Files
jobtrackingapp/docs/direct-roadmap/WORK_COMPLETED.md
T

3.7 KiB

Work completed

2 November 2026.

Work Commit / evidence Limits
Direct P10-00 assessment, preserved prior draft, candidate inventory, rollback/verification proposal 7ba1367fd2e84375b3065eeedf9176a34996f77b Markdown only; no P10-01 deletion
Publication failure/continuity receipts 8cdff28f0781e4c99efd06079149d9933e01cd4e, 1692142295950e390a4cf807d9df86cc5cf96290 Earlier server failures remain historical
Restored normal publication Push succeeded; independent ls-remote exactly 1692142295950e390a4cf807d9df86cc5cf96290 No server repair, hook bypass, force push, main merge or deployment
P10 evidence integrity/source applicability 263 indexed hashes; 1,280 source files; 7 verifier sources; 57 groups/34 routes Previous direct-assessment checks; not freshly rerun product suites in this continuation
Lightweight direct-roadmap register This documentation checkpoint No runner, scheduler, approval service or replacement orchestrator

The application baseline remains source-equivalent to accepted ba04d817. Historical PDF metric/visual acceptance is preserved. Current continuation product suites: NOT RUN. Models/production services: NOT ACCESSED.

Published partial research checkpoints

All three branches start at accepted conditional handoff 5cb903b989742b7a96cb22ddf4c0e24993b18980; no unaccepted Phase 10 changes were integrated. Normal pushes succeeded and each remote ref was independently read back exactly.

Branch Exact remote commit Actual output / limits
feature/i18n-00-audit 138d8fbb6da51141b50f2acb3979458ce173a6c3 Ten research files; 3,119 English entries, 3,164 static calls, 134 files; 188 dynamic/unknown calls unresolved; initial 59-territory matrix and 60 planned locales. Existing Ajv/Intl checks passed, including rejection of released status. Full audit NOT COMPLETE
feature/launch-site-redesign 756ab616a22746a9bafa9830afd4f8efbb085794 Three source-audit/claims/handoff documents. No mockups or final implementation; rendered audit NOT RUN
planning/release-readiness-discovery edd2aa9ae428435773e5cf48167af4e0db1ef36a Five preliminary discovery/evidence/matrix/handoff documents; 5 existing offline MariaDB runner guards passed. No real DB/hosted/production qualification

Global Jobs planning remote independently verified at 0ec9f98e6ed4a646fc5e017d8eb6fade07653f37. This resolves publication uncertainty, not GJ-01 entry gates.

Delegated workers hit a service usage limit. Parent continued, reviewed and corrected incomplete draft claims, then produced and published these partial checkpoints. No worker remains active. No partial stage is promoted to completed merely because its documents exist.

Further continuation - published and remotely verified

  • Release discovery 653f8d04d469dcd52c883d4b98bea76b8adacada: complete deployment-script source inspection, recovery review and isolated rehearsal specification; RR-11 synthetic parser reproduction and RR-12/13 qualification gaps. Four existing workflow-quarantine tests PASSED, shell syntax PASSED. Initial direct Windows/sed harness failed its positive control and was discarded; shell-native rerun established the three-case result. No deployment/restore/database activity.
  • I18N research 55adc1dbd742a570d55d3a4d13f5613a7ed2ab25: records for 188 dynamic calls; 108 finite conditional calls resolved with 240 verified key references, 80 remaining; four direct catalogue reads; 26 individually reviewed literal candidates; seven stable findings. No application/test implementation changes.
  • FINDINGS.md consolidates ten new observations/contracts/qualification gaps with precise next actions. These remain separate from implementation acceptance.