15 KiB
Phase 5 open blockers and deferred issues
Reconciled against P4-06, Phase 2 defects, Phase 3 decisions and current known issues. Planning closes no issue. “Non-blocking” refers to local Phase 5 work, never production readiness or acceptance of the defective surface.
| Issue | Status / exact limit | Classification / owner and deadline |
|---|---|---|
| P4-06-O01 collapse→mobile labels/focus occlusion | Addressed in P5-00; also aligns controls/drawers at 1024px and closes the temporary modal on desktop entry | Shell implementation gate ready; retain boundary/open-resize and focus regressions |
| P4-06-O02 long admin badge at 320px | Addressed in P5-00: same admin-only metadata in narrow account menu, header spacers track actual height | Responsive header gate ready; no claim that actual production badge overlap was previously proven |
| P4-02-D01 command invalid list children | Addressed in P5-00; populated/empty lists and native keyboard destinations protected | Command semantics gate ready; no catalogue expansion, D02–D04 unchanged |
| P4-03-D01 light Redo Tooltip 3.89:1 | Addressed in P5-00 shared opaque semantic pair; narrow old exception removed | Tooltip gate ready for tested loaded targets; not universal accessibility certification |
| P4-04-O01 toast covers bottom action | Addressed in P5-00: bottom feedback clearance, native success toast tested while open | Feedback gate ready for the defined Connections action; not a universal overlay manager or company-modal error repair |
| P5-00-D01 fixed worker data with system clock | Closed 2026-09-21: test now injects its existing fixed clock; complete backend rerun 916/916 | P5-01 baseline gate satisfied; production worker unchanged, no skip/expected annotation |
| P5-00-D02 browser Back loses Jobs row focus | Closed for Jobs in P5-03: originating list history entry retains only the numeric row focus target; all four locale/theme real-browser cases return after workspace load and focus the row. Explicit workspace Back remains protected | P5-03 Jobs navigation gate met. Revalidate the same contract if P5-08 changes workspace navigation or route behavior |
| P3-O02 command error→empty / late query results | Addressed in P5-02: failed search has Retry, aborted/late results are discarded after a newer query or close; focused and real-browser regressions pass | Search-state gate closed locally; manual screen-reader acceptance is separately open below |
| P5-02-D01 utility screen-reader operation | Automated axe and keyboard checks and command/notification semantic regressions pass; spoken names and live/state announcements have not been manually verified | Open mandatory P5-15 accessibility acceptance item. It does not block independent P5-03 Jobs work under Connor's explicit scope clarification. Operator steps and evidence request are in P5-02 |
P3-O02 workspace search replacement loses followMode |
Addressed by P5-08b readiness: only the section key changes; native history/reload retains query metadata | Query-retention prerequisite met; actual mode activation is the separate contradiction below |
| P5-08b-R01 documented follow-up mode has no consumer | Connor explicitly decided on 2026-10-07: preserve followMode metadata and defer mode-specific UI; current absent consumer is not presented as implemented |
Deferred to mail phase; does not block P5-08b. Preserve query compatibility without inventing send/generation; see readiness decision |
| P5-08b readiness rendered-capture limits and deeper presentation debt | Historical stitched/transition captures remain limited. P5-08b adds viewport captures and a named keyboard-scrollable attachment table with an independently readable empty state | Scoped narrow document clipping is addressed; backend-generated English event/content text in Bokmål, shared-dialog timing and human assistive-technology acceptance remain open. Historical review limits are not erased |
| P4-02-D03 mobile progress scroll not focusable | Closed for the targeted strip in P5-08a: named keyboard region, native arrow scrolling, visible shared focus and current-step semantics | Scoped G-WORKSPACE 08a gate met; does not certify deeper accordions or full screen-reader acceptance |
P4-02-D04 literal AI context {name} |
Addressed by P5-08b readiness using the existing interpolation argument; focused AI review regression protects the actual source name | Source/context/API unchanged; live-provider grounding certification remains separate |
| P4-02-D02 company-save error outside accessible modal | Open; draft retained, transient toast hidden by modal isolation | Does not block Phase 5 shell/navigation. Company form/Phase 7 owner; direct company-form restructuring requires durable in-modal error. P5-00 toast position does not close this |
| P4-04-O02 concurrent SQLite notification save | Open, earlier 2/10 native attempts HTTP 500 / database locked | Separate backend reliability; no shell/visual blocker with unchanged calls, but any increased polling/write concurrency waits for proof. Sequential passing test does not close it |
| P2-O01 isolated rules-save 500 | Historical unconfirmed, cause not established | Separate reliability triage if recurrent; keep successful native oracle, no generic retry mask |
| P4-05-O01 English status actions/browser-locale dates | Closed for Jobs/Trash in P5-03: standard status display uses existing translations, custom status text and raw API keys remain stable, and applied/deadline display follows UI language | P5-03 localized table gate met in English/Bokmål; stored date/time semantics are unchanged |
| P2-D01 native SQLite tailoring/capture | Closed/passing in P5-08b readiness: frozen source/file readback plus real SQLite/account ZIP and copy-failure/retry proof | Ordinary regression retained in P5-08b; no expected-failure branch. CV revision/geometry and production restore remain separate |
| F01 / audit D01 stale CV revision (related profile/job revisions distinct) | CV save/restore protected in P5-09 readiness: expected version, atomic compare, append-only settings and recoverable browser draft; no schema migration | G-CV-REV satisfied locally, retained by pagination repair. Profile/job lost updates remain distinct and are not closed. Later CV slices still require their own scope/acceptance; no automatic B07 |
| Creation-intent idempotency | Open independent contract; not B02 identity or stale revision | Separate backend/product work; no Add/import/POST-on-mount expansion in Phase 5. Existing create review/no-write navigation must remain |
| CV margins/templates/preview/pagination | Pagination repair passes all 16 original fixtures at unchanged tolerances, with native screen fragmentation and measured printable-area rounding; PDF unchanged | Local numerical rendering gate satisfied. Broader wrapped-line/photo/deployment-font qualification and existing controls/print-quality debt remain explicit; P5-11/P5-12 retain their separate scope and acceptance. No broad renderer replacement inside UI slice |
| Table/Board filter/population mismatch | Read prerequisite resolved in P5-04b readiness: shared logical query, complete ID membership, owner/trash/derived filters and mutation refresh proven | P5-04b integration preserves that query/route contract; full-array scaling remains an explicit limitation |
| P3-O01 analytics names/periods/populations | P5-06 addresses Dashboard labels; P5-07 reuses and revalidates the same cohorts/snapshots/samples and exact values in Analytics, independent of Dashboard flags | Dashboard/Analytics G-METRICS has scoped regression evidence; current server population/date limitations remain documented and backend metric/timezone repair remains separate |
| P5-06-O01 native language preference 500 during reads | One full-run fixture response was generic 500 while Dashboard/setup reads overlapped; exception/root cause not established. Visual setup now writes the native preference before mounting the next fixture, still requiring 204 | Separate baseline auth/storage investigation, not resolved by presentation. Concurrent language mutation during loading is not certified; observation and test sequencing |
| P5-07-O01 attachment confirmation focus observation | Initial full run: unchanged light/English desktop Shift+Tab from Cancel did not retain Delete focus; existing transition onEntered also refocuses Cancel. Race explanation remains uninstrumented |
Separate shared-dialog accessibility investigation; no provider/test change in Analytics, no closure from a passing rerun. Evidence |
| P5-08a-O01 next-task destination adapter | Addressed in P5-08b readiness: canonical-profile task opens existing Career Profile; legacy documents/checklist/timeline/communication entries reveal/focus their existing disclosures | Scoped adapter prerequisite met, with query/history and dirty-navigation regression evidence; no new workflow |
| P5-08a-O02 menu entry contrast scan | Two complete runs caught unchanged dark Dashboard menu text during entry; direct inspection found opacity 0.0111545 before settling to 1. The original scan now waits for settled opacity and passes unchanged rules | Validation fixture synchronization only; no Dashboard styling repair or transition-wide/manual certification. Both failed summaries and scan targets remain recorded |
| P5-08a-O03 deeper accordion duplicate ARIA IDs | P5-08b readiness removes redundant Details IDs and scopes summary/region names; focused tests prove one linked region and native section navigation | Scoped structural prerequisite addressed; incomplete scans/manual screen-reader acceptance are not universal passes |
| F04/B06 production ingress | Open; repository/local checks are not deployed proof. Historical DNS/HTTPS observations do not prove actual peer/firewall boundary or current topology | Production gate; does not block local P5 slices. Operator evidence for actual Traefik peer, nginx trust, listeners/ports, direct/spoofed access, B04 client IP, firewall/NAT/IPv6, DNS/TLS/redirect and restart needed; no closure or credentials accessed here |
| Protected-main CI/browser runner and deployment | Unresolved remote-runner evidence; local tests pass | Separate release gate; feature-branch docs/UI push is not production deployment approval |
| F19 missing provider/config falls back to SQLite | Open source carryover | Separate startup/deployment safety, not a UI redesign dependency; no backend provider change here |
| F20 enabled worker fault containment | Open, worker disabled by default; enabled loop lacks outer recovery | Separate worker/operational gate before enablement or new producers; P5 utilities preserve current operations only |
| F21 calendar unspecified DateTime/DST | Open; existing date actions not certified correct across offsets | Separate calendar/backend gate before event/time semantics change; retain current deadline/follow-up links/ICS, no new interview scheduling |
| Backup/restore/rollback and legacy schema cutover | Production restore/cutover evidence pending | Separate release/schema gate; no schema in P5. Required before any external prerequisite that actually needs one |
| Stripe activation, paid deletion/retention/provider cleanup | Configuration/policy/provider proof pending; deletion remains gated | Separate product/backend/release work; no new billing/trial/delete UX claims or Settings migration |
| Provider mail/AI/calendar/OAuth delivery | Partial local mocks/service tests, no universal live provider certification | Does not block unchanged navigation/presentation; actual send/reconnect/provider semantics changes wait for sandbox/operator proof. AI truthfulness is not guaranteed by a review dialog |
| Full screen-reader/touch/zoom/forced-colors coverage | P4 manual browser checks partial; incomplete axe nodes remain | Affected-slice accessibility acceptance gates per visual protocol; unavailable evidence must stay open, not counted as success. Public certification remains blocked |
| P5-04b-R01 command entry/focus timing | One full-run failure on unchanged command/theme/test code; trace shows keyboard focus-visible gained then lost around the dialog's entry callback. Three unchanged focused reruns passed | Separate shell accessibility debt before P5-15, not query-population parity. Observation; no assertion weakened or shell repair attempted |
| P5-04b-R02 CV section-expansion smoke | One full-run failure on unchanged CV editor/test, before PDF export; three unchanged focused reruns passed; cause unproven | Existing CV readiness owner, not Jobs integration. Observation; keep the regression and investigate before broad CV migration |
| Historical post-axe NB glyph omissions / scrolled table screenshot edges | Capture limitations, not accepted typography/column alignment | Evidence quality gate: pre-axe captures, DOM/text verification, start-of-scroll and focused-scroll comparisons in P5. No product fix inferred without reproducing it |
| Original P4 unnamed targeted controls / preview keyboard defect | Closed for P4-02/03 targets only | Not a blocker, retain tests; advanced untouched controls still need their own loaded-state proof |
| Historical TS2571 | No longer present; standalone gate passed | Not a blocker, retain CI type gate; do not describe as current expected failure |
Product/new-requirement boundaries
Final name/logo/primary color remain OD-01–03: use current provisional values, so no shell delay. Email provider (OD-05), external jobs/calendar integrations (OD-06), monetization (OD-07), favorite/priority (OD-08), aggregate admin/privacy definitions (OD-09), intake (OD-10) and weekly goals (OD-11) are separate decisions before their future features. Do not invent LinkedIn integration or scheduled interviews.
OD-04 dashboard cross-device persistence and NEW-01 ordering/resizing/reset remain Phase 8. P5 preserves all five existing owner-local visibility flags. NEW-02 expanded entities, NEW-07 general AI panel, NEW-08 admin metrics and NEW-11 cross-job documents require data/ownership contracts; P5-02 does not implement them. NEW-10 active preview is explicitly deferred, not silently represented as preserved production functionality. Full Career Profile, library, Documents, mail, Settings/Admin and Notifications page work remains Phase 7.
Before each implementation, check this register against its latest actual evidence. Close a row only with its reproduction/acceptance proof and linked change; keep original audit records intact. A failed prerequisite pauses only dependent scope. Planning success is not an implementation or production GO.