# Career/document publication and next owner gate 3 November 2026. Implementation `6f801251b0d44e0dfb18365ba3102a3d4d482313` on `codex/a3-ui-06` was pushed successfully. Independent `git ls-remote --heads origin refs/heads/codex/a3-ui-06` returned that exact commit. Committed source/evidence manifest verification matched all26 sources and151 evidence files with zero mismatches;80 static-export assets are separately hashed. Local qualification:212 unique selected frontend cases/ten suites and103 isolated backend cases passed; types/full lint/build and final verifier lint/diff check passed. Full16-config browser matrix has96 axe scans; six EN/light boundary/focus configs have36 scans, four configs overlap,108 unique validated screenshots (plus one failed diagnostic PNG). All14 edit targets passed visible/unobscured focus at320/390/768/1000/1001/1440. Deliberate saves are intercepted fixtures only. Independent source review57 passing cases overlaps212; independent verifier review reconciled counts and fixture limits. The original A3-IM06 implementation authorisation is satisfied within [CAREER_VALIDATION.md](CAREER_VALIDATION.md)'s scope. Owner then explicitly answered **"Approve Career/CV/letter and A3-IM07"**. Gate F is ACCEPTED; do not ask again. A3-IM07 Calendar/reminders/correspondence/documents is authorised, preserving closing-date provenance/precision/timezones, linked context, ICS/provider consent, attachment previews/downloads and mail conflicts/confirmed-send. Real provider activation remains separate. Earlier UI01–05 approvals remain accepted and must not be repeated. Do not treat this as full Phase10, Product Review, European localisation, Global Jobs provider, import-engine, native-device, physical PDF, final integrated security or release acceptance. No main merge/deployment. Independent `ca519cac` date localisation and `de3d5031` security policy remain isolated; no older workstream source was wholesale merged. The generated graph remains local and untracked. Next independent eligible candidate while the owner reviews: reproduce and localise fixed-decimal attachment size presentation in the existing attachment owners on the separate localisation branch. Follow the existing number-formatting contract, preserve units/thresholds and unknown/zero semantics, test EN/NB, then reconcile that small patch before any A3 integration. Final integration of completed isolated patches requires combined checks.