Files
jobtrackingapp/docs/direct-roadmap/CHECKPOINT_REPORT.md
T

3.4 KiB

Direct roadmap checkpoint - 2 November 2026

This is a consolidated progress report, not a final declaration that eligible work is exhausted. Independent research remains available. Product implementation is unchanged; the orchestrator remains paused and untouched.

Completed and published

P10-00 assessment is complete and published; candidate-specific P10-01 scope is recorded as D01. Normal Git publication now works. Existing GJ-00 planning publication is independently verified. Detailed exact commits are in WORK_COMPLETED.md.

Partial work

  • I18N: source audit and machine-readable message inventory; initial Europe matrix and schema-validated planned locale catalogue. Dynamic/hardcoded/backend text, full contextual/legal review and final compatibility decision remain. No additional language translated or released; all 60 candidates remain planned.
  • Homepage: source audit identifies sign-in versus registration CTA mismatch, conceptual SVG previews, client-only rendering, generic metadata and missing footer legal links in the component. These are documented observations, not fixes. Four viewable concepts, genuine captures, imagery licensing, rendered accessibility/performance/SEO and owner design choice remain.
  • Release: preliminary architecture and failure-boundary inventory, ten historical blocker reconciliations and 18 mandatory gate rows. Five offline guard tests passed. No release candidate qualified.

Decisions and dependencies

Approve or retain only CLEAN-20 (job-tracker-ui/src/App.css, exact blob and verification scope in OWNER_DECISIONS.md). Generic continuation is not approval. Product Review prioritisation, provider agreements, I18N implementation/native release, homepage visual design, security entry/risk and production release each retain their separate gates. Later decisions will be presented with concrete evidence, not blanket permission requests.

Security and AI

Formal Security Audit has not started. Historical advisory/TLS/parser/image/operator qualifications remain unresolved, with no new vulnerability scan or waiver. Real CV-model compatibility and semantic accuracy remain blocked; deterministic extraction evidence does not establish model quality. No models or production services were started or accessed.

Global Jobs

GJ-00 planning at 0ec9f98e6ed4a646fc5e017d8eb6fade07653f37 is remotely verified. No new country/provider integration implemented in this continuation. Existing NAV/source behavior is not evidence that the planned global feature set is live. GJ-01 requires accepted predecessors, exact implementation authority and provider rights.

Release and preserved evidence

Latest scoped PDF metric/visual acceptance remains preserved; no affected renderer/font/fixture change justified reopening it. Physical print/device/AT/native-language checks are separate. Hosted MariaDB isolation remains explicitly blocked in source. Backup existence is not restore proof; final CI, recovery, migration, provider, production-equivalent identity and rollback evidence remain missing. Production is NO-GO.

Next work

Resume the precise eligible tasks and isolated worktrees in NEXT_ACTIONS.md. Delegated work stopped at a service usage limit; the parent salvaged, corrected and extended it. No background execution is running. Ordinary independent research does not require a new blanket prompt; the remaining P10 decision does require explicit approval under the user's addendum.