10 November 2026. The roadmap TODO tracks current work and protected decisions. This record is for direct execution in chat.

D01 — P10-01 / CLEAN-20

APPROVED AND EXECUTED. The owner replied “Approve CLEAN-20 only”. The approval covered the 38-line unimported job-tracker-ui/src/App.css at blob 74b5e053450a48a6bdb4d71aad648e7af821975c. Verification and publication are in P10-01. Another removal needs its own evidence and approval.

A3 implementation and final visual review

The owner selected A3, approved the implementation and approved progression through IM10. Final IM10 visual acceptance is pending a reviewable whole-application package. Read-only 2FA status and audit redaction are published. Factor recovery, private support access and live diagnostics each retain their separate decision.

Later decisions — not requested prematurely

Product-ranked scope, Global Jobs implementation and provider licences, I18N implementation and human language release, homepage design selection, security target/environment and material-risk disposition, and final release approval retain their own concrete review gates. Research does not grant these decisions. Do not ask for generic blanket approval or treat this list as completed sign-off.

Decision Options and recommendation Work held
Homepage concept selection Review the four published directions at ccb11494. Select or combine elements, then review the refined design. Keep product and pricing claims under their own review. LAUNCH-02 refinement and later public implementation
MFA recovery and private support access Review the separate technical proposals on the security branch. Prefer user-controlled recovery and explicit, scoped, revocable support consent. Retain present access while decisions are pending. Factor reset/change workflow and cross-owner private support access
Global Jobs entry and rights Review the accepted predecessor reports and provider rights before approving country/provider scope. Defer capabilities without documented access. GJ-01 onward and provider activation
Isolated diagnostics and recovery rehearsal Approve a specific disposable target, fixtures and operational acceptance criteria once the plan is ready. Retain production separation. Real rollback, restore and diagnostic execution
Performance infrastructure Keep the current topology while measurement is incomplete. Compare isolated replica, CDN and pool experiments only against a measured capacity or latency need. Any external service, paid plan, DNS or production topology change
Final qualification Review the source-bound A3, Phase 10, locale, security and release packages independently at their required gates. Final milestone and production release decisions