Files
jobtrackingapp/docs/automation/handoffs/pre-phase10/ROADMAP.md
T

2.8 KiB

Roadmap contract projection

Read from committed codex/autonomous-roadmap-01 policy only. This projection is not a second queue, does not configure execution and does not authorise any stage. The external controller must reconcile its immutable manifest with the final published handoff commit and obtain protected approvals. All current deferrableGates arrays are empty; a conditional status alone cannot advance.

Sequence / stage Required predecessor Additional authority before implementation/advancement
05 PHASE-10 Finished pre-Phase10 evidence and exact published baseline phase10-development-entry; exact unused candidate/consumer/inventory/rollback proof; qualified native sandbox and actual stage test adapter; signed stage-requirements-review. No cleanup started here
06 PRODUCT-REVIEW-01 Accepted Phase10 Independent review/ranked proposals, then product-ranked-scope approval before resulting implementation scope
07 INT-GLOBAL-JOBS-01 Accepted Product Review, reviewed GJ-00 planning global-jobs-implementation, product-ranked-scope; provider-licences-and-display-rights before provider checkpoint. Never infer scraping/content rights from technical reachability
08 I18N-01 Accepted Global Jobs i18n-scope and later human-linguistic-and-market-qualification; coordinate locale/geography/taxonomy and marketing catalogs. Drafts do not enable public locales
09 LAUNCH-SITE-01 Accepted I18N Four actual design concepts/research, owner homepage-design-selection before implementation, preserved revision feedback; no model-selected final design
10 SECURITY-AUDIT-01 Accepted homepage security-test-environment-and-scope, isolated-adversarial-targets, significant scanner cost approval where applicable, material-security-findings-disposition and stage review
11 RELEASE-READINESS-01 Accepted security audit Independent backup/restore/recovery/deployed/security/provider/manual evidence, release-evidence-review and stage review. Recommendation only; this queue has no main merge/deploy stage

Separately retained initiatives: P5-13/C11 deferred AI model assessment and semantic qualification; LinkedIn feasibility; Android application; staged SQLite retirement; MariaDB upgrade strategy; monitoring/operational improvement; future country integrations. These are tracked future work, not silently completed, deleted or smuggled into cleanup. No MariaDB major upgrade or SQLite retirement is authorised here.

GJ-00 branch planning/int-global-jobs-00 is independently published at0ec9f98e6ed4a646fc5e017d8eb6fade07653f37; it diverges from the later pre-Phase10 integration history. Do not blindly cherry-pick/merge its planning commit. Future authorised integration must reconcile its documents against the accepted current development source and provider evidence freshness, preserving every completed workstream.