Files
cesnimda 1bbbd05ed5
CI and Deploy / test (push) Failing after 34s
CI and Deploy / deploy (push) Has been skipped
docs(redesign): record product brief and phased audit handoff
2026-09-09 18:21:48 +02:00

3.5 KiB

Implementation Plan

Strategy

Do not rewrite the entire frontend in one uncontrolled change.

Use a phased migration with explicit checkpoints.

Phase 0 — Finish product functionality

Before the visual/UX redesign begins:

  • finish current functional changes,
  • avoid spending excessive time polishing legacy visual styling,
  • stabilise backend/data-model behaviour,
  • run tests,
  • create a pre-redesign checkpoint.

Phase 1 — Audit

No broad design changes.

Inspect and document:

  • frontend framework and build setup,
  • current styling solution,
  • component libraries,
  • routing,
  • state management,
  • authentication,
  • localisation,
  • API integration,
  • test setup,
  • every current feature and workflow.

Deliverables:

  • technical frontend audit,
  • functionality inventory,
  • route/page map,
  • component inventory,
  • risk list,
  • proposed migration approach.

Phase 2 — Functional baseline

Add or improve regression coverage around critical workflows before changing them.

Deliverables:

  • stable baseline tests,
  • known failing tests documented,
  • explicit protected-functionality checklist.

Phase 3 — UX architecture

Define the target product shell and information architecture.

Deliverables:

  • sidebar structure,
  • page hierarchy,
  • route migration plan,
  • job workflow,
  • Career Profile workflow,
  • CV workflow,
  • dashboard architecture,
  • contextual AI pattern,
  • responsive interaction model.

Avoid large implementation until this architecture is coherent.

Phase 4 — Design system foundation

Implement shared tokens/components:

  • colour tokens,
  • typography,
  • spacing,
  • radii,
  • shadows,
  • motion,
  • light/dark themes,
  • form controls,
  • buttons,
  • tables,
  • dialogs/drawers,
  • empty/loading/error states,
  • page layout primitives.

The agent may replace the current UI/component layer if doing so materially improves maintainability and consistency.

Phase 5 — Representative screens

Implement only the most representative areas first:

  1. App shell/sidebar
  2. Dashboard
  3. Jobs workspace
  4. Job detail
  5. CV builder

Use these to validate the design language before migrating the entire application.

Phase 6 — Review checkpoint

Before broad rollout, inspect:

  • consistency,
  • usability,
  • density,
  • dark mode,
  • mobile,
  • Norwegian localisation,
  • AI patterns,
  • component reuse,
  • performance.

Fix system-level issues now rather than replicating them across every page.

Phase 7 — Full migration

Migrate remaining areas, including:

  • authentication,
  • onboarding,
  • Career Profile,
  • CV library,
  • Documents,
  • application/cover-letter workflows,
  • Analytics,
  • Notifications,
  • Settings,
  • Admin,
  • error pages,
  • empty states,
  • remaining dialogs and forms.

Phase 8 — Dashboard customisation

Implement per-user dashboard configuration:

  • visibility,
  • ordering,
  • resizing where supported,
  • reset defaults,
  • persistence.

Admin dashboard remains separate.

Phase 9 — QA

Run:

  • automated regression tests,
  • visual inspection,
  • responsive inspection,
  • keyboard/accessibility checks,
  • English/Norwegian checks,
  • light/dark checks,
  • empty/large-data edge cases,
  • document/CV pagination checks.

Phase 10 — Cleanup

Remove only genuinely obsolete legacy UI code after:

  • confirming no route still uses it,
  • confirming tests pass,
  • confirming functionality inventory is satisfied.

Branching recommendation

Suggested:

  • stable branch/tag: pre-ui-redesign
  • working branch: feature/ui-redesign

Use smaller commits grouped by system/component or migrated workflow.