Direct roadmap status

Updated 9 November 2026. This register records direct-chat work. See the continuation checkpoint for exact integration refs and evidence.

Workstream/checkpoint Status Dependency and evidence
PHASE-10 / P10-00 assessment COMPLETED Report in ../redesign/phase-10/P10-00.md; assessment 7ba1367, publication receipts 8cdff28/1692142. Remote exactly 1692142295950e390a4cf807d9df86cc5cf96290 on 2 November
P10-01 / CLEAN-20 VALIDATED AND PUBLISHED Owner approved only the unused App.css removal. Source and receipt at 78f7396a. See P10-01
P10-02 CV/documents REVIEWED, RETAIN Historical document and import compatibility kept. See P10-02
P10-03 backend/dependencies/config REVIEWED, RETAIN No additional proven-safe removal. See P10-03
P10-04 functional/data verification PARTIAL 103 distinct historical backend cases and 92 frontend tests reconciled. Environment and recovery limits in P10-04
P10-05 full acceptance OPEN Full local backend passed 1,448 tests. Full frontend passed 1,031 tests across 112 suites. Independent audit and preservation closure remain open. See P10-05
PRODUCT-REVIEW-01 FINAL REVIEW BLOCKED Final audit requires accepted Phase 10. Approved A3 work advances separately under the owner's direct authorisation
A3 UI/UX modernisation IM10 IN PROGRESS Owner approved IM09 and IM10. Visual comparison, outstanding route states, combined qualification and final Gate F remain open
INT-GLOBAL-JOBS-01 / GJ-00 CONDITIONAL Existing planning at 0ec9f98e6ed4a646fc5e017d8eb6fade07653f37; exact remote reverified 2 November. No implementation authorised
INT-GLOBAL-JOBS-01 implementation BLOCKED Accepted Phase 10/Product Review, initiative approval and provider rights
I18N-01 / I18N-00 audit PARTIAL All 188 historical dynamic call reviews accounted for in published 4172c23d. Full visible-text, native, market and European coverage remain open
I18N-01–08 implementation/acceptance PARTIAL Bounded EN/NB improvements tested and published. Later stage prerequisites, native review and additional locale publication remain separate
LAUNCH-SITE-01 / LAUNCH-00 audit PARTIAL Design-neutral content, locale and crawlable HTML/SEO contracts published at af8c48ce. Rendered design and public claims decisions remain open
LAUNCH-01 four desktop/mobile concepts PENDING No viewable concepts produced; eligible independent task after completing audit inputs
LAUNCH-SITE final design/implementation AWAITING_APPROVAL Four concrete concepts must be delivered before owner selection; no final design auto-selection
SECURITY-AUDIT-01 OFFLINE PREFLIGHT PARTIAL Approved root policy published at de3d5031. Formal integrated scan requires a completed application baseline and applicable environment/cost approval
RELEASE-READINESS-01 / discovery and RR-11 PARTIAL Parser fix f19e7ebf published with 31 offline tests. RR-12/13 still require isolated rollback, restore and off-host encryption evidence
Release stages 2–7 baseline, qualification, remediation, requalification, rehearsal, final acceptance BLOCKED Final release candidate/prerequisites not accepted; each stage needs actual applicable environment and source-bound evidence

Implemented, tested, accepted, published and production-ready are separate. Production is NO-GO. Historical counts are not fresh executions. See blockers, owner decisions, completed work and next actions.