3.2 KiB
3.2 KiB
JobTracker session handoff
Updated: 2026-08-09
- Exact current task: UX-002 — revalidate every theme-state source and implement deterministic saved-user/anonymous/system precedence without startup flash or cross-tab loops.
- Last completed step: UX-001 implementation
93b8692was committed. Login now uses one username-or-email/password card with sign-in-only Google/Microsoft presentations; focused/full frontend tests, build and local responsive dark-theme browser checks pass. Evidence/tracking are ready for their own commit and push. - Files currently modified: UX-001 verification/evidence/tracking documents and three synthetic screenshots under
docs/audits/evidence/ux-001/. UX-001 application code is committed. - Commands already run: initial clean-tree review/push; AI-004 implementation/evidence commits/push; UX-001 complete source trace; focused 13/13 and full 166/166 frontend tests; production build; diff checks; local browser at 375/768/1440; implementation commit. See V-104–V-110.
- Test results: backend baseline 594/594; frontend 47/47 suites and 166/166 tests; UX-001 focused 13/13; production frontend build and diff check pass. Browser local form passed in dark theme at 375/768/1440 with no measured overflow. Provider browser tests remain mocked.
- Services currently running: Next development server on
http://localhost:3000in exec session62719; in-app browser tab open at/login. Pre-existing Docker services were not changed. - Temporary files or processes: only the local Next development server and in-app browser tab. Stop the server before final handoff. No dependency declaration, database or private artifact changed.
- Production changes currently active: none. No deployment, provider/model call, private CV access, model pull, paid service, production migration or external payload occurred.
- Rollback status: UX-001 has no schema/config migration; revert
93b8692to restore tabs. AI-004 rollback is documented in its verification record; worker switches remain default-off. Production is unchanged. - Uncommitted changes: UX-001 evidence/master tracking documents and screenshots only; commit/push these before UX-002 application code.
- Known failures: light/System and configured/real-provider UX-001 browser checks remain; MariaDB/SMTP/production unavailable; SEC-006 upgrades require explicit internet/package-index permission; complete parser cancellation/isolation remains SEC-007; historical clean EF-only SQLite chain needs startup reconciliation; Jest reports its existing force-exit/open-handle notice.
- Exact next action: commit and push UX-001 evidence, then read
work.md:102-133,App.tsx,themePrefs.ts, auth user-key transitions and theme tests completely; reproduce refresh/login/logout/cross-tab precedence before editing. - Work that can continue independently: UX-002 and QA-001 repository work. SEC-006/007 await package-index permission; PROD-001/003/004 await production access.
- Decisions still required from the user: none for synthetic repository work. Internet/package upgrades, private CV access, external/paid providers and production actions retain their explicit approval/safety gates; SEC-009 retention/legal policy remains unresolved.