# JobTracker session handoff Updated: 2026-08-15 - **Exact current task:** finish and ship the prioritized admin-only deployed-version indicator, then correct lossless Career manual-field persistence and CV contact contrast before returning to JOBS-002 closure. - **Last completed step:** exposed configured build version/commit metadata through `/api/auth/me` only for administrators and added a compact responsive header badge with accessible version/commit text. - **Files currently modified:** auth bootstrap DTO/controller/test, application shell/App bootstrap/test, and master programme tracking/evidence. - **Commands already run:** focused Auth/System 36/36; focused AppShell 2/2; full backend 640/640; full frontend 53 suites/221 tests; optimized frontend build/TypeScript; diff check. - **Test results:** all listed local gates pass. Jest retains the documented force-exit/open-handle notice; prior CV pathological proof and recorded baselines remain valid. - **Services currently running:** none on task-owned ports 3000/5202. Playwright stopped its disposable API/Next servers. Pre-existing Docker services were not changed. - **Temporary files or processes:** no task-owned process is running and the failed disposable migration database was removed. Existing synthetic browser evidence/account and startup-created local backup remain documented. No provider account, real email, private content, paid service or production service was accessed. - **Production changes currently active:** none. No deployment, migration, provider connection/sync/send or production payload occurred. - **Rollback status:** downgrade `20260810080858_AddEmailDraftClientRequestId`, then `20260810075206_AddEmailDrafts`, before reverting draft commits; then follow the existing MAIL rollback order (`ee5ef7e`, `449faeb`, `123fc55`/`e9937ac`, ledger downgrade before `653f011`). No production migration/deploy/provider grant occurred. - **Uncommitted changes:** V-166 admin version indicator and tracking update; no dependency/schema/config/migration change. - **Known failures:** live deployment is not verified because PR deploy is intentionally skipped and the active branch is not approved for merge. Draft export/API/UI, full thread/category actions and non-Gmail review remain; existing accounts need re-consent and IMAP stays read-only. A clean full-chain SQLite apply fails in the pre-existing JT-019 migration before the new draft migration. Browser/provider/MariaDB/production unavailable or unverified; recovery scan performance is unmeasured at large ledger scale; Jest open handles; SEC-006 parser dependency work is still separately gated; parser isolation remains SEC-007. - **Exact next action:** review, commit and push V-166; then fix the Career manual-value normalization boundary and CV contact contrast with focused regressions. - **Work that can continue independently:** the immediate queue in the master plan: Career lossless persistence, CV contrast, JOBS-002 closure, cross-app contrast/accessibility, PRODUCT-001 and VER-001. UX/JOBS production, MAIL provider mutations, SEC-006/007 and PROD packages retain their recorded external gates. - **Decisions still required from the user:** none for synthetic/code-inspected repository work. Any provider connection or send test, internet/package upgrades, private data, external/paid providers and production actions retain explicit approval/safety gates; SEC-009 retention/legal policy remains unresolved.