# Phase 10 handoff for PRODUCT-REVIEW-01 11 November 2026. **Prepared; entry decision pending.** Read ACCEPTANCE_PROPOSAL.md and record the Phase 10 milestone decision before treating this as an accepted predecessor. ## Baselines The frozen cleanup branch is `feature/phase10-cleanup` in the p10-assessment worktree. Accepted predecessor `5cb903b989742b7a96cb22ddf4c0e24993b18980` contains frozen source `ba04d817fed26d659bfa2a56b089d6cac851dc34`. CLEAN-20 removed only unused App.css. Current P10 source, evidence and group reconciliation are recorded in P10-00–05 and PRESERVATION_DISPOSITION.json. The separately developed A3 successor is `codex/a3-ui-10` in direct-roadmap-integration. Use `docs/direct-roadmap/LATEST_CHECKPOINT.md` for its exact published ref. Its scoped implementation receipts and final Gate F are separate. Select the latest accepted application integration as the review baseline, and record its source identity before findings. The frozen cleanup approval alone does not accept a later A3 successor. ## Accepted evidence to carry with its original scope - CLEAN-20 candidate proof, rollback and five fresh browser cases are in P10-01. - Canonical Career Profile, historical/imported CVs, letters, frozen packages, renderer compatibility, revision ownership and RD21 are retained in P10-02. - Backend/configuration/dependency retention and separate SQLite retirement gates are in P10-03. - Local full regression comprises 1,448 backend and 1,031 frontend cases. Native receipts, raw hashes, independent integrity checks and historical environment/fixture binding are in P10-05. Earlier selected totals overlap. - The 57 preservation groups retain 56 PARTIAL and one DEFERRED, with all source criteria and 34 routes preserved. Product review must inspect their remaining user-value and qualification gaps without deleting partial functionality. - Human/device, providers/models, advisory/security, hosted, recovery and production evidence keeps the limits in ACCEPTANCE_PROPOSAL.md. Production remains NO-GO. ## Product review entry and delivery Read complete `Prompt 6 — PRODUCT-REVIEW-01.txt` and its required sources. Its observed SHA-256 is `544d11a2d1e9a913397766c7e475f63338f0b735d2bb26dcabdedb6fe9e25a58`. Create or reconcile `planning/product-review-01` from the selected accepted development baseline. Preserve existing planning work. Perform and record the independent actual-application/journey audit before evaluating predefined initiatives. Then produce the ranked Markdown/JSON/schema backlog, priorities, dependencies and delivery specifications required by Prompt 6. Reconcile them with the continuing direct-roadmap TODO and existing authoritative documents. Keep foundation/security/reliability work distinct from speculative commercial scoring. Product review's own deliverables are research/planning; implementation authority belongs to the applicable approved workstream. The deferred CV-import engine overhaul and personal portfolio remain outside the task. Additional deletion, Global Jobs entry/provider rights, additional-locale publication, homepage design, protected security/operational decisions and final release retain their gates. No main merge or production deployment is authorised.