15e5464da7
Reject final-admin demotion and deletion at the API boundary. Require explicit confirmation before any administrator role removal.
3.3 KiB
3.3 KiB
JobTracker session handoff
Updated: 2026-08-15
- Exact current task: continue the 2026-08-15 application UX programme; next implement dedicated
/jobs/:idworkspace/list/sidebar/notification changes after the completed theme/admin safety increment. - Last completed step: pushed
bd5362c; then V-161 canonical theme, Alert contrast, app-owned CV confirmations and final-admin protection passed focused tests/build and awaits the next logical commit. - Files currently modified: theme/bootstrap/tests, admin API/UI/tests/translations, CV dialog use, UX verification/tracking documents.
- Commands already run: V-160 focused/build and push; V-161 backend 4/4, theme/confirm 8/8, admin UI 3/3, production frontend build and patch/native-confirm review.
- Test results: backend baseline 631/631 plus focused admin 4/4; frontend baseline 207/207 plus focused V-161 11/11; production build passes. Jest retains its known force-exit/open-handle notice.
- Services currently running: none on task-owned ports 3000/5202. Playwright stopped its disposable API/Next servers. Pre-existing Docker services were not changed.
- Temporary files or processes: no task-owned process is running and the failed disposable migration database was removed. Existing synthetic browser evidence/account and startup-created local backup remain documented. No provider account, real email, private content, paid service or production service was accessed.
- Production changes currently active: none. No deployment, migration, provider connection/sync/send or production payload occurred.
- Rollback status: downgrade
20260810080858_AddEmailDraftClientRequestId, then20260810075206_AddEmailDrafts, before reverting draft commits; then follow the existing MAIL rollback order (ee5ef7e,449faeb,123fc55/e9937ac, ledger downgrade before653f011). No production migration/deploy/provider grant occurred. - Uncommitted changes: V-161 theme/admin/dialog safety and tracking; no dependency/schema/config change.
- Known failures: live deployment is not verified because PR deploy is intentionally skipped and the active branch is not approved for merge. Draft export/API/UI, full thread/category actions and non-Gmail review remain; existing accounts need re-consent and IMAP stays read-only. A clean full-chain SQLite apply fails in the pre-existing JT-019 migration before the new draft migration. Browser/provider/MariaDB/production unavailable or unverified; recovery scan performance is unmeasured at large ledger scale; Jest open handles; SEC-006 parser dependency work is still separately gated; parser isolation remains SEC-007.
- Exact next action: commit/push V-161; replace the route-backed job popup with the dedicated workspace while preserving working job actions and URL-owned list state.
- Work that can continue independently: JOBS-002, PRODUCT-001 and VER-001. UX/JOBS production, MAIL provider mutations, SEC-006/007 and PROD packages retain their recorded external gates.
- Decisions still required from the user: none for synthetic/code-inspected repository work. Any provider connection or send test, internet/package upgrades, private data, external/paid providers and production actions retain explicit approval/safety gates; SEC-009 retention/legal policy remains unresolved.