# Direct-roadmap continuity ## Latest checkpoint — CLEAN-20 explicitly approved and verified **Published and independently verified:** `78f7396adb2f1d3452c10e60bc0dbbd3a4a602e4` on `origin/feature/phase10-cleanup`; normal push exit 0 and subsequent ls-remote exact match. Graphify AST update completed locally (18,532 nodes / 46,020 edges); generated graph remains untracked. P10-02 and P10-03 now record bounded compatibility/backend retain dispositions, with no further removal candidate proven. P10-04/05 and independent audit are still incomplete. Owner replied **"Approve CLEAN-20 only"** in this chat. This supersedes historical approval-pending statements below, without authorising any other deletion. [P10-01](P10-01.md) records the exact one-file removal, fresh typecheck/lint/build and 5/5 browser results, preserved 34 routes/57 groups, and 1,279 unchanged source files. Publication receipt follows in the next checkpoint. No final Phase 10 or production acceptance implied. Resume with this latest section, not the superseded controller/publication history below. 2 November 2026. Worktree: `C:\Users\Connor\.codex\worktrees\p10-assessment\Job tracker`. Branch: `feature/phase10-cleanup`. Initial HEAD: `fc5b9d377199ce51f480a920a3772108094929e3`; reported handoff `5cb903b989742b7a96cb22ddf4c0e24993b18980` is an ancestor and matched its original branch's live remote readback. Frozen application source remains `ba04d817fed26d659bfa2a56b089d6cac851dc34`. ## Completed and current gate **Latest authority, 2 November 2026:** the owner's Continuous Progress Addendum explicitly retains precise P10-01 approval as outstanding, superseding the earlier interpretation of “continue” below. P10-01 is AWAITING_APPROVAL. Git publication is now resolved: normal push succeeded and independent remote readback matched `1692142295950e390a4cf807d9df86cc5cf96290`. Earlier failed attempts remain historical. Continue explicitly eligible independent planning under [the direct-roadmap register](../../direct-roadmap/ROADMAP_STATUS.md); do not use the former blanket conclusion that every later planning task is blocked. The I18N-00 source explicitly permits an audit while earlier gates remain blocked. Continuation, 2 November 2026: the owner instructed “continue as far as you can” in response to the specific CLEAN-20 proposal. This is taken as permission to continue that nominated scope, not approval of additional candidates or later initiatives. Implementation still cannot begin across the mandatory publication gate. A normal push of clean local `8cdff28f0781e4c99efd06079149d9933e01cd4e` was retried once and again failed with the same remote SIGSEGV/pre-receive rejection. Independent remote readback again returned only the original handoff branch at `5cb903b`; the Phase 10 ref is absent. No server repair or hook bypass was attempted. The approval-pending statements below describe the preceding checkpoint; this continuation supplies the latest chat instruction, while publication remains BLOCKED. Dependency disposition: P10-01 waits for required publication; P10-02–05 wait for their preceding checkpoints and applicable candidate decisions; PRODUCT-REVIEW-01 waits for accepted Phase 10; Global Jobs, I18N, Launch Site, Security Audit and Release Readiness wait for their ordered predecessors and entry gates. None is an independent next item that can be started by skipping this failure. The remaining external action is operator resolution of the Git-server hook fault, followed by normal push and exact remote verification. Preserve local work and stop at this boundary. - Completed [P10-00](P10-00.md); preserved the existing staged worker draft with a dated review note. Only Markdown changed. - Fresh checks: 263 indexed evidence hashes, 1,280 current frozen source files and 7 verifier-source entries all match; 57 groups retain 56 PARTIAL/C11 DEFERRED; 34 distinct routes match the preserved register. Product suites were NOT RUN. Historical results remain historical. - Sole proposed candidate: **P10-01/CLEAN-20**, delete the unimported original CRA `job-tracker-ui/src/App.css`, blob `74b5e053450a48a6bdb4d71aad648e7af821975c`. Exact callers/data/routes, required checks, rollback and stop conditions are in P10-00. All other assessed compatibility code remains retained. - **Await explicit candidate-specific owner approval in this chat and successful required publication. No implementation is authorised yet.** Do not treat approval of this stylesheet as permission for P10-02 or another initiative. - Assessment checkpoint: **`7ba1367fd2e84375b3065eeedf9176a34996f77b`**, `docs(phase10): complete direct P10-00 assessment`. Four Markdown files, 258 inserted lines including the preserved staged draft. Documentation links, original-draft preservation, candidate hash and no-product-change assertions passed; staged `git diff --check` passed. Working tree was clean after that commit. - **Publication FAILED / advancement BLOCKED.** Normal `rtk proxy git push -u origin feature/phase10-cleanup` exited 1: remote `fatal error: fault`, `SIGSEGV`, `github.com/go-enry/go-enry/v2/data.map.init.6()`; final result `pre-receive hook declined`. Independent subsequent `git ls-remote origin refs/heads/feature/phase10-cleanup refs/heads/test/pre-phase10-ux-acceptance` returned only `5cb903b989742b7a96cb22ddf4c0e24993b18980` for the handoff branch. No Phase 10 branch was published. No infrastructure repair, hook bypass or force push was attempted. - The documentation-only commit containing this publication receipt is also local; resolve its exact SHA with `git rev-parse HEAD`. It changes no product source. Do not describe either local checkpoint as remotely verified. After the Git-server operator resolves the hook fault independently, normal publication and exact remote readback remain required. Do not retry indefinitely or repair the server in this task. Owner approval of CLEAN-20 can be recorded while publication is blocked, but implementation must wait until both gates are satisfied. Assessment content completion is not published checkpoint acceptance. ## Resume without repeating the assessment Read any newer owner reply and this handoff. Inspect current Git state and the candidate/source identity. Reuse the source-bound accepted evidence if unchanged. If CLEAN-20 is approved, perform only its documented patch/verification/publication, updating evidence and this handoff. Do not reinstall/retest unchanged product scope merely to restart this chat. Significant or affected changes require fresh applicable checks. Missing dependencies/graph/build/runtime prerequisites must be reported accurately, without modifying another worktree or inventing results. No autonomous controller commands or state, keys, signatures, approvals, configuration or queue may be used, repaired or changed. It must remain paused. Do not modify `C:\Users\Connor\.codex\worktrees\pre-p10-ux\Job tracker`. No main merge, production deployment, production services, application AI models or deferred CV-import overhaul/personal portfolio work is authorised. ## Authoritative order after Phase 10 acceptance All seven source files exist; their bytes were fingerprinted during P10-00. Only the active Phase 10 source was read as execution requirements here. Before entering each later workstream, read its complete source and every required linked/subordinate prompt, recheck dependencies and obtain its applicable entry decisions. Do not substitute this order table or old orchestrator records for those requirements. | Order | Workstream / source below `E:\Storage\Projects\Active\temp docs\final\` | Source SHA256 observed | | --- | --- | --- | | 1 | PHASE-10: `Prompt 5 — Phase 10.txt` | `f3d5d183a1cd653aac2207a8435ba95fbb74ef4bb8cc91d605edd959f9f4ec72` | | 2 | PRODUCT-REVIEW-01: `Prompt 6 — PRODUCT-REVIEW-01.txt` | `544d11a2d1e9a913397766c7e475f63338f0b735d2bb26dcabdedb6fe9e25a58` | | 3 | INT-GLOBAL-JOBS-01: `done\Prompt 7 — INT-GLOBAL-JOBS-01.txt` | `c67c70862eecf677e1f2944fd0e17799068c054738d520513955fcf6542c52ce` | | 4 | I18N-01: `I18N\00_MASTER_ORCHESTRATOR.md`, including its entire linked prompt pack | `6365901a0521d603f8059de31492bc6353229c684da23b8553df49b4844fd330` | | 5 | LAUNCH-SITE-01: `Prompt 10 - homepage.txt` | `f1d2b143796725e37b9a86643975a716f0be2109687fc772c6e26dae5172eaa0` | | 6 | SECURITY-AUDIT-01: `jobjakt-security\MASTER_PROMPT.md`, including its entire linked prompt pack | `37bec461f84df60b787bda45db3bd9af1a6c836c6c023f3ab6dd7dc4beb2c6db` | | 7 | RELEASE-READINESS-01: `prompt 11 - release readiness.txt` | `12c846d754b170c2e767db05816f4053d9e8c4cf58a2349121b2de91875beaf2` | Phase 10 checkpoints remain P10-00 baseline, P10-01 frontend, P10-02 CV/document compatibility, P10-03 backend/dependencies/config, P10-04 data/functional verification, P10-05 full acceptance. Subsequent scopes require evidence and the applicable candidate gates. If nothing is safely removable, say so; never invent a deletion to complete a checkpoint. Human/device/language/printing, AI semantics, provider licences, hosted CI, security and production decisions remain separate. SQLite retirement stays a separately gated initiative. Production NO-GO does not prohibit an otherwise authorised bounded assessment.