# P7-12 — Integrated migration acceptance ## Continuation — 21 October Latest source continuation is normally pushed development `9b17b04d61513b8e3c909e4da74998d4cadb1e83`, verified05:30:49UTC. The fixture repair `b39a5af4dec0c0e7d471fea5122b41095ff21453` was pushed/verified05:21:31UTC; [protected-action help](ADMIN_HELP.md) `44458f4f3a1ba218a309aa74351b02a04f042d00` was pushed/verified clean05:23:06UTC. Its10component/3native cases and fresh build/types/lint pass; no case is added. A fresh899/101frontend,1057backend and56sidecar run also passes21October; whole browser/separate lanes remain required. The pre-security source snapshot [final-entry.json](evidence/final-entry.json) is **superseded**, not final acceptance. That candidate browser run was interrupted after22passing cases when the fresh registry audit introduced two production-classified high findings in follow-redirects1.16.0. [The bounded1.16.1patch](../../../infrastructure/2026-10-21-follow-redirects-patch.md) changes one lock entry, passes two loopback credential-stripping contracts and returns production audit to0vulnerabilities; full audit policy retains only the approved dev-only high exception plus recorded moderate development findings. Patched build/types/lint pass. Security repair9bb8b1a is pushed; equivalent main5f835e5 is normally pushed/directly verified05:30:46UTC. A fresh patched-source snapshot and complete run follow, with the partial pre-patch log retained. Production observations05:22:25UTC show health/ready/root HTTP200and healthy core containers, but source checkout remains7d641ed and backend version metadata contains literal unevaluated shell expressions. This does not verify the requested release identity. AI still runsqwen2.5:7b; model activation remains pending the live-release priority. CI837's matching Python/.NET native-crash evidence and the earlier production F04/restore/configuration/rollback gates remain open; no production GO is inferred. The first complete successor run failed103/351, with248unexpected failures and zero skips/flaky/retries; it is not accepted. [Fixture investigation](FIXTURE_ISOLATION.md) and [portable evidence](evidence/fixture-repair.json) separate administrative role/language contamination from an unresolved isolated Audit500. The corrected shared-fixture composition passes16/16. Existing409/403/503, ownership, source/save and route assertions remain; no test is removed or relaxed. The final whole run and separate lanes still follow. The earlier18:52:58UTC clean publication of entry evidence `ddb9c3da4ff31447fa6bd579002f32199052937d` remains historical, not final acceptance. Separately, parser native-exit diagnostics `dda16873455259bce23a744bd838c3e3e0fc6ee8` are pushed on development and equivalent main8699ae4 is normally pushed/directly verified21October05:13:39UTC. Release837 remains unqualified: it subsequently failed in native MSBuild/.NET test compilation after the parser process succeeded. No deployment/model activation is claimed. The [parser report](../../../infrastructure/2026-10-21-parser-native-exit.md) preserves the earlier distinct SIGSEGV and diagnostic-only scope. ## Entry and bounded scope All P7-00–P7-11 presentation boundaries are implemented and published, with their original qualifications retained. P7-11 final error-owner commit `584530b694a2238928d10fddfc013499cf9b3fab` was pushed and directly verified clean at 2026-10-20T18:29:28 UTC. The normal main-repair reconciliation merge `8bbaf1f875f6d32dd7d379779a35188dca844fbb` was pushed and verified clean at18:29:38 UTC. These receipts supersede earlier pending-publication observations. [Entry evidence](evidence/entry.json) freezes committed development source `8bbaf1f875f6d32dd7d379779a35188dca844fbb`, 791 tracked runtime input hashes, Release API/test assembly hashes and production export `mz21qlhGdOIyi9HgMoZUc`. Main is separately `f7dc22e5e7efe1fd1d64f6ace2c04cf2f95bf558`; its release is owner-authorized despite the retained production NO-GO. Development acceptance does not establish deployment identity. This checkpoint performs the fresh integrated lanes, reconciles all57 contracts and33 current route patterns, records remaining requirements and prepares the [Phase8 handoff](PHASE8_HANDOFF.md). It introduces no Phase8 functionality and does not qualify or activate P5-13. ## Baseline and current validation The authoritative inherited Phase6/P7-00 baseline is backend1033, frontend521/85suites, ordinary browser159 and offline sidecar49, as recorded in [P7-00](../p7-00/evidence/baseline.json). Later affected vectors and intermediate full runs are chronological evidence, not substitutes for this checkpoint. Final integrated execution is **IN PROGRESS**. Fresh rebuilt Release backend1057/1057 and offline sidecar56/56 pass. App and browser TypeScript, lint, SMTP fixture, secret scan, SBOM generation, supply-chain/ingress configuration helpers, offline evaluation harness and browser-retry guard pass. [Initial completed unit evidence](evidence/completed-unit-gates.json) records frontend898/101 before the repair below; archived artifact paths retain their original byte hashes. Separate native lanes and final source reconciliation follow. No final migration acceptance is claimed here. ## Reproduced failures and committed successor The initial whole-browser run was interrupted after52attempted cases when two ordinary Bokmål cases exposed English-only `Technical` selectors. A focused continuation also exposed the corresponding `Code` selector. Both now use existing locale keys; all4theme/language document-control cases pass, retaining template entitlement, no-write/canonical/sibling checks, settings persistence, restore and native PDF output. No assertion or timeout is weakened. Release833 independently exposed a confirmation tab-cycle race. A deterministic component regression reproduces the opening transition resetting deliberate focus to Cancel (2PASS/1FAIL). Removing that redundant callback retains initial Cancel autofocus, MUI trapping/restoration and the named scroll body. The regression passes3/3; all5affected native modal/Discovery cases pass with no skips/flaky/retries. See the [repair report](../../../infrastructure/2026-10-20-confirm-transition-focus.md). Focus repair `c5cfc8756c8b47c7932bf373d8008b7b7b6541a0` was normally pushed/directly verified18:46:51UTC. Locale-consumer correction `e698ed6c57deaec35b23180df9c43d185f5d9fa4` was pushed/verified18:50:37UTC. Normal main reconciliation `b333ef55d5665223d2f570ec9681336fc3971c8a` was pushed/verified18:50:44UTC. These observations retain the new acceptance documents as untracked; they do not assert a clean entire worktree. No runtime source remained dirty. [Successor identity](evidence/successor-entry.json) records all791inputs, unchanged backend assemblies and export `4Xe6CaQf-Y4jJkD3Tevs5`. Its observation occurred immediately after browser process launch because the first capture command failed shell quoting; this qualification is explicit. Fresh frontend **899/101suites** passes with no pending/failures; the one new case is the deterministic focus regression. Build/app and browser TypeScript/lint pass. The successor whole351-case browser and subsequent separate lanes are running with zero configured retries. Initial interrupted evidence is retained under `.artifacts/phase7/current/ui/attempts/main-185055/`; final collection must verify actual byte hashes rather than infer success from partial output. Under the owner's separate existing release authorization, the same focus repair was cherry-picked as main `0b6f4b39eb412dbc5daa0546a6bff4553d983950`, normally pushed and directly verified18:49:17UTC. Pipeline834 is queued behind833. Neither deployment nor requested Ollama activation is verified. Chromium page crashes from833 remain a separate reliability investigation; a runner observation is not a demonstrated crash cause. The local synthetic Docker ingress-topology lane failed before resource creation because Docker Desktop's Linux daemon is unavailable. This is unavailable infrastructure, not a passing topology or production F04 check. The failed command/log is retained under `.artifacts/phase7/current/p712-security/3.log`; existing operator requirements remain. ## Preservation and decision boundaries The [57-group matrix](../PRESERVATION.md) remains56 PARTIAL/C11 DEFERRED. PARTIAL records finite proof and missing complete human/provider/output evidence; it is not a count of established defects. All original32 routes plus the approved Documents route remain in scope. P2-D01 must pass as an ordinary case. No skips, expected-failure markers or relaxed assertions may conceal failures. Human reader/device/software-keyboard and production font/photo/native-print qualification, actual provider operations, historical reliability debt, Board scaling, deferred followMode/P5-05/P5-13 and production ingress/restore/configuration/schema/rollback gates remain. Axe incomplete observations remain in their checkpoint reports; automation does not supply human acceptance. Final decisions and publication receipt follow only after the applicable lanes and reconciliation finish. Production readiness remains **NO-GO**. Phase8 implementation has not started.