4.0 KiB
4.0 KiB
JobTracker session handoff
Updated: 2026-08-15
- Exact current task: no independent implementation remains. SEC-009, PROD-001 read-only inventory/reporting and the PROD-003 plan-only benchmark harness are complete; continue only after a recorded blocker is authorized/resolved.
- Last completed step: repaired and regression-tested the full historical migration chain for standalone SQLite tooling and provider-aware application startup, including a disposable MariaDB 11.8 fresh/restart rehearsal.
- Files currently modified: master progress/work-plan/handoff/decisions/blockers/evidence; SEC-009 verification; production hardware/rollout/benchmark reports; production backup checkpoint; Ollama benchmark script/tests.
- Commands already run: SEC-009 focused backend 21/21, backend 657/657, frontend focused 8/8 and full 237/237, optimized build, EF parity, MariaDB script generation and Chromium 9/9; benchmark harness 4/4 plus plan-only dry run; sanitized read-only SSH inventory and gzip integrity across 21 existing dumps.
- Test results: all repository gates pass. PROD-001 is PASS/PARTIAL because measured all-interface ports and incomplete/stale backup/restore evidence fail its safety acceptance. No model inference was run. Jest retains the documented open-handle notice.
- Services currently running: none on task-owned ports 3000/5202. Playwright stopped its disposable API/Next servers. Pre-existing Docker services were not changed.
- Temporary files or processes: no task-owned process is running. Playwright stopped its disposable API/Next servers. No raw benchmark output/evidence file was created.
- Production changes currently active: none. Read-only SSH observed metadata/health/selected non-secret settings and backup integrity only. No log/private-row/content/secret read, deployment, migration, provider call, inference, model pull, restart, backup, restore or production file/config change occurred.
- Rollback status: SEC-009 is additive migration
20260815164027_AddAccountDeletionLifecycle. Keep deletion disabled, reconcile any durable request, and retain tombstones before downgrade.842e793is pushed. Production still runsde937d25dc5e/ version157; its checkout has a pre-existing mode-onlydeploy/deploy.shchange that must be preserved/reviewed. - Uncommitted changes: documentation and the plan-only Ollama benchmark harness/tests following pushed SEC-009 commit
842e793; no dependency, model, application runtime, schema or production state change in this checkpoint. - Known failures: PR 28's newest remote CI is not yet confirmed. Production publishes frontend 3000 and JobTracker Ollama 11434 on all interfaces; latest observed database-only backup is 2026-08-02; no complete files/keys/tombstone restore proof; root is 83% used; deployed AI sidecar is old direct-Gemini behavior; production script mode is dirty. SEC-006 internet access, SEC-007 dependency, provider/re-consent, Stripe price, signup, retention/legal, backup/restore, model execution/deployment and legacy cutover decisions remain recorded blockers. JT-019's blank-chain defect is fixed, while dual ownership remains debt; Jest open handles remain.
- Exact next action: after this documentation/harness checkpoint is committed and pushed, stop. Resume from the highest-priority blocker the user authorizes: recommended first is production network plus complete backup/scratch-restore safety, then bounded synthetic model benchmarking.
- Work that can continue independently: none identified after the PROD-003 harness. Do not bypass blockers by pulling models, changing ports/firewalls, restoring data, contacting providers, or using package indexes without explicit authority.
- Decisions still required from the user: production network/port mutation; complete backup and scratch restore; retention/tombstone/legal policy; model pull/synthetic production inference; deployment/worker activation; parser package-index access; provider/Stripe/signup actions; legacy cutover timing.