Files
jobtrackingapp/docs/roadmap/todo.md
T

9.6 KiB
Raw Blame History

TODO

Status reconciled: 2026-10-06.

Current repository work

  • P5-07 — existing-report Analytics destination complete: meaningful authenticated /analytics/Insights entry, shared retained Dashboard report owner, current-versus-window definitions, exact values and existing status/company drill-downs. Record. Baseline: 934 backend, 403 frontend (+5), 81 actual browser passes (+2) plus unchanged P2-D01 expected failure. Dashboard's five owner-local flags and all original routes remain; no new metrics/backend contracts. P5-08a and B07 are not started; F04, P2-D01, incomplete axe/manual screen-reader, P5-06-O01 and the P5-07-O01 observation remain open.

  • P5-06 — personal Dashboard presentation complete: existing reports, actions and five owner-local visibility flags retained; precise population/period/sample captions, shared-scale activity and exact keyboard-accessible values, independent error/retry, and native account-switch evidence. Record. Baseline: 934 backend, 398 frontend (+8), 79 actual browser passes (+2) plus unchanged P2-D01 expected failure; security 9/6/1, configuration 3. No new metrics/backend contracts or Phase 8 customization. P5-07 is recorded separately above; F04, incomplete axe and manual screen-reader acceptance remain open.

  • P5-06-O01 — native language-preference 500, cause unproven: the first full browser attempt observed a generic 500 during overlapping Dashboard/setup reads after Browser Back. Visual preparation now requires the native preference save before mounting the next Dashboard; no retry or backend repair. Investigate the unchanged endpoint separately; concurrent language writes during loading remain uncertified. Evidence.

  • P5-07-O01 — existing confirmation focus observation: an inherited light/English desktop attachment test failed Shift+Tab-to-Delete after initial Cancel focus. The unchanged provider refocuses Cancel on transition entry; a transition/focus race is plausible but not instrumented/proven. Keep separate from Analytics; no provider/test repair or weakened assertion. A passing rerun does not close it. Evidence.

  • P5-04b complete — Table/Board integration: one Jobs filter owner and URL view switch, retained /kanban alias, Table page/selection lifetime and full Board population. Acceptance/evidence. Baseline: 934 backend, 390 frontend, 77 actual browser passes + unchanged P2-D01 expected failure; security 9/6/1, configuration 3. No backend contract changes, P5-06 or B07. F04, P2-D01, incomplete axe/manual screen-reader/native touch and Board scaling remain open.

  • P5-04b query readiness complete — GO for integration's read prerequisite: shared server query and URL interpretation, full Board versus paged Table ID parity, refresh/focus and failure evidence. Record. Baseline: 934 backend, 384 frontend, 76 actual browser passes + unchanged P2-D01 expected failure; security 9/6/1, configuration 3. Earlier unchanged command-focus/CV smoke failures are recorded as R01/R02, not silently closed by passing reruns. No integration, P5-06 or B07 implemented; F04/manual screen-reader/native touch remain open.

  • P5-03 — Jobs Table and mobile cards complete: restrained table/card presentation, existing Comfortable/Compact controls, localized display, partial-bulk retry, and Browser Back row focus have real-browser and unit evidence. Baseline: 918 backend, 377 frontend, 74 actual browser passes plus unchanged P2-D01 expected failure. P5-00-D02 and P4-05-O01 close for Jobs/Trash; P5-02 manual screen-reader acceptance and F04 remain open. Stop before P5-04a.

  • P5-01 — AppShell/grouped navigation complete: existing destinations are grouped under Dashboard, Job search, Career, Admin and Account; expanded/rail/mobile access, parent/child current semantics, skip/main and route-heading focus have automated and visual evidence. Final baseline: 918 backend, 365 frontend, 70 browser passes plus unchanged P2-D01 expected failure. Record. P5-02 remains separate; no route/provider/business change or B07 work.

  • P5-02 — global shell utilities implemented, accessibility acceptance conditional: command error/retry and stale-result isolation, grouped existing commands, keyboard selection, and notification stale-load/read/dismiss presentation pass 918 backend, 373 frontend and 74 actual browser tests plus unchanged P2-D01 expected failure. Record. P5-02-D01's spoken-name and live/state-announcement check remains mandatory for P5-15; it does not block independent P5-03 Jobs work. F04 remains open.

  • P5-00 — complete, P5-01 GO: record covers the five bounded shell gates, shared 1024px navigation boundary and open-drawer resize lifecycle. P5-00-D01 is closed with the existing fixed clock injected into the test; backend rerun is 916/916. No grouped-navigation redesign or B07 work in that checkpoint. F04 remains open.

  • P5-00-D02 — closed for Jobs: P5-03 stores the originating row focus target on the list history entry and restores it after Browser Back and data load; explicit workspace Back remains intact. Four locale/theme browser cases pass. Revalidate if P5-08 changes workspace navigation. Evidence.

  • Phase 5 plan: bounded plan maps all 57 contracts/31 routes. Board integration, native package and CV revision/rendering gates apply only to dependent slices. F04 remains open.

  • P2-D01 — open: repair the SQLite DateTimeOffset ordering baseline before package/tailoring restructuring; retain the expected-failure browser oracle until native capture and historical-binary preservation are proven. P2-O01's initial rules-500 behavior also remains unconfirmed.

  • P3-O01/P3-O02 — scoped follow-up: P5-06/P5-07 address Dashboard/Analytics population/period/sample presentation and independent error retention. Backend metric definitions and other navigation/query surfaces remain separately scoped. Evidence is in the current redesign decision records.

  • P4-02-D02–D04 — open accessibility/content debt: company save-error feedback outside the modal's accessible subtree, mobile application-progress scroll region and literal AI context {name}. D01 command-list semantics are addressed in P5-00; D02–D04 are unchanged. Original evidence. Do not disable modal background isolation or hide findings.

  • P5-00 scoped closures: P4-03-D01 Tooltip contrast, P4-04-O01 bottom-action toast overlap, P4-06-O01 mobile labels/focus and P4-06-O02 synthetic long admin metadata are addressed with readiness evidence. This does not certify all overlays, all accessibility targets or deployed production behavior.

  • P4-04-O02 — existing SQLite notification-save contention: overlapping native preference read/write requests reproduced HTTP 500 with SQLite error 5 in two of ten local runs. The sequential UI test now awaits and requires the save response before readback; server concurrency remains unresolved. Investigate separately from page-layout/density work. Evidence.

  • P4-05-O01 — closed for Jobs/Trash: P5-03 localizes standard status display and date labels while retaining raw API status values, custom labels and stored dates. Evidence.

  • F04/B06 — open: complete the authorized main release and production ingress/runtime verification; the browser gate and runner diagnostics remain unresolved. No gate should be bypassed.

Delivery and feature gates

  • Deploy the verified CV Builder/UI batch through protected main and confirm the live health/version transition.
  • Run authenticated production CV editing/PDF, existing-data, attachment, email-verification, OAuth, and rollback smoke checks when an authorized session is available.
  • Activate Stripe only after the recurring Pro price, portal, webhook, and external secrets are configured; see known issues.
  • Rehearse backup/restore and the legacy Job/JobApplication cutover against a restored production backup before removing compatibility columns.

CV Builder preservation and next slice

The current builder already includes expandable sections, preset/free-text custom sections, section AI review, Code and other capability-aware templates, accent/typography controls, shared preview/PDF rendering, and extraction confidence handling. Preserve these under PRES-C02/C07/C08/C09/C12; they are not new backlog requirements. See the functionality inventory and 57-group preservation matrix.

CV preview margin, pagination and theme/template accuracy still require a dedicated rendering/PDF validation slice, as reiterated by Connor during P4-03. P4-03 only addresses the keyboard/viewport boundary. Define expected output and preserve current settings, templates and preview/PDF relationships before broader editor changes; do not restart already-completed builder features from archived plans.

Completed phase items are intentionally omitted here; their evidence remains in the current redesign checkpoint records and recoverable historical archive.