktree or inventing results. No autonomous controller commands or state, keys, signatures, approvals, configuration or queue may be used, repaired or changed. It must remain paused. Do not modify `C:\Users\Connor\.codex\worktrees\pre-p10-ux\Job tracker`. No main merge, production deployment, production services, application AI models or deferred CV-import overhaul/personal portfolio work is authorised. ## Authoritative order after Phase 10 acceptance All seven source files exist; their bytes were fingerprinted during P10-00. Only the active Phase 10 source was read as execution requirements here. Before entering each later workstream, read its complete source and every required linked/subordinate prompt, recheck dependencies and obtain its applicable entry decisions. Do not substitute this order table or old orchestrator records for those requirements. | Order | Workstream / source below `E:\Storage\Projects\Active\temp docs\final\` | Source SHA256 observed | | --- | --- | --- | | 1 | PHASE-10: `Prompt 5 — Phase 10.txt` | `f3d5d183a1cd653aac2207a8435ba95fbb74ef4bb8cc91d605edd959f9f4ec72` | | 2 | PRODUCT-REVIEW-01: `Prompt 6 — PRODUCT-REVIEW-01.txt` | `544d11a2d1e9a913397766c7e475f63338f0b735d2bb26dcabdedb6fe9e25a58` | | 3 | INT-GLOBAL-JOBS-01: `done\Prompt 7 — INT-GLOBAL-JOBS-01.txt` | `c67c70862eecf677e1f2944fd0e17799068c054738d520513955fcf6542c52ce` | | 4 | I18N-01: `I18N\00_MASTER_ORCHESTRATOR.md`, including its entire linked prompt pack | `6365901a0521d603f8059de31492bc6353229c684da23b8553df49b4844fd330` | | 5 | LAUNCH-SITE-01: `Prompt 10 - homepage.txt` | `f1d2b143796725e37b9a86643975a716f0be2109687fc772c6e26dae5172eaa0` | | 6 | SECURITY-AUDIT-01: `jobjakt-security\MASTER_PROMPT.md`, including its entire linked prompt pack | `37bec461f84df60b787bda45db3bd9af1a6c836c6c023f3ab6dd7dc4beb2c6db` | | 7 | RELEASE-READINESS-01: `prompt 11 - release readiness.txt` | `12c846d754b170c2e767db05816f4053d9e8c4cf58a2349121b2de91875beaf2` | Phase 10 checkpoints remain P10-00 baseline, P10-01 frontend, P10-02 CV/document compatibility, P10-03 backend/dependencies/config, P10-04 data/functional verification, P10-05 full acceptance. Subsequent scopes require evidence and the applicable candidate gates. If nothing is safely removable, say so; never invent a deletion to complete a checkpoint. Human/device/language/printing, AI semantics, provider licences, hosted CI, security and production decisions remain separate. SQLite retirement stays a separately gated initiative. Production NO-GO does not prohibit an otherwise authorised bounded assessment.