597191f384
F0-F2 fully shipped this session; F3 and F5 partially shipped. Each phase section now states exactly what landed (with commit references), what was deliberately deferred and why, and what a future session should pick up next -- so the roadmap stays a source of truth instead of drifting from the actual repo state. Notable corrections made while auditing: JobCvMatchService already reads a structured+text hybrid (the F5 "retarget" line item was based on a stale assumption, resolved as not-needed rather than deferred); F1's read-path cutover and F2's pre-existing-row backfill are explicitly still open, not silently done.