11 KiB
Phase 7 — Retained debt and mandatory gates
This is the current entry disposition of every RD01–RD28 obligation in the Phase5 debt register, reconciled with successor dispositions, Phase6 final report and exact handoff. Historical records stay intact. This table updates scoped outcomes rather than copying obsolete source descriptions as current facts.
Production remains NO-GO, main unchanged. Independent bounded development can continue with explicit conditions; a demonstrated severe shared/security/data failure blocks its dependent propagation. Actual provider/production/destructive actions retain separate authority.
Every retained debt
| ID | Current entry disposition | Dependency / permitted Phase7 boundary |
|---|---|---|
| RD01 | F04 actual production ingress/topology/trusted socket peer/TLS/IPv6/firewall/client identity remains OPEN | Release gate; local ingress tests do not supply actual deployed proof |
| RD02 | Current complete DB/files/CV/export/DataProtection/tombstone recovery set and isolated restore UNVERIFIED | Release/lifecycle gate; backup download is not restore evidence |
| RD03 | Effective provider/schema/configuration/secrets/startup and F19 fallback UNVERIFIED | Release gate; no DDL/cutover or provider assumption hidden in presentation |
| RD04 | Isolated Linux failure/rollback rehearsal and complete prior images/config UNVERIFIED | Release gate; production restore/restart not authorised |
| RD05 | Protected CI/runner/deployed SHA/authenticated smoke identity UNVERIFIED | Release gate; repository main identity is not deployed identity |
| RD06 | Human reader/state/name/contrast and contextual axe acceptance remain OPEN | Applicable M01–M12; current52+267 inventories below supersede old counts; no conformance claim |
| RD07 | Physical touch/software keyboard/mobile AT/forced-colors/text-spacing/alternate-browser acceptance NOT VERIFIED | Applicable actual operators/devices; finite emulation/zoom does not replace them |
| RD08 | P5-13 model semantics/review UI remains DEFERRED/UNQUALIFIED/withheld; frozen32 cases,0/366 configured-target calls,0human reviews | PRES-C11 and M13 do-not-execute; no automatic model qualification or UI activation |
| RD09 | Production CV proposal503/no-provider/no-write has local contract proof; actual deployed withholding unverified | Preserve guard and unrelated existing AI; no unqualified generation/Apply |
| RD10 | Actual production Linux/fonts/portrait/crop/print/other-browser output qualification UNVERIFIED | Local original16/36+8/24 oracle remains passing and finite |
| RD11 | Language preference500 server root remains OPEN; P6 now shows local/account scope failure, explicit retry and latest-choice race protection | P7-09 retains repaired feedback; do not claim concurrency/server cause fixed |
| RD12 | Notification-setting SQLite locking/server contention remains OPEN | P7-09 retains draft/in-page error; diagnose intended-provider writes before stronger reliability claim |
| RD13 | Historical Rules500 cause unconfirmed/OPEN; prior durable error/retry/discard/internal-draft repair retained | P7-09 keeps Rules save owner/draft lifetime; no generic retry hides root |
| RD14 | Command/dialog focus timing incident cause remains unproven | All changed modal/shell owners require actual trap/restore/transition proof; clean rerun is not diagnosis |
| RD15 | CV section expansion historical intermittent cause remains unproven | Retain failed observation and original assertions; investigate if reproduced |
| RD16 | Scoped P6 company-error defect repaired: durable dialog-local accessible alert, retained draft and retry readback; focused/integrated ordinary cases pass | P7-05 must preserve it; whole actual-reader/dialog/contact/date acceptance remains PARTIAL |
| RD17 | Complete Board result grouping/rendering remains O(N); measured200/1,000 observations prove capacity cost, not a budget | Preserve full membership/query parity; separately bounded measured capacity work, no hidden result cap |
| RD18 | Board/CV physical selection/drag/drop/cancel/browser variants NOT VERIFIED | Applicable M03/M06/M12 physical evidence and named keyboard alternatives; no invented cross-section feature |
| RD19 | followMode producers/query metadata retained; reviewed consumer remains DEFERRED |
P7-06F requires explicit mode→draft/review action/fallback before implementation; no auto-send/resend |
| RD20 | P5-05 optional read-only quick preview remains DEFERRED; unsupported NEW/OD and Phase8 scope remain reserved | No second full editor or early Dashboard order/resize/reset/cross-device widget framework |
| RD21 | Canonical profile/job stale-save and creation-intent idempotency remain OPEN, separate from verified CV revision | Resolve or explicitly bound concurrency before save/history owner expansion; P7-03 retains current presentation-only behavior |
| RD22 | F20 enabled-worker outage recovery/durability remains OPEN | Inspect intended gates; recovery/no-loss/no-duplicate proof before new enabled producers; no worker activation |
| RD23 | F21 calendar offset/DST/date-only semantics remain OPEN | P7-05/06 retains existing links; dedicated contract/provider proof before semantic changes or scheduling claims |
| RD24 | Billing/deletion/retention/tombstone/provider-cleanup policy/configuration UNVERIFIED | P7-09 presentation only; no checkout/deletion/restore activation or guessed policy |
| RD25 | Real OAuth/Turnstile/mail/calendar/model/signup delivery/reconnect/privacy semantics remain finite/unqualified | Current provider protocols retained; actual authorised sandbox/human evidence for affected acceptance; never auto-resend uncertain delivery |
| RD26 | Legacy Job/Application expand-verify-contract cutover remains OPEN | No compatibility column/read/write removal; separately authorised production/restore reports and rollback |
| RD27 | Actual monitoring/alerts/recovery owner/runbook coverage UNVERIFIED | Release failure-detection/recovery gate; do not fabricate centralized sink/alerts |
| RD28 | Evidence scope/failure provenance and original closures must be preserved | P2-D01 ordinary pass; no assertion relaxation/skip; inherited old attachment-loss limits remain explicit |
The IF-CV-UNSAVED-01 recoverable-draft/Unsaved intermittent trace obligation also remains open under the CV revision/evidence boundary; successful native held-PUT/history runs do not diagnose every historical incident. Dashboard measured duplicate source reads/layout shifts remain bounded follow-up candidates, not proven backend defects or comparative performance improvements.
Current accessibility inventory and triage
Actual final Phase6 report SHA256 is a908c30a8435448b00849171e3cb9ce68b96570f60c3da086409e434d1bcd82a; measured source/export are bd47214bdcd74336788dca0f294b8ddb9403cac1 / 2LDblja_XnSBWSuY6ys_V. The aggregate retains exact attachment hashes/counts and detailed or representative contexts; complete raw node vectors remain in its identified source report.
| Scope | Snapshots | Violation-node occurrences | Incomplete occurrences |
|---|---|---|---|
| Detailed all-enabled | 52 | 11 | 435 |
| Retained WCAG-tagged/domain-scoped | 267 | 0 | 2,038 |
| Combined mixed scope | 319 | 11 | 2,473 |
Counts repeat across states and are not unique defects, all-enabled coverage for319, or a like-for-like Phase5 comparison. Pre-CSS49/11/342 evidence stays historical; the final repaired source52 adds two label and one settled-touch states. Restored modal workflows add16 retained-rule checkpoints versus the first failed full run's251.
| Category | Detailed52 | Retained267 | Combined319 | Required contextual treatment |
|---|---|---|---|---|
| landmark-unique violations | 5 | 0 | 5 | CV parent main/paper-frame context; preserve white print document boundaries and actual reader landmark review |
| heading-order violations | 2 | 0 | 2 | AddJob step heading and workspace Strategy snapshot; bounded semantic owner repair if reproduced, not renderer changes |
| aria-command-name violations | 4 | 0 | 4 | First emulated-touch drawer sample retains four; settled named/focused drawer has0 with Escape restoration. Do not invent transition cause or spoken acceptance |
| color-contrast incomplete | 394 | 1,766 | 2,160 | Overlap/obscured/short-text contexts need M11 measurement; tagged checks include1,380 overlap/193 partly obscured/189 short-text/4 partly obscuring nodes |
| aria-prohibited-attr incomplete | 28 | 209 | 237 | Disabled CV labels/checklist wrappers; review contextual name/state under M09/M11 |
| aria-hidden-focus incomplete | 10 | 41 | 51 | Menu/root/popover/drawer/current-state focusability; tagged contexts #menu24/#root12/popover4/drawer1; evaluate trap/isolation/return |
| aria-valid-attr-value incomplete | 2 | 18 | 20 | Command-dialog missing-label-ID/lifetime context; inspect actual lifecycle and reader names |
| target-size incomplete | 1 | 0 | 1 | Actual physical target/context under M12; no blanket spacing waiver |
| th-has-data-cells incomplete | 0 | 4 | 4 | Four list-error light/dark EN/NB captures target table and report missing/empty data cells; M11 error/header/data context and M09 recovery, no established application defect from incomplete alone |
Settled touch still retains contrast4 and hidden-focus1 (#root) incomplete; it is not blanket accessibility clearance. Applicable manual M01–M12 remain NOT VERIFIED, especially M09 spoken names/errors/state, M11 contextual contrast/forced colors/motion and M12 physical touch/software keyboard/orientation/mobile AT. M13 is deferred AI return/do-not-execute, not the contrast packet.
Use the established accessibility plan: WCAG2.2 AA project target, ordinary text4.5:1/large text3:1/control-focus3:1, visible focus/reflow/labels/errors/live state/reduced motion;44px physical-touch aim distinct from AA24px/spacing rules. No automated conformance certification.
Evidence and production limits
The early Phase6 runner retained exact failure commands/reports/logs but reused result folders, so not all old screenshots/traces/error-context paths remain resolvable. Later runs archive the whole previous output; current successful attachments have exact provenance. Preserve that limit rather than claiming complete old failure-trace retention. Native Windows Chromium/local SQLite/synthetic fixtures and finite PDF oracles do not establish deployed Linux, human semantics, physical devices, real provider quality or production load.
API transferSize0 is unavailable cross-origin timing information, not zero network bytes. CDP document/node/heap snapshots can retain earlier navigation/CV iframe documents and do not prove leak/growth. The existing measured Board/Dashboard candidates require baseline/comparative evidence before a repair or capacity claim.
Production remains NO-GO until RD01–05/RD27 plus effective schema/configuration/secrets/provider/F19, complete off-host recovery and isolated Linux rollback/deployed smoke requirements have operator evidence and a separate release decision. The workflow deploys on main push; the owner explicitly keeps main unchanged during this mission. No destructive/provider/production action is authorised by this debt table.