# Direct roadmap status Updated 2 November 2026. This is documentation, not an executable queue. The Continuous Progress Addendum controls direct-chat work; the autonomous orchestrator remains paused and untouched. | Workstream/checkpoint | Status | Dependency and evidence | | --- | --- | --- | | PHASE-10 / P10-00 assessment | COMPLETED | Report in `../redesign/phase-10/P10-00.md`; assessment `7ba1367`, publication receipts `8cdff28`/`1692142`. Remote exactly `1692142295950e390a4cf807d9df86cc5cf96290` on 2 November | | P10-01 / CLEAN-20 | AWAITING_APPROVAL | Delete only unused `job-tracker-ui/src/App.css`; precise owner decision D01 below. Addendum explicitly withholds implementation | | P10-02 CV/documents | BLOCKED | Preceding cleanup checkpoint and any exact candidate approval; retain historical documents | | P10-03 backend/dependencies/config | BLOCKED | Predecessors; no proven removal currently approved | | P10-04 functional/data verification | BLOCKED | Defined and accepted cleanup scope; fresh affected verification required | | P10-05 full acceptance | BLOCKED | P10-01–04 and complete applicable acceptance programme | | PRODUCT-REVIEW-01 | BLOCKED | Final audit requires accepted Phase 10. Provisional independent research is eligible; not yet performed or substituted for final acceptance | | INT-GLOBAL-JOBS-01 / GJ-00 | CONDITIONAL | Existing planning at `0ec9f98e6ed4a646fc5e017d8eb6fade07653f37`; exact remote reverified 2 November. No implementation authorised | | INT-GLOBAL-JOBS-01 implementation | BLOCKED | Accepted Phase 10/Product Review, initiative approval and provider rights | | I18N-01 / I18N-00 audit | IN_PROGRESS | Partial source-bound audit published at `55adc1dbd742a570d55d3a4d13f5613a7ed2ab25`; 3,119 messages, 60 planned locale candidates; 108 conditional calls resolved, 80 remain. Contextual/legal/library review incomplete | | I18N-01–08 implementation/acceptance | BLOCKED | I18N-00 and stage prerequisites plus documented implementation authority; no locale publication approved | | LAUNCH-SITE-01 / LAUNCH-00 audit | IN_PROGRESS | Source audit and claim boundaries published at `756ab616a22746a9bafa9830afd4f8efbb085794`; rendered audit still pending | | LAUNCH-01 four desktop/mobile concepts | PENDING | No viewable concepts produced; eligible independent task after completing audit inputs | | LAUNCH-SITE final design/implementation | AWAITING_APPROVAL | Four concrete concepts must be delivered before owner selection; no final design auto-selection | | SECURITY-AUDIT-01 / stages 00–16 | BLOCKED | Master begins `DO NOT START THIS NOW!` and requires finished feature development/baseline tests; README's immediate-review wording does not silently override that gate. No formal scan started | | RELEASE-READINESS-01 / Stage 1 discovery | IN_PROGRESS | Preliminary inventory, blocker reconciliation and 18-gate matrix published at `653f8d04d469dcd52c883d4b98bea76b8adacada`; five runner guards and four workflow guards passed in separate checks; recovery review and RR-11 reproduction saved; full discovery incomplete | | Release stages 2–7 baseline, qualification, remediation, requalification, rehearsal, final acceptance | BLOCKED | Final release candidate/prerequisites not accepted; each stage needs actual applicable environment and source-bound evidence | Implemented, tested, accepted, published and production-ready are separate. Production is NO-GO. Historical counts are not fresh executions. See [blockers](BLOCKERS.md), [owner decisions](OWNER_DECISIONS.md), [completed work](WORK_COMPLETED.md) and [next actions](NEXT_ACTIONS.md).