Direct-roadmap continuity

2 November 2026. Worktree: C:\Users\Connor\.codex\worktrees\p10-assessment\Job tracker. Branch: feature/phase10-cleanup. Initial HEAD: fc5b9d377199ce51f480a920a3772108094929e3; reported handoff 5cb903b989742b7a96cb22ddf4c0e24993b18980 is an ancestor and matched its original branch's live remote readback. Frozen application source remains ba04d817fed26d659bfa2a56b089d6cac851dc34.

Completed and current gate

Continuation, 2 November 2026: the owner instructed “continue as far as you can” in response to the specific CLEAN-20 proposal. This is taken as permission to continue that nominated scope, not approval of additional candidates or later initiatives. Implementation still cannot begin across the mandatory publication gate. A normal push of clean local 8cdff28f0781e4c99efd06079149d9933e01cd4e was retried once and again failed with the same remote SIGSEGV/pre-receive rejection. Independent remote readback again returned only the original handoff branch at 5cb903b; the Phase 10 ref is absent. No server repair or hook bypass was attempted. The approval-pending statements below describe the preceding checkpoint; this continuation supplies the latest chat instruction, while publication remains BLOCKED.

Dependency disposition: P10-01 waits for required publication; P10-02–05 wait for their preceding checkpoints and applicable candidate decisions; PRODUCT-REVIEW-01 waits for accepted Phase 10; Global Jobs, I18N, Launch Site, Security Audit and Release Readiness wait for their ordered predecessors and entry gates. None is an independent next item that can be started by skipping this failure. The remaining external action is operator resolution of the Git-server hook fault, followed by normal push and exact remote verification. Preserve local work and stop at this boundary.

  • Completed P10-00; preserved the existing staged worker draft with a dated review note. Only Markdown changed.
  • Fresh checks: 263 indexed evidence hashes, 1,280 current frozen source files and 7 verifier-source entries all match; 57 groups retain 56 PARTIAL/C11 DEFERRED; 34 distinct routes match the preserved register. Product suites were NOT RUN. Historical results remain historical.
  • Sole proposed candidate: P10-01/CLEAN-20, delete the unimported original CRA job-tracker-ui/src/App.css, blob 74b5e053450a48a6bdb4d71aad648e7af821975c. Exact callers/data/routes, required checks, rollback and stop conditions are in P10-00. All other assessed compatibility code remains retained.
  • Await explicit candidate-specific owner approval in this chat and successful required publication. No implementation is authorised yet. Do not treat approval of this stylesheet as permission for P10-02 or another initiative.
  • Assessment checkpoint: 7ba1367fd2e84375b3065eeedf9176a34996f77b, docs(phase10): complete direct P10-00 assessment. Four Markdown files, 258 inserted lines including the preserved staged draft. Documentation links, original-draft preservation, candidate hash and no-product-change assertions passed; staged git diff --check passed. Working tree was clean after that commit.
  • Publication FAILED / advancement BLOCKED. Normal rtk proxy git push -u origin feature/phase10-cleanup exited 1: remote fatal error: fault, SIGSEGV, github.com/go-enry/go-enry/v2/data.map.init.6(); final result pre-receive hook declined. Independent subsequent git ls-remote origin refs/heads/feature/phase10-cleanup refs/heads/test/pre-phase10-ux-acceptance returned only 5cb903b989742b7a96cb22ddf4c0e24993b18980 for the handoff branch. No Phase 10 branch was published. No infrastructure repair, hook bypass or force push was attempted.
  • The documentation-only commit containing this publication receipt is also local; resolve its exact SHA with git rev-parse HEAD. It changes no product source. Do not describe either local checkpoint as remotely verified.

After the Git-server operator resolves the hook fault independently, normal publication and exact remote readback remain required. Do not retry indefinitely or repair the server in this task. Owner approval of CLEAN-20 can be recorded while publication is blocked, but implementation must wait until both gates are satisfied. Assessment content completion is not published checkpoint acceptance.

Resume without repeating the assessment

Read any newer owner reply and this handoff. Inspect current Git state and the candidate/source identity. Reuse the source-bound accepted evidence if unchanged. If CLEAN-20 is approved, perform only its documented patch/verification/publication, updating evidence and this handoff. Do not reinstall/retest unchanged product scope merely to restart this chat. Significant or affected changes require fresh applicable checks. Missing dependencies/graph/build/runtime prerequisites must be reported accurately, without modifying another worktree or inventing results.

No autonomous controller commands or state, keys, signatures, approvals, configuration or queue may be used, repaired or changed. It must remain paused. Do not modify C:\Users\Connor\.codex\worktrees\pre-p10-ux\Job tracker. No main merge, production deployment, production services, application AI models or deferred CV-import overhaul/personal portfolio work is authorised.

Authoritative order after Phase 10 acceptance

All seven source files exist; their bytes were fingerprinted during P10-00. Only the active Phase 10 source was read as execution requirements here. Before entering each later workstream, read its complete source and every required linked/subordinate prompt, recheck dependencies and obtain its applicable entry decisions. Do not substitute this order table or old orchestrator records for those requirements.

Order Workstream / source below E:\Storage\Projects\Active\temp docs\final\ Source SHA256 observed
1 PHASE-10: Prompt 5 — Phase 10.txt f3d5d183a1cd653aac2207a8435ba95fbb74ef4bb8cc91d605edd959f9f4ec72
2 PRODUCT-REVIEW-01: Prompt 6 — PRODUCT-REVIEW-01.txt 544d11a2d1e9a913397766c7e475f63338f0b735d2bb26dcabdedb6fe9e25a58
3 INT-GLOBAL-JOBS-01: done\Prompt 7 — INT-GLOBAL-JOBS-01.txt c67c70862eecf677e1f2944fd0e17799068c054738d520513955fcf6542c52ce
4 I18N-01: I18N\00_MASTER_ORCHESTRATOR.md, including its entire linked prompt pack 6365901a0521d603f8059de31492bc6353229c684da23b8553df49b4844fd330
5 LAUNCH-SITE-01: Prompt 10 - homepage.txt f1d2b143796725e37b9a86643975a716f0be2109687fc772c6e26dae5172eaa0
6 SECURITY-AUDIT-01: jobjakt-security\MASTER_PROMPT.md, including its entire linked prompt pack 37bec461f84df60b787bda45db3bd9af1a6c836c6c023f3ab6dd7dc4beb2c6db
7 RELEASE-READINESS-01: prompt 11 - release readiness.txt 12c846d754b170c2e767db05816f4053d9e8c4cf58a2349121b2de91875beaf2

Phase 10 checkpoints remain P10-00 baseline, P10-01 frontend, P10-02 CV/document compatibility, P10-03 backend/dependencies/config, P10-04 data/functional verification, P10-05 full acceptance. Subsequent scopes require evidence and the applicable candidate gates. If nothing is safely removable, say so; never invent a deletion to complete a checkpoint.

Human/device/language/printing, AI semantics, provider licences, hosted CI, security and production decisions remain separate. SQLite retirement stays a separately gated initiative. Production NO-GO does not prohibit an otherwise authorised bounded assessment.